ML20147B447: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20147B447
| number = ML20147B447
| issue date = 01/09/1987
| issue date = 01/09/1987
| title = Forwards Corrections to Ofc of Inspector & Auditor Rept, Allegations of Misconduct by Region IV W/Respect to Comanche Peak Steam Electric Station, Forwarded by Chairman Zech 861210 Ltr.Changes Do Not Affect Rept Conclusions
| title = Forwards Corrections to Ofc of Inspector & Auditor Rept, Allegations of Misconduct by Region IV W/Respect to Comanche Peak Steam Electric Station, Forwarded by Chairman Zech .Changes Do Not Affect Rept Conclusions
| author name = Kammerer C
| author name = Kammerer C
| author affiliation = NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
| author affiliation = NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
Line 12: Line 12:
| case reference number = FOIA-87-596
| case reference number = FOIA-87-596
| document report number = NUDOCS 8801150239
| document report number = NUDOCS 8801150239
| title reference date = 12-10-1986
| package number = ML20147B385
| package number = ML20147B385
| document type = CORRESPONDENCE-LETTERS, NRC TO U.S. CONGRESS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO U.S. CONGRESS, OUTGOING CORRESPONDENCE
Line 26: Line 27:
==Dear Mr. Chainnan:==
==Dear Mr. Chainnan:==


By letter dated December 10, 1986 Cha'un Zech forwarded a report by HRC's Office of Inspector and Auditor pJlA) entitled, Allegations of Misconduct lb Region IV with Respect to the Comanche Peak Steam El Etric Station. This letter Torwards correctTons to the chart on pages 34 and 35 of that report. There is no effect on the conclusions of the report.
By {{letter dated|date=December 10, 1986|text=letter dated December 10, 1986}} Cha'un Zech forwarded a report by HRC's Office of Inspector and Auditor pJlA) entitled, Allegations of Misconduct lb Region IV with Respect to the Comanche Peak Steam El Etric Station. This letter Torwards correctTons to the chart on pages 34 and 35 of that report. There is no effect on the conclusions of the report.
Sincerely, garlton Kamerer,            et Office of Congress    ffairs
Sincerely, garlton Kamerer,            et Office of Congress    ffairs



Latest revision as of 05:30, 12 December 2021

Forwards Corrections to Ofc of Inspector & Auditor Rept, Allegations of Misconduct by Region IV W/Respect to Comanche Peak Steam Electric Station, Forwarded by Chairman Zech .Changes Do Not Affect Rept Conclusions
ML20147B447
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/09/1987
From: Kammerer C
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Markey E
HOUSE OF REP., ENERGY & COMMERCE
Shared Package
ML20147B385 List:
References
FOIA-87-596 NUDOCS 8801150239
Download: ML20147B447 (3)


Text

,

a-Q P**%

/ k UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION s  !

wAssmorow, o, c. aoses

%*****. January 9, 1987 The Honorable Edward J. Markey, Chairman Subcomittee on Energy Conservation and Power Consnittee on Energy and Comerce United States House of Representatives Washington 0.C. 20515

Dear Mr. Chainnan:

By letter dated December 10, 1986 Cha'un Zech forwarded a report by HRC's Office of Inspector and Auditor pJlA) entitled, Allegations of Misconduct lb Region IV with Respect to the Comanche Peak Steam El Etric Station. This letter Torwards correctTons to the chart on pages 34 and 35 of that report. There is no effect on the conclusions of the report.

Sincerely, garlton Kamerer, et Office of Congress ffairs

Enclosure:

As stated cc: Rep. Carlos Moorhead 8801150239 880113 596 PDR a$MAh

}/

h

l 1

PAGES 34 4 35 l Inspection Resort 85 07/05 Concerns 1 and 2 Inconclusive I Inconclusive Reactor Vessel Installation Concern 3 :nconclusive Inconclusive Audit of Reactor Vessel Installation Concern 4 No Violation Spool Piece Marking Inconclusive Concern 5 2 Questionable No Problem in Cement Mixing Blades Handling of Handling of Violation Violation inspection Report 85-14/11 Concerns 1, 2 and 3 Questionable Re:ords Shipment to Stone Inconclusive on Tncern I ana z and Webster Questionable on Concern 3.

Concerns 4 and 5 Inconclusive Records Shipment of CB&l inconclusive, Concern 6 questionable Temporary Storage Ir. conclusive of Records Inspection Report 85-16/13 a Questionable Concerns 1,2(e)nd3 10 CFR 50.55 Inconclusive Concern 4 Questionable NAMCO Switches Not Properly Inconclusive Identified I

Concern 5 Refer to IE; Refer to IE; l BISCO Seals Inconclusive Inconclusive L

I Inconclusive - There was insufficient information to determine whether a violation was appropriate. l Questionable - There was sufficient information available to cite a violation.

o' EMWir Inconclusive or No Problem In tb violation Oaastionnable Handling Violation 7 9 o 14 , 1 1 4

_