- 3, v
g
,g,e
,M l%f n
' b a *s l N 4
?
(A
/O
.4 s
1
's'
,1 m
j i
+,!
a s:
> m"
+
k
- /;
L' O bTENNETEE VALLEY' AUTHORITYE
.j LSequoyahiNuclear Plant j
t e,
, Post Office; Box 2000t.
4
- Soddy-Daisy,rTennessee -37379 aM May,15,5 1990:
4 g
avv-MI 1
1 l;
l J.'
).
"\\ y dT:7 ;
t s
5 9
,;j
,t TVA-SQN-TS-89-27; i
'10;CFR'50.9T y
U;S; Nuclear Regulatory Commission ATTN Document Control Desk
~
Washington, D.C.,~20555L Si
'Gentlement.
1In the Matter ofJ
' )'
Docket Nos.1 50-327.
?O L
Tennessee Valley. Authority
- )
. 50-328L y
SEQUOYAH NUCLEAR. PLANT. (SQN)
' REVISION. TO TECHNICAL SPECIFICATION (TS)'
CHANGE 89 '
O
-Referencest
- 1. 1TVA letter to NRC' dated January 24,i1990, "SequoyahiNuclear?
Plant (SQN)1-Technical Specification.(TS) Change 189-27"i y
- 2. - TVA ' letter to: NRC dated April _- 23, 1990, ? '_'Sequoyah Nuclear Plant'(SQN)J-Eagle 21:Setpoint Methodology 7-?Westinghouser
'I Electric Corporation WJus 11239 and 11626" I
- Reference 1. transmitted to NRC proposedLTS changesDto reflect the'EagleI21 modification and functional upgrades to the SQN reactor protection. system.
1 Trip setpoints and allowable values:were calculated using standard Westinghouse setpoint methodology and thatLwas: transmitted:tolNRC.in' Reference 2.
~!O This le'tter transmits revised TS pages for the steam 1 generator. water level.
d adverse trip setpcints-(Table 2.3-1, Reactor Trip System Instrumentation Trip i
Setpoints? Items 13.a. and b,-and~ Table 3.3-4,. Engineered Safety Feature j
- Actuation System Trip Setpoints, Item 6;c) to ' account for :the' steam. generator, reference leg heatup environmental allowancefconsideringithe. effects'of~the
.j L
trip time delay..(TTD). The setpoints 'origina11y submitted _ by: Reference '1' did i
t.
not adequately' reflect the reference leg heatup environmental. allowance associated with the TTD-function. TVA wa's notified of this' discrepancy by Westinghouse Electric' Corporation.on May 11,'1990.
"[
,~
The proposed TS:89-27_ revision lis-identifiedLin Enclosure l'.
'Thelpages' i
provided in Enclosure 1 of this'1etter. supersede the corresponding pages provided in Enclosure _1 of Reference 1.
The-justification for the. proposed i
'TS!89-27-revision is provided in Enclosure 2..'The proposed TS 89-27 revision does not alter'the conclusions drawn'in the environmental. impact eva~1uation or' 1
L the no significant hazards consideration submitted with TS 89-27 (Reference 1).
Consequently, these evaluations are not resubmitted by'this; package.
j
.s yDR005210067 900515 9
- p ADOCK 050003 7 y,ig$
PD -
M 4
j 1, '
'R An Equal Opportunity Employer k-
{
p 1 -
I ', - * ' - -
7 r-e y
e f
9 9
9 1
-i
%s
^
t
.j
- -2 '
j U.S. Nuclear Regulatory Commission t
~
1 Pleasedirectq'uestionsconcerning[thi[-issuetoRussellR.Thompsonaty (615) 843-7470.
4
.Very trul'y yours, j
TENNESSEE VALLEY AUTHORITY Y.h,
b jvs.
j M. A.. Cooper Acting Manager..
1 Sequoyah Site ~ Licensing Sworn to' nd subscrlhc}OA/ 1990 before'me 3
this day of / N
~ AL/cuk H
Notary PuhPlic [/
~~
My Commission Expires /d d.
.r Enclosurr+
i cc: American. Nuclear, Insurers (Enclosures)
Attention: ~ Librarian.
~j The-Exchange. Suite 245 270 Farmington Avenue l
Farmington, Connecticut 06032 n
I Ms.S.C.-Black,AssistantDirector-(Enclosures)I
.)
l l-for Projects mi TVA Projects Division
-U.S. Nuclear Regulatory-Commission One White Flint, North 4
l 11555 Rockville Pike L
Rockville, Maryland 20852
)
Mr. Michael H. Mobley, Director f
(
Division of Radiological Health
{
l:
T.E.R.R.A. Building l
150 9th Avenue, N
( :'
Nashville, Tennessee 37203 L
3 L
NRC Resident Inspector (Enclosures)
Sequoyah Nuclear Plant L
2600EIgou' Ferry Road Soddy Daisy. Tennessee 37379-l Mr. B.:A. Wilson, Assiscant Director (Enclosures) for Inspection Programs TVA Projects Division n
U.S. Nuclear Regulatory Commission.
Region.II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323' j
l.
~
0
,