Provides Clarification of Topical Rept Associated with Insertion of Limited Number of Lead Test Assemblies Beginning with Unit 2 Operating Cycle 10 Core
ML20155J403
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/05/1998
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9811120150
Download: ML20155J403 (2)


Text

j Tennessee Valley Authority, Post Offce Box 2000. Soddy-Daisy, Tennessee 37379-2000 November 5, 1998 1

U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

l In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - CLARIFICATION OF THE TOPICAL REPORT FOR THE INSERTION OF LEAD TEST ASSEMBLIES (LTAs)

CONTAINING URANIUM-236 INTO THE UNIT 2 CORE

Reference:

TVA letter to NRC dated August 7,

1998 The purpose of this submittal is to provide a clarification of the topical report associated with the insertion of a limited number of LTAs beginning with the Unit 2 operating Cycle 10 core.

The topical report was previously submitted for y>tu: review on August 7, 1998.

As discussed in a telephone conversation with the staff on October 26, 1998, the topical report provides the analysis to support the placement of four LTAs in the Unit 2 operating

/

Cycle 10 core.

These four LTAs will remain in the core for a

,/)

period up to three operating cycles, and based on the approved analysis provided in the topical report, no other LTA's of this type will be placed in the core.

The use of k}v;>gg) additional assemblies will be supported by a separate submittal to NRC.

Please direct questions concerning this issue to me at (423) 843-7170 or Jim Smith at (423) 843-6672.

Sincere [y,

)

1

.m

, _ ' ' '; t 3

/

P r

alas cc:

See page 2 9811120150 981105P" PDR ADOCK 05000328 P

p

e e

i U.S.

Nuclear Regulatory Commission Page 2

. November 5, 1998 l

cc:

Mr.

R.

W. Hernan, Project Manager l

Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S.

Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 i

Atlanta, Georgia 30303-3415 l

l