ML20197J554

From kanterella
Jump to navigation Jump to search
Forwards Unit 1 Cycle 9 90-Day ISI Summary Rept IAW IWA-6220 & IWA-6230 of ASME Code,Section Xi.Request for Relief Will Be Submitted to NRC Timeframe to Support Second 10-year Insp Interval,Per 10CFR50.55a
ML20197J554
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/10/1998
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197J559 List:
References
NUDOCS 9812150141
Download: ML20197J554 (2)


Text

V Tennessee Valley Autwity. Post Offect Box 2000. Soddy-Daisy Tennessee 37379 December 10, 1998 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Des::

Wa shir.gton,

D.C.

20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CYCLE 9 (U1C9) 90-DAY IN-SERVICE INSPECTION (ISI) GUMMARY REPORT l

Enclosed is SON's U1C9 ISI Summary Report that contains an historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from May 12, 1997 to October 8,

[

1998.

Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6230 of ASME Code,Section XI.

Section 8 of this report summarizes five weld examinations, which did not receive code required examination

/L coverage due to design configuration, access limitations, etc.

In accordance with 10 CFR 50.55a, request for relief will be submitted to NRC in a timeframe to support the 2"d 10-year inspection interval.

Please direct questions concerning this issue to me at (423) 843-7170 or J.

D. Smith at (423) 843-6672.

Si

ely, r

Pe Salas g

Licensing and Industry Affairs Manager Enclosure cc:

See page 2 9812150141 981210 PDR ADOCK 05000327 G

PDR

r.

I U.S.

Nuclear Regulatory Commission Page 2 December 10, 1998 r

i cc (Enclosure):

Mr.

R.

W.

Hernan, Project Manager Nuclear Regulatory Commission-One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S.

Nuclear Regulatory Commission Resion II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, Georgia 30303-3415

{:

I

.M-