ML20214A144: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20214A144
| number = ML20214A144
| issue date = 05/11/1987
| issue date = 05/11/1987
| title = Ack Receipt of 870423 Response to NRC 870327 Ltr Re Violations Noted in Insp Rept 50-348/86-29.Response Meets Requirements of 10CFR2.201.Addl Info Re Violation B Offered
| title = Ack Receipt of 870423 Response to NRC Re Violations Noted in Insp Rept 50-348/86-29.Response Meets Requirements of 10CFR2.201.Addl Info Re Violation B Offered
| author name = Grace J
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)

Latest revision as of 22:14, 4 May 2021

Ack Receipt of 870423 Response to NRC Re Violations Noted in Insp Rept 50-348/86-29.Response Meets Requirements of 10CFR2.201.Addl Info Re Violation B Offered
ML20214A144
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/11/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8705190291
Download: ML20214A144 (1)


See also: IR 05000348/1986029

Text

,

-

a

~

MAY 111987 M

jAlabama Power Company

J ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: REPORT NO. 50-348/86-29

Thank you for your response of April 23, 1987 to our Notice of Violation,

issued on March 27, 1987 concerning activities conducted at your Farley

facility. We have evaluated your response and found that it meets the require-

ments of 10 CFR 2.201. With regard to your contention on Violation B that

Action Statement b of Technical Specification 3.5.3 should have been cited

instead of Action Statement a, we offer this additional explanation. The major

portion of the piping system that was technically inoperable was common to

Action Statements a and b. Action Statement a is more restrictive than b,

therefore, it was cited in the violation. We will examine the implementation

of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely,

EIS;h!.'. C: Au .sa

i1503 C'.C3

J. Nelson Grace

Regional Administra tor

W. O. Whitt, Executive Vice President

cc:/J. D. Woodard, General Manager -

Nuclear Plant

/W.G.Hairston,III,GeneralManager-

Nuclear Support

/J.W.McGowan, Manager-SafetyAudit

j and Engineering Review

V J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

/

bcc: vNRC Resident Inspector

JE. Reeves, Project Manager, NRR

l Document Control Desk

State of Alabama

RII RII RII RII RII RII

L enos

tW O

HD ce

MD

DVerrelli

h

VBrownlee

5 h

LReyes

4

Ernst

/ 7 5 ./87 5/4-/87 5/3 /87 s , 5/ 3- /8 5/6/87

q

8705190291 870511

PDR ADOCK 05000348 C8#l

G PDR /