ML20214A144
| ML20214A144 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/11/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| References | |
| NUDOCS 8705190291 | |
| Download: ML20214A144 (1) | |
See also: IR 05000348/1986029
Text
,
-
a
MAY 111987
M
~
jAlabama Power Company
J ATTN:
Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT:
REPORT NO. 50-348/86-29
Thank you for your response of April 23, 1987 to our Notice of Violation,
issued on March 27, 1987 concerning activities conducted at your Farley
facility. We have evaluated your response and found that it meets the require-
ments of 10 CFR 2.201.
With regard to your contention on Violation B that
Action Statement b of Technical Specification 3.5.3 should have been cited
instead of Action Statement a, we offer this additional explanation.
The major
portion of the piping system that was technically inoperable was common to
Action Statements a and b.
Action Statement a is more restrictive than b,
therefore, it was cited in the violation. We will examine the implementation
of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely,
EIS;h!.'. C: Au .sa
i1503 C'.C3
J. Nelson Grace
Regional Administra tor
W. O. Whitt, Executive Vice President
cc:/J. D. Woodard, General Manager -
Nuclear Plant
/W.G.Hairston,III,GeneralManager-
Nuclear Support
/J.W.McGowan, Manager-SafetyAudit
j and Engineering Review
V J. K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
/
bcc: vNRC Resident Inspector
JE. Reeves, Project Manager, NRR
Document Control Desk
l
State of Alabama
tW O
h
5 h
RII
RII
RII
RII
RII
RII
4
L
enos
HD ce
DVerrelli
VBrownlee
LReyes
Ernst
, 5/ - /8
5/6/87
/
7
5
./87
5/4-/87
5/3 /87 s
3
q
8705190291 870511
ADOCK 05000348
G
C8#l
/