Partial Response to FOIA Request for All Records Re Main Steam Turbine Bypass Lines at Facility.Forwards App B Records.App a & B Records Available in PDR
ML20210T187
Person / Time
Site: Fermi, Grand Gulf, 05000000
Issue date: 02/09/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Puntenney J
SAFE ENERGY COALITION OF MICHIGAN
Shared Package
ML20210T193 List:
References
FOIA-87-50 NUDOCS 8702180102
Download: ML20210T187 (5)


Text

January l' ,1987 SAFE ENERGY COALITION OF MICHIGAN P.O. BOX 331 MONROE,. MICHIGAN 48161 Freedom "of Information Officer FREEDOM OF INFORMATION U.S. Nuclear Regula' tory Commission ACT REQUEST Washington, D.C. 20555 fd{[4-f7-gG

Dear Sir /Ms. :

Pursuant the Freedom of Information Act. 5 USC 552 et Seq. as amended, the Safe Energy Coalition of Michigan hereby request material as described below:

All information, including documents, reports, minutes, memos, transcri;.;,

etc. pertaining to the Main Steam Turbine Bypass Lines at Fermi - 2.

( a.) This should include information generated at the December 11, 1986 meeting in Bethesda Maryland.

(b.) Also included should be information generated between Region 111 and Detroit Edison, Region III and other parties, such as the Fermi-2 Independent Overview Committee, Monroe Cobnty government officials, INp0, etc.

( c.) Also included should be information pertaining to systems directly or indirectly deviating due to the tiain Steam Bypass Lines vibration. This should include information on the cracks in instrument lines the week of January 5,1987.

( d.) . Also included should be information on the design of the Main Steam Bypass Lines, and all information on their life expectation. Included shcald be their specifications for piping qualifications, in other words what catemry of piping.

This request should ~ include documentations pertainiiig to the Fall 1985 prom. , as well. '

Pursuant, 5 USC 552 (a) (4)(A), we hereby request waiver of a .1 fees in connection with this request "because furnishing the in! . aa-tion can be considered primarily benefitting the general public." If any fees are to be charged in connection with this request, please notify us in advance for approval at the above address or at this telephone number 313-477-3441 or 313-477-1670. This advance notice l shall not be necessary if the fees are to be less than $ 15 00 in total.  :

We look forward to your response within ten (10) business days I after you receive this request, as specified in the Act, (FOIA). Thank you for your help in this matter.

Sincerely, /

8702180102 870209 - W L '

4TE 87-50 PDR enni er E. Puntenney

APPENDIX A RE: F01A-87-50 DOCUMENTS ALREADY IN THE PDR t-

1. 05/17/64 CECO ltr to J. G. Veppler from R. S. Lenart re:

Preoperational . Testing Procedures Related to the Piping Vibration and Dynamic Effects Program w/ attachment (2 pages) Accession !!o. 8406050170.

2. 09/19/85 Preliminary Notification cf Event or Urcsual Occurrence--PNO-III-85-83 (1 page) Accession No. 8509240163
3. 10/31/85 Inspection Report No. 50-341/85045 PDR ADCCK 05000341C E51031 8511050036A
4. 01/10/86 Inspection Report No. 50-341/85049 PDR ADOCK 05000341Q 860110 8601160173A
5. 07/07/86 Comission Meeting Transcript (108 pages) Accession No. 8607110404
6. 07/22/86 DECO ltr to E. 6. Adensam frun F. E. Agosti re:

Service Life of Main Steam Bypass Lines w/ attachment Cetroit Ecisen's Evaluation of Hopper and Associates Report HA-5/86-494 ,10 pp) Accession No. 8607:50002

7. 08/01/86 DECO ltr to E. G. Adensam frcm F. E. Agosti re:

Radiological Analysis of a Rupture of One Main Steam Bypass Line w/ enclosure, Radiological Analysis of a Rupture of a Main Steam Bypass Line (19 pages)

Accession No. 8608060068.

8. '10/16/86 Deco ltr to E. G. Adensam from F. E. Agosti re:

Service Life of Main Steam Bypass Line w/ attachment, Main Steam Bypass System Testing Prograr: Peport (25 pages) Accession No. 861022D177

9. 11/07/86 Deco ltr to E. G. Adensam from F. E. Agosti re:

l Service Life of Main Steam 8ypass Lire (2 pages)

Accession No. 8611170335

10. 11/26/86 Memo to E. G.

Forthcoming Adensam from J. J. Stefano re:

Meetin Company (DECO) re:g with the Detroit Edison Fenni-2 Main Steam Turbine Bypass Line Flow-induced Vibration w/ enclosures (15 pages) Accession No. F 12050V3

RE: F01A-87-50'

. APPENDIX A (con't) t,

11. 12/03/86 ' Inspection Report No. 50-341/86032 PDR A00CK 05000341Q 861203 8612090873B l12. 12/03/86 Notice of Violation POR ADOCK.05000341Q 861203 8612090573A 13* 01/02/87 ' Preliminary Notification of Event or Urusual Occurrence--PNO-III-87-001(1 page)AccessionNo. 8701080282 14* 01/06/87 Preliminary Notification of Event'or Ur. usual Occurrence--PNO-III-87-01A (1 page) Accession No.-8701120135
15. 01/08/87 Preliminary Notification of Event or Unusual Occurrence--PNO-III-87-01E (1 page) Accession No. 8701160035

RE: F01A-87-50 APPENDIX B DOCUMENTS BEING PLACED IN THE PDR &

LPDR*

1. 10/12/84 Memo to Multiple Addressees from R. C. Lewis-re: Potentially Generic Prcblem at Grand Gulf Regarding the Main Steam Bypass Lines w/ enclosures

.(5 pages)

2. 11/02/85 Deviation / Event Peport No.85-701 (2 pages)
3. 11/21/85 Inspection Plan re: Fermi 2(1page)
4. 09/19/85 RIII' Daily'Peport (1 page) 5* 12/10/85 Memo to .C. J. Paperiello from C. Weil re: Main Steam Bypass Line Welds at Fermi (50-341) (AFS No. RIII-85-A-0200) w/ enclosure, Memo, dtd 12/09/85, to C. Weil frorr M. Parker re: Alle en Main Steam Eypass Line (2 pages)gation Fermi, Welds
6. 01/17/8E Briefing Package for V. Stello, Acting EDO (13 pages)
7. 02/28/86 DECO memo to E. Preston, Jr., from J. R. Green re:

Main Steam Bypass Lines lirritations (3 pages)

8. 03/86 Enclosure 5, Main Steam Bypass Lines (1 page)
9. 03/04/86 DECO memo to N. Shimshock from L. C. Fron re: Service Life of Fermi !! Turbine Steam Bypass Piping (16 pages)
10. 05/15/86 Hopper and Associates ltr from D. M. Hopper w/ attachment Sumary of Procedure for Fatigue Crack Growth Analysis of Steam Bypass Pipeline (33 pages)
11. 01/02/87 Deviation Event Report No.87-010(2pages)
12. 01/02/67 Deviation Event Report No.87-011 (20 pages)
13. 01/06/87 Memo to B. R. Sylvia from J. R. Calhoun re: Test Condition 2 (1 page)
14. 01/07/87 Memo to C. J. Paperiello frcm E. G. Greenman re:

Pecuest for Assistance -- Apparent Vibration Induced failures of Main Steam Line Attacta:ents et Fermi 2 (2 pages)

15. 01/12/87 Memo to E. G. Adensam from G. C. Lainas rc: Fermi Unit 2: Main Steam Bypass Line Failure (TAC #63376)

(3pages)

~~

RE: -F0IA 87 APPENDIX B (con't)

Date Description

16. 01/14/87 Ltr from J. J. Stefano re: Meeting Summary _ for December 11, 1986, Meeting on Main Steam Turbine Bypass Flow Line Failure w/ enclosures (18 pages)
17. 01/21/87 Agenda for Detroit Edison /RIII Meeting w/ Draft ltr re: Long-Term Monitoring of the Main Steam Bypass Lines w/ handout configuration drawings (20 pages)
18. Undated Sttam Bypass System Study for Enrico Fermi Unit 2 (26 pages)