ML20154H619

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 COLR, IAW TS 6.9.1.14.c
ML20154H619
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/08/1998
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154H623 List:
References
NUDOCS 9810140271
Download: ML20154H619 (2)


Text

- . . . _ -

e, u '

  • I 1

l l

LTA-Tennessee ValWy Authonty, Post OHice Box 2000 Soddy-Daisy. Tennessee 37379 l

l I

October 8, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SQN) -

UNIT 1 CORE OPERATING LIMITS REPORT (COLR)

In accordance with SON Unit 1 Technical Specification 6.9.1.14.c, enclosed is the Unit 1 Cycle 10 COLR.

Please direct questions concerning this issue to me at (423) 843-7170 or J. D. Smith at (423) 843-6672. l 1

Sincerely, i

VA P- Salas Licensing and Industry Affairs Manager  ;

Enclosure cc: See page 2

\

\

\

d

\

9810140271 981008 7 l ADOCK 05000327 PDR P PDR g,

s ,

U.S. Nuclear Regulatory Commission P, age 2 October 8, 1998 cc (Enclosure):

Mr. R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 61 Forsythe St., SW, suite 23T85 Atlanta, Georgia'30323-2711 l