ML20141N311: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
(One intermediate revision by the same user not shown) | |
(No difference)
|
Latest revision as of 07:39, 12 December 2021
ML20141N311 | |
Person / Time | |
---|---|
Site: | Fermi |
Issue date: | 02/05/1986 |
From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
To: | Pierson D DETROIT NEWS, DETROIT, MI |
References | |
FOIA-85-834 NUDOCS 8603060130 | |
Download: ML20141N311 (2) | |
Similar Documents at Fermi | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N4261999-10-25025 October 1999
[Table view]Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09 Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA MONTHYEARML20245B4531989-06-0808 June 1989
[Table view]Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20151N2571988-06-30030 June 1988 Final Response to FOIA Request for Documents.Forwards Releasable Portions of App B Documents.Subj Documents Also Available in Pdr.Portions of App B Documents Withheld (Ref FOIA Exemption 3) ML20155K0211988-06-13013 June 1988 Partial Response to FOIA Request for Documents.Forwards App D Documents.App C Documents Available in Pdr.App E Documents Completely Withheld (Ref FOIA Exemption 5) ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20151C6641988-04-0404 April 1988 Partial Response to FOIA Request for Documents Re Info Assessment Team Notification & Alleged Valve Tampering. App a Documents Available in Pdr.Forwards App B Documents. App B Documents Also Available in PDR ML20196J7331988-03-0808 March 1988 Final Response to FOIA Request for Documents.Forwards App D Documents.Apps C & D Documents Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 5) ML20149H1421988-02-16016 February 1988 Final Response to FOIA Request for Documents Re Ofc of Investigations Investigation Re Facility.Forwards Documents in App L & M.Documents in App M Partially & Completely Withheld (Ref FOIA Exemptions 4,5,6 & 7) ML20237B6801987-12-11011 December 1987 Final Response to FOIA Request for Documents Re 850702 Criticality Event.Forwards App F & G Documents.App E,F & G Documents Also in Pdr.App G & H Documents Partially & Totally Withheld (Ref FOIA Exemptions 6 & 5),respectively ML20245C4051987-10-29029 October 1987 Final Response to FOIA Request for Records.App a & B Documents Available in Pdr.App a Documents Encl ML20235F8141987-09-24024 September 1987 Partial Response to FOIA Request for Documents.Forwards App B,C & D Documents.App a & B Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 4).App D Documents Withheld in Entirety (Ref FOIA Exemptions 5 & 6) ML20237J5151987-08-19019 August 1987 Final Response to FOIA Request for Documents Re Facility. Apps E,F & G Records Being Made Available in PDR & Lpdr in Monroe,Mi & Encl.Portions of Apps E,F & G Records Withheld (Ref FOIA Exemptions 6 & 7) ML20234B9651987-06-29029 June 1987 Ack Receipt of 870507 Petition Re Alleged Deficiencies of Facility Safeteam Program.Petition Referred to Staff for Action,Per 10CFR2.206.List of Bases for Relief Requests Confirmed,Including Firings Due to Safeteam Allegations IA-86-362, Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4)1987-06-19019 June 1987 Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4) ML20215H3041987-06-19019 June 1987 Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Appeal Denied.Documents Previously Withheld Will Continue to Be Withheld (Ref FOIA Exemption 4) ML20214A5231987-05-15015 May 1987 Partial Response to FOIA Request for Documents Re Safeteam at Facility.Forwards Documents Listed in App C.Portions of Document 2 in App C Withheld (Ref FOIA Exemption 6).App D Documents Completely Withheld (Ref FOIA Exemption 4) ML20215M6581987-05-0808 May 1987 Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Portions of Five Documents Continue to Be Withheld (Ref FOIA Exemption 4) IA-86-430, Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Portions of Five Documents Continue to Be Withheld (Ref FOIA Exemption 4)1987-05-0808 May 1987 Further Response to Appeal Re Denial of FOIA Request for Documents Re Facility.Portions of Five Documents Continue to Be Withheld (Ref FOIA Exemption 4) ML20235G1811987-03-30030 March 1987 Ack Receipt of Re Adequacy of Facility Safeteam & Scope of NRC Review of Safeteam Files.Advises That Specific Factual Info Required for Processing 2.206 Petition & All Info Obtained by Gap Re Safety Issues Should Be Provided ML20207R2411987-03-12012 March 1987 Final Response to FOIA Request.Forwards App B Documents.App C Documents Withheld (Ref FOIA Exemption 4) ML20211Q2871987-02-26026 February 1987 Final Response to FOIA Request for Documents Re Main Steam Bypass Line Failure at Facility.Forwards App D Documents.App C & D Documents Available in PDR ML20210T2121987-02-12012 February 1987 Partial Response to FOIA Request for Documents Re Facility. Forwards App a Document.Document Also Available in PDR & Lpdr ML20210T1871987-02-0909 February 1987 Partial Response to FOIA Request for All Records Re Main Steam Turbine Bypass Lines at Facility.Forwards App B Records.App a & B Records Available in PDR ML20212R4761987-01-29029 January 1987 Final Response to FOIA Request for Four Categories of Records Re Fermi Plant.Documents Identified on Encl App D Withheld (Ref FOIA Exemptions 2,5 & 7) ML20207Q5901987-01-21021 January 1987 Responds to FOIA Request to DOL for Documents Re Investigations at Plant.App a Documents Already Available in Pdr.Documents Listed in App B Encl IA-86-519, Final Response to FOIA Request for Documents Re 850701 Control Room Mishap & Probe of Util Confidential Whistleblower Program.Documents Listed in App a in Pdr. Documents Listed in App B Withheld (Ref FOIA Exemption 7)1987-01-16016 January 1987 Final Response to FOIA Request for Documents Re 850701 Control Room Mishap & Probe of Util Confidential Whistleblower Program.Documents Listed in App a in Pdr. Documents Listed in App B Withheld (Ref FOIA Exemption 7) ML20207Q0901987-01-16016 January 1987 Final Response to FOIA Request for Documents Re 850701 Control Room Mishap & Probe of Util Confidential Whistleblower Program.Documents Listed in App a in Pdr. Documents Listed in App B Withheld (Ref FOIA Exemption 7) ML20207F4771986-12-24024 December 1986 Final Response to Appeal Re Denial of FOIA Request for Documents Re Util Health Physics Dept.Documents 1-4 & 7 & Portions of Documents 5 & 6 Listed on App Encl & Placed in Pdr.Portions of Documents Withheld (Ref FOIA Exemption 6) ML20211K9461986-12-0909 December 1986 Responds to Appeal Re Denial of FOIA Request for Documents Concerning Plant.Forwards App a & Portions of App B Documents.App B Documents Completely & Partially Withheld (Ref FOIA Exemptions 5,6 & 7) ML20214U3951986-12-0303 December 1986 Responds to FOIA Request for Documents Re Plant.Documents Listed in App a Forwarded to PDR & Encl.Documents Listed in App B Withheld (Ref FOIA Exemption 7) ML20214K5171986-11-20020 November 1986 Responds to FOIA Request for Documents Re Preliminary Enforcement Conference W/Util.App B Documents Available in Pdr.Forwards App C Documents.Documents in App D Completely Withheld (Ref FOIA Exemption 5) ML20197C3241986-10-31031 October 1986 Partial Response to 860819 Appeal of Dh Grimsley 860716 Denial of FOIA Request for Documents Re Plant.Document 1 on Encl App Continues to Be Withheld (Ref FOIA Exemption 6) & Documents 2-5 Still Under Review for Confidential Nature ML20197C1791986-10-31031 October 1986 Partial Response to 860819 Appeal of Dh Grimsley 860716 Denial of Eleven Documents Subj to FOIA Request for Documents Re Fermi Plant.App a Documents Encl.App B Documents Withheld (Ref FOIA Exemption 7) ML20211C8551986-10-0909 October 1986 Responds to Appeal Re Denial of FOIA Request for Documents Re Fermi Plant.Forwards App a Documents.App B Documents Withheld (Ref FOIA Exemption 5) ML20210N2271986-09-30030 September 1986 Responds to FOIA Request for Three Categories of Documents Re Plant.App a Documents Withheld (Ref FOIA Exemption 5) ML20215C2071986-09-29029 September 1986 Responds to FOIA Request for Documents Re NRC Insps & Evaluations of Facility Health Physics Dept from Jan 1984 to Present.Forwards Documents Listed in App.Portions Partially or Completely Withheld (Ref FOIA Exemptions 4-7) ML20214T5391986-09-26026 September 1986 Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR IA-86-374, Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR1986-09-26026 September 1986 Responds to Appeal of Denial of FOIA Request for Documents Re Nrr,Ie & Region III Onsite Review of Plant Safeteam Allegations on 850627 & 28.Documents Re Audit Provided in Response to FOIA 86-356 & Available in PDR ML20210N2901986-09-25025 September 1986 Responds to Appeal of Denial of FOIA Request for Documents Re Plants.App a Documents Partially or Completely Withheld (Ref FOIA Exemption 5) ML20210G7251986-09-23023 September 1986 Final Response to FOIA Request.Forwards Documents Listed in App.Documents Also Available in PDR ML20214Q2541986-09-19019 September 1986 Suppls Author & Responds to Concern Re Cracks in Base Mat Slab of Reactor Bldg.Cracks in Base Mat Do Not Impair Base Mat from Carrying Design Static & Seismic Loads.Consultant & Sections of Insp Repts Encl ML20209H7311986-09-12012 September 1986 Responds to 860516 Request for Documents Re Insp Rept 50-341/85-37.Forwards App Documents.No Further Action Taken on Appealing Lack of Response to Request ML20209H4901986-09-0808 September 1986 Responds to 860819 Appeal of Denial of FOIA Request for Documents Re Facility.Forwards App C Documents.Portions Withheld (Ref FOIA Exemption 5) ML20214L8431986-09-0505 September 1986 Final Response to FOIA request.PNO-III-86-069,Reportable Events 05492 & 05491,Daily Rept Riii,Deviation/Event Rept & Slides Re Inadvertent ECCS Actuation Encl & Also Available in PDR IA-86-550, Final Response to FOIA request.PNO-III-86-069,Reportable Events 05492 & 05491,Daily Rept Riii,Deviation/Event Rept & Slides Re Inadvertent ECCS Actuation Encl & Also Available in PDR1986-09-0505 September 1986 Final Response to FOIA request.PNO-III-86-069,Reportable Events 05492 & 05491,Daily Rept Riii,Deviation/Event Rept & Slides Re Inadvertent ECCS Actuation Encl & Also Available in PDR ML20214L2181986-09-0404 September 1986 Final Response to FOIA Request Re Facility Dryer.Forwards Documents Listed in App.Documents Also Available in PDR IA-86-551, Final Response to FOIA Request Re Facility Dryer.Forwards Documents Listed in App.Documents Also Available in PDR1986-09-0404 September 1986 Final Response to FOIA Request Re Facility Dryer.Forwards Documents Listed in App.Documents Also Available in PDR DD-86-10, Informs That Commission Declined to Review Director'S Decision DD-86-10.Decision Became Final Agency Action on 860825.Served on 8608271986-08-26026 August 1986 Informs That Commission Declined to Review Director'S Decision DD-86-10.Decision Became Final Agency Action on 860825.Served on 860827 ML20203L5051986-08-26026 August 1986 Further Response to FOIA Requests for Documents Generated or Prepared by V Stello.Forwards App L & M Documents.Documents Also Available in Pdr.App M Document Partially Withheld (Ref FOIA Exemption 5) ML20205D1331986-08-0707 August 1986 Partial Response to FOIA Request Re Insps at Facility. Records Subj to Request Identified by Accession Number on App C.Records Available in PDR & Lpdr ML20214K8761986-08-0707 August 1986 Partial Response to FOIA Request for Documents Re Fermi 2 Nuclear Power Plant.Records Subj to Request Identified by Accession Number on App B.Records Available in PDR 1989-06-08 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217N4261999-10-25025 October 1999
[Table view]Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209E9991999-06-30030 June 1999 Forwards Insp Rept 50-016/99-01 on 990614-17.No Violations Noted.Potential Weakness in Airborne Effluent Concentration Assessment Identified ML20209B2471999-06-29029 June 1999 Informs That NRR Revised Schedule for Conversion of Fermi 2 TS to Improved Std Ts.Planned Amend Date Has Been Moved to 990930 & Date for Draft Amend Has Been Moved to 990806 ML20207E4961999-06-0101 June 1999 Forwards Insp Rept 50-341/99-07 on 990402-0515.One Violation of NRC Requirements Occurred Re Failure to Keep TS Requirements Re Approval of Overtime Deviations.Violations Being Treated as non-cited Violations,Consistent with App C ML20207D3311999-05-26026 May 1999 Forwards Insp Rept 50-341/99-04 on 990503-07.No Violations Noted.During Insp,Nrc Observation of Licensee Activities Showed Radiological Emergency Response Preparedness Program Maintained in Effective State of Operational Readiness ML20206N7351999-05-14014 May 1999 Forwards RAI Re Plant Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions ML20206N4621999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart Encl ML20206J9131999-05-10010 May 1999 Forwards SE Finding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, ML20206Q7041999-05-0606 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-341/99-02 on 990308 ML20206G4931999-05-0505 May 1999 Refers to DE 980804 Requests for Relief (PR-8,Rev 2 & PR-12) from IST Requirements of ASME Code for RHR Pumps.Review of Relief Requests Completed.Se Approving Relief Requests Encl ML20206K4031999-04-29029 April 1999 Forwards Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Concern Expressed Over NRC Observations of Poor Performance Demonstrated During Some Contingency Response Drills ML20205T3841999-04-23023 April 1999 Forwards Insp Rept 50-341/99-03 on 990218-0401.Two Violations Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20205S8481999-04-20020 April 1999 Informs That Changes in Rev 22 Do Not Decrease Effectiveness of Emergency Plan & Plan Continues to Meet Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50.NRC Approval Is Not Required ML20205Q7001999-04-15015 April 1999 Forwards Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl,In Response to 980717 Application.Related SER & Notice of Issuance Also Encl ML20205P1691999-04-14014 April 1999 Forwards Insp Rept 50-341/99-06 on 990315-19.No Violations Noted.Insp Focused on Aspects of Radioactive Effluent Monitoring,Liquid Waste Processing,Esf Filtration & CR Habitability & Solid Waste Mgt & Transportation Programs ML20204E4061999-03-19019 March 1999 Forwards Insp Rept 50-341/99-05 on 990308-11.No Violations Noted.Insp Concluded That Fire Protection Program Was Effective ML20204E0271999-03-17017 March 1999 Forwards SE Accepting Licensee & Suppl, ,which Requested NRC Approval of Alternative Rv Weld Exam,Per 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5), for Plant,Unit 2 for 40-month Period ML20207L7281999-03-0909 March 1999 Informs That Util Ltrs & 981026 Responding to GL 96-01, Testing of Safety-Related Logic Circuits, Completes Licensing Action for Fermi 2 ML20207J1401999-03-0808 March 1999 Forwards Insp Rept 50-341/99-02 on 990111-29 & Notice of Violation.One Violation Identified in Area of Design Control.Violation of Concern Because Errors Existed in Three of Six Calculations Reviewed ML20207G5711999-03-0404 March 1999 Discusses 990301 Meeting Between GL Shear,M Mitchell, D Williams,C Budnik & M Clements Re Current Status of Radiation Protection Program at Facility ML20207E2491999-02-22022 February 1999 Discusses Licensee 980617 Updated Response to GL 96-05 Indicating Intent to Implement Provisions of JOG Program for MOV Periodic Verification for Fermi-2.Forwards RAI Re Fermi-2 Response to GL 96-05 ML20207E6451999-02-22022 February 1999 Submits Correction to Insp Rept 50-341/98-15 Issued on 981207.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation ML20203F6761999-02-11011 February 1999 Forwards Request for Addl Info Re Conversion to Improved Standard Ts,Section 3.6 for Fermi 2 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203F6911999-02-10010 February 1999 Discusses Completion of Licensing Action for Bulletin 96-03, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling-Water Reactors, ML20203G6411999-02-0808 February 1999 Informs of Receipt of Encl FEMA Correspondence Received 990119,transmitting FEMA Final Exercise Rept for 980608 Plume Exposure Pathway Exercise at Enrico Fermi II Npp.No Deficiencies Were Identified During Exercise ML20202H8881999-02-0404 February 1999 Clarifies Intent of RAI Re Plant Staff Qualifications & Reg Guide 1.8,Rev 2, Qualification & Training of Personnel for Nuclear Power Plants, Dtd Apr 1987.Staff Position on Issue Neither New Nor Different Position from Previous Position ML20202H6111999-01-25025 January 1999 Requests Addl Info Re Conversion to Improved Std Tss, Section 3.5 for Fermi 2 ML20206S1111999-01-21021 January 1999 Forwards Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted.Inspectors Noted Potential Trend Re Documented Operability Assessments That May Not Have Been Performed for C/A Resolution Documents ML20199G7561999-01-14014 January 1999 Forwards Request for Addl Info Re Conversion to Improved Stds Tss,Section 3.3 for Plant ML20198S3101999-01-0606 January 1999 Forwards Amend 15 to License DPR-9,consisting of Changes to TS in Response to 980128 Application.Related SER & Notice of Issuance,Also Encl 1999-09-09 |
Text
._
e
- pa kaseq'o
' g UNITED STATES 0
Y Q&
,[ g NUCLEAR REGULATORY COMMISSION 3 E WASHINGTON. D. C. 20555
~s
...../
Mr. Dudley K. Pierson g3 g The Detroit News Lansing Bureau
- 209 North Seymour IN RESPONSE REFER Lansing, MI 48933 TO F01A-85-834
Dear Mr. Pierson:
This is in response to your letter in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of (1) the Office of Investigation's (01) report on the July 2,1985, inadvertent criticality incident at the Enrico i Fermi 2 plant potential coverup, and (2) all 0I communications to utility j officials regarding the incident, specifically to Chairman W. McCarthy.
I OI staff have advised this office that they have had no written communication .
with the utility regarding this incident.
l The 01 report is currently undergoing OI headquarters review and will not be considered for potential release until that review is completed. The 01 staff was unable to provide this office with a time estimate regarding the completion of their review. This report was compiled for law enforcement purposes and is being(withheld from public and F0IA 5 U.S.C. 55?(b)(7)(A)) disclosure 10 CFRpursuant to Exemption 9.5(a)(7)(1) (7)(A) of the of the Commission's regulations. Release of this document would interfere with an enforcement proceeding and could allow those being investigated to learn the scope, direction, and focus of investigatory efforts. That information could possibly allow the individuals to take action to shield potential wronadoing or a violation of NRC requirements from investigators.
Pursuant to 10 CFR 9.15 of the Commission's regulations, it has been detemined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for this denial is Mr. Ben B. Hayes, Director, Office of Investigations.
l 8603060130^ 860 W j 85-834 PDR NRS 1
1
f Mr. Dudley K. Pierson _p.
This denial may be appealed to the Secretary of the Commission within 30 days from the receipt of this letter. Any such appeal Fur.t be in writico, addressed to the Secretary of the Comission, U.S. Nuclear Regulatory Comission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F01 A Decisinn."
Sincerely,
. in d lu-Q Donnie H. Grinsley, Director Division of Rules and Recorh.
I Office of Administration 9
F 1
I l
l l
1