Text
.
1 l
Hl4 Tennessee VaHey Autnanty Post Oftce Box 2000. Soddy-Daisy. Tennessee 37379 December 29, 1998 U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 1 CYCLE 10 STEAM GENERATOR 90-DAY REPORT FOR VOLTAGE-BASED ALTERNATE REPAIR CRITERIA Enclosed is the SQN Unit 1 90-Day Steam Generator Report that supports continued implementation of the 2.0-volt, voltage-based repair criteria for Cycle 10 operation as outlined in NRC Generic Letter 95-05.
This report is submitted to you in accordance with SON Unit 1 License Condition 2.C. (9) (d).
The report was prepared by Westinghouse Electric Corporation.
TVA has reviewed the report and concurs with the results.
Please direct questions concerning this issue to me at (423) 843-7170 or J.
D. Smith at (423) 843-6672.
Sincerely,g
.[
I
- /
Pe alas Licensing and Industry Affairs Manager Enclosure go cc:
See page 2 c/
9901110401 981229 PDR ADOCK 05000327 p
PDR_.,
7J 1
]
U.S. Nuclear Regulatory Commission Page 2 i
December 29, 1998 cc (Enclosure):
Mr.
R. W.
Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303-3415 l
e
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)
UNITS 1 AND 2 UNIT 1 CYCLE 10 STEAM GENERATOR 90-DAY REPORT NR VOLTAGE-BASED ALTERNATE REPAIR CRITERIA i
i
(
l
_ _.