ML20154H619

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 COLR, IAW TS 6.9.1.14.c
ML20154H619
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/08/1998
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154H623 List:
References
NUDOCS 9810140271
Download: ML20154H619 (2)


Text

-

e, u '

  • 1 l

l LTA-Tennessee ValWy Authonty, Post OHice Box 2000 Soddy-Daisy. Tennessee 37379 l

October 8, 1998 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 1 CORE OPERATING LIMITS REPORT (COLR)

In accordance with SON Unit 1 Technical Specification 6.9.1.14.c, enclosed is the Unit 1 Cycle 10 COLR.

Please direct questions concerning this issue to me at (423) 843-7170 or J.

D. Smith at (423) 843-6672.

1 Sincerely,VA i

P-Salas Licensing and Industry Affairs Manager Enclosure cc:

See page 2

\\

\\

\\

\\

d 9810140271 981008 7

PDR ADOCK 05000327 P

PDR g,

s U.S.

Nuclear Regulatory Commission P, age 2 October 8, 1998 cc (Enclosure):

Mr.

R. W. Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 61 Forsythe St.,

SW, suite 23T85 Atlanta, Georgia'30323-2711