UNITED STATES NUCLEAR REGULATORY COMMISSION a
i
-l WASHINGTON, D. C. 20555
\\*...*/
aus 2 e as Docket Nos.:
50-445 and 50-446 The Honorable Lloyd Bentsen i
United States Senator 961 Federal Building Austin, Texas 78701
Dear Senator Bentsen:
t This.is in response to your letter of July 15, 1985, to Mr. Carlton C. Kammerer, Director, Office of Congressional Affairs, requesting a status report on the Comanche Peak Nuclear Power Plant, and the letter of your constituents Mr. and Mrs. H. L. Bashaw who expressed concern about comments made in a newspaper article regarding the licensability of Comanche Peak.
As construction of the Comanche Peak Steam Electric Station (CPSES) Unit I was nearing completion, numerous concerns were raised on both design and construc-tion of the plant.
Primarily, these concerns were raised through 1) issues in contention before the NRC's Atomic Safety and Licensing Board (ASLB), 2) the staff's review of technical concerns and allegations regarding design and con-struction of the plant which are documented in Supplemental Safety Evaluation Reports, and 3) Cygna Energy Services who performed an Independent Assessment Program of design and construction at Comanche Peak.
Following identification of these concerns, the applicants prepared and sub-mitted to the NRC staff for review, portions of a program plan which applicants l
propose to implement for resolution of all existing or future issues raised by external sources (e.g. ASLB hearings, NRC, Cygna, etc.). The NRC staff has completed its initial review of the programatic aspects of the portions of the Comanche Peak Program Plan submitted to date and finds those portions of the plan to be comprehensive in scope and to provide a structure capable of I
addressing existing issues and future issues identified by external sources.
The plan also contains applicants' comitment to a set of self-initiated programs intended to demonstrate the adequacy of design and construction of the Comanche Peak Project. The staff's evaluation of the plan has identified certain programatic concerns which have been forwarded to the applicants and intervenor. The staff will also be providing coments on specific issues being addressed in the plan.
Following receipt of (1) plan modifications responsive to staff comments on both programmatic aspects and specific issues, (2) the remaining portions of the plan, and (3) coments from the intervenor, the staff will finalize its evaluation and findings in a Supplemental Safety Evaluation Report.
U PDR j
l I
The Honorable Lloyd Bentsen.
The ASLB hearings have been deferred at the request of both the applicants and the staff until the applicants can appropriately respond to the outstanding technical questions on construction and design. The applicants have filed their management plan for resolution of all issues in the ASLB hearings. The interve-nor and the staff have responded to the applicants' management plan. Hearings will resume on a schedule to be developed after the Board reaches a conclusion regarding the management plan and on the matters to be litigated in the hearing. The applicants' schedule indicates all plant modifications should be completed by the second quarter of 1986.
Construction of Comanche Peak Unit 2 is approximately 75% complete and the applicants expect to be completed by January 1987.
We trust that this status on the licensing of Comanche Peak will be helpful to I
you and your constituents.
Let us know should you need further information.
Sincerely, (tlptgWilliam1.O William J. Dircks Executive Director for Operations
- SEE PREVIOUS CONCURRENCES REVISEDPERA0/ED0(8/19/85)
CP/TRT/DL LB#1/DL CP/TRT/DL CP/TRT/DL D/DL
- AVietti-Cook /mac
- BJYoungblood
- CTrammell
- VSNoonan
- HThompson 08/12/85 08/12/85 0 /13/85 08/13/85 08/13/85
/['
/
DD/NRR D/NRR ED0 OC
- DEisenhut
- HDenton WDit 08/14/85 08/ 17/85 08p /85 8/g85
?
PRINCIPAL CORRESPONDENCE Green Ticket (ED0(Green) Ticket #000873 Docket File
- 50-445/50-446 NRC PDR*
Local PDR*
PRC System
- NSIC*
ED0 Control No. 000873 ED0 Reading File WDircks GCunningham DEisenhut/HDenton AVietti-Cook MRushbrook LB#1 Reading File HThompson/ Marie OELD TNovak/ Peggy CTramell VNoonan SECY(#85-632)
OCA LMulley,P-428(GreenTicket#000873) l.
ee, w
t e--'s
~~w
~
- ~~--~
r=----++w-~rs*~m-*~~-s"~~~w~~~m~--
- -' =
- =~+v-'--=--~~ew s*,- + -
~,me-
~e
's~
w=
>R RIG UNITED STATES
'[
g NUCLEAR REGULATORY COMMISSION L
j WASHINGTON, D. C. 20555 c
.....f
,1 Docket Nos.:
50-445
/
and 50-446
/
The Honorable Lloyd Bentsen j
United States Senato 961 Federal Building
/
Dear Senator Bentsen:
/
This is in response to yo\\
/
ur letter of July,15 1985, to Mr. Carlton C. Kammerer, Director, Office of Congres'sional Affairs,/ req,uesting a status report on the Comanche Peak Nuclear Power PJant, and the letter of your constituents Mr. and Mrs. H. L. Bashaw who expressAd concern about coments made in a newspaper article regarding the licensea6 ity of/ Comanche Peak.
As construction of the Comanche Peak Steam Electric Station (CPSES) Unit I was nearing completion, numerous concerns /were raised on both design and construc-tion of the plant.
Primarily, thesd concerns were raised through 1) issues in contentionbeforetheNRC'sAtomicp(af,etyandLicensingBoard(ASLB),2)the staff's review of technical concerrys and allegations regarding design and con-struction of the plant which are documented in Supplemental Safety Evaluation Reports, and 3) Cygna Energy Services whosperformed an Independent Assessment j
Program of design and constructipn at Comanche Peak.
\\
Following identification of thes/e concerns,'he applicants prepared and sub-t mitted to the NRC staff for review, a program' plan which includes resolution of all issues raised by external / sources (e.g. ASLB hearings, NRC, Cygna, etc.),
as well as a set of self-ini$1ated actions.
The NRC staff has completed its x
initial review of the programatic aspects of the\\ portions of the Comanche Peak Program Plan submitted to da'te and find those portions of the plan to be compre-hensive in scope and to provide a structure capablei f addressing all existing o
issues and any future issuns identified by external sources. The plan also contains applicants' comm/tment to a set of self-initiated programs intended to demonstrate the adequacy /of design and construction of'the Comanche Peak Project.
Thestaff'sevaluationoftheplanhasidentifiedcertainprogrammaticconcerns which have been forwarded to the applicants and intervenor. The staff will also be providing comments on specific issues being addressed in the plan.
Following receipt of (1) plan modifications responsive to staff comments on both programatic aspects and specific issues, (2) the remaining portions of the plan, and (3) comments from the intervenor, the staff will finalize its evalu-ation and findings in a Supplemental Safety Evaluation Report.
~
The Honorable Lloyd Bentsen The ASLB hearings have been deferred at the request of both the applicants and the staff until the applicants can appropriately respond to the outstanding technical questions on construction and design. The applicants have filed their management plan for resolution of all issues in the ASLB hearings. The interve-nor and the staff have responded to the applicants' management plan. Hearings will resume when the Board fonnally expresses its decision regarding the manage-ment plan and on the matters to be litigated in the hearing. The applicants' schedule indicates all plant modifications should be completed by the second quarter of 1986.
t Construction of Comanche Peak Unit 2 is approximately 75% complete and the applicants expect to be completed by January 1987.
We trust that this status on the licensing of Comanche Peak will be helpful to you and your constituents. Let us know should you need further information.
Sincerely, William J. Dircks Executive Director for Operations SEE PREVIOUS CONCORRENCES CP/TRT/DL LB#1/DL CP/TRT.'
l CP/TRT/(np/DL 7
- AVietti-Cook /mac
- BJYoungblood CTra
'1 VSNodn TNTh&npson 08/12/85 08/12/85
// g/85
//g/85 g' //J /85 DD/
D/N EDO D
t HDe y
WDircks
/
/85
(/p/85
/
/85
The Honorable Lloyd Bentsen The ASLB hearings have been deferred at the request of both the a icants and the staff until the applicants can appropriately respond to the utstanding technical questions on construction and design. The staff w be ready to re-sume hearings when the applicants have a program in place at will be able to provide the staff with reasonable assurance that CPSES designed and construc-ted adequately, and will be able to reach a licensing ecision following successful 4
implementation of this plan.
Construction of Comanche Peak Unit 2 is appro ately 75% complete and the applicants expect to be completed by Janua 1987.
We trust that this status on the lic ing of Comanche Peak will be helpful to you and your constituents. Let u now should you need further information.
Sincerely, 1
William J. Dircks Executive Director for Operations 4
d f,
T T/DL.
LB.1)
CP/TRT/DL CP/TRT/DL D/DL
, i W ook/mac BJM ggb ood CTrammell VSNoonan HThompson Q ILJ85 8 /y/85
/
/85
/
/85
/
/85 DD/NRR D/NRR EDO DEisenhut HDenton WDircks
/
/85
/
/85
/
/85 3
PRINCIPAL CORRESPONDENCE Green Ticket (EDO (Green) Ticket #000873 Docket File
- 50-445/50-446 NRC PDR*
Local PDR*
PRC System
- NSIC*
EDO Control No. 000873 EDO Reading File WDircks GCunningham DEisenhut/HDenton AVietti-Cook MRushbrook LB#1 Reading File HThompson/ Marie OELD TNovak/ Peggy CTrammell
~VNoonan SECY(#85-632)
OCA LMulley, P-428 (Green Ticket #000873) i i
i l
l
. m.
w
--a mal
F t
i-l ff
,'o,,
UNITED STATES g
NUCLEAR REGULATORY COMMISSION 3
- E WASHINGTON, D. C. 20555 5
/
EDO PRINCIPAL CORRESPONDENCE CONTROL
===- - -_
\\lo FROM:
DUE: 08/
85 EDO CONTROL: 000873 (l'
DOC DT: 07/15/85 U %
FINAL REPLY:
SEN. LLOYD BENTSEN
.TO:
KAMMERER FOR SIGNATURE OF:
GREEN SECY NO: 85-632 EXECUTIVE DIRECTOR DESC:
ROUTING:
64sh &W
)
ENCLOSES ARTICLE FROM H.
L.
B N RE COMANCHE DENTON PEAK AND REQUESTS AN UP-DATED STATUS REPORT ON GCUNNINGHAM COMANCHE PEAK DATE: 07/29/85 94 M ASSIGNED TO: 3ptt M Q CONTACT:.iRMikfis M N SPECIAL INSTRUCTIONS OR. REMARKS:
FiEPL.Y TO AUSTIN, TEXAS OFFICE NRR RECEIVED:
07/31/85 ACTION:
DL, H. THOMPSON WM ROUTING: DENTONfET5FNHUT "
PPAS
Sen Lloyd Bentsen CORRESPONDENCE CONTROL TICKET 7
SECY NUMBER:
85-632 LOGGING DATE 7/po/nc; ACTION OFFICE:
ED0-AUTHOR:
Sen Lloyd Bentsen --Const Ref AFFILIATION:
H.L. Bradshaw
.. LETTER DATE:
7/15/85 FILE CODE
-ADDRESSEE:
SUBJECT:
Encis news article re the lic of the Comanche Peak plant--req up-dated status rpt on Com Peak ACTION:
Direct Reply... Suspense: Aug 7 DISTRIBUTION: