ML20066D847: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
OPERATLNG DATA REPORT DOCKET NO. 50-335
                                                                  ~                                            DATE APR 15. itut?
COMPLETED BY P. Pace TELEPHONE (~tn61 687 3654 OPERATING STATUS Notes
: 1. Unit Name:
St. Lucie 1 March 1982                                      St. Lucie Unit 1' operated
: 2. Reporting Period:
2700                              at essentially full powe'r
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):        850*                              for the eritire mon'th f                5. Design Electrical Rating (Net MWe): 802*
822*
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):
777*              b
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
          -
* Items 4.5.6.7 arn in the process of beina revised due to increased licensed thermal power None                                                          e
: 9. Power LevelTo which Restricted,If Any (Net MWe):
: 10. Reasons For Restrictions,If Any:                        N/A This Month            Yr to.Date          Cumulative 744                  2160            46 248
: 11. Hours In Reporting Period                                                                      36 989.4 744                  2160
: 12. Number OfIlours Reactor Was Critical                                                0              205.3 0
: 13. Reactor Reserve Shutdown flours                                                2160            36 154.9 744
: 14. Ilours Generator On-Line                                                                              39_3 0                      0
: 15. Unit Reserve Shutdown Hours                                                                  89 046 033 5 722 114                                  -
: 16. Gross Thermal Energy Ge'erated n      (MWH)          1 984 448 649 040            1 874 410          28 932 525
: 17. Gross Electrical Energy Generated (MWH) l                                                                          615 472            1 776 412          27_2_57 959
: 18. Net Electrical Energy Generated (MWH)                            _
                                                                                                        .100.0              78.2
    ,                                                                          100.0 78.3
: 19. Unit Service Factor                                      100.0                    100.0
: 20. Unit Availability Factor                                                                            775.9
                                                                -              106.5                    106.0
: 21. Unit Capacity Factor (Using MDC Net)                                                                  73.5
(                                                                              103.2                    102.7
: 22. Unit Capacity Factor (Using DER Net)                                                  0              5.3 0
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):
l                                                                                                      i                                  -
i                Steam Generator Inspection.May 1982. 2 weeks
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast            Achieved l                26. Units In Test Status (Prior to Commercial Operation):                                                                    ,
INITIAL CRITICALITY
                                                                                                            ~$
INITIAL ELECTRICITY COMMERCIA L OPERATION 0211120273 820415                                                                                                  N/77)
PDR ADOCK 05000335
;          R                        PDR I
c., - n      0
 
e UNIT SilUTDOWNS A.'JD POWER REDUCTIONS                    DOCKET NO. 50-335                    ,
UNIT NAME St- lucie 1 DATE      APR f e noo REPORT MONTil  llarch 1982                    COMPl.ETED BY      D. D e ,-o - ~~'
TELEPflONE I100 50-3654                4 1
i
:,    j?      "b        Yh        Licensee    3 r.,      b*).,                Cause & Corrective No.          DJte i      5@        i    .5 s 5        Event          7      S3                        Action to
                                  $E        $    jgg          Report        55 0        '
Prevent Recurrence
                                      .                d No shutdowns or power reductions greater than 20% of average daily power level, r4 1
2 3                                4 F: Forced
* Reason:                                            Method:                          Exhibit G - Instructions S: Sched,uled        A Equipment Failure (Explain)                      1 Manual B-Maintenance of Test                                                                for Preparation of Data j/                                                                  2 Manual Scram.                  Entry Sheets for Licensee C Refueling 3 Automatic Seram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                          9 OthcV (Explain)
E-Operator Training & License Examination                                            0161)
F Administrative                                  Y "" O * "* " ""              5 G Operational Error (Explain)                      4- _ Aoao ase ve. ,. .d
('l/77)                  Il Other (Esplain)                                                                    Eshibit 1 - Same Source
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.          50-335 UNITSt. Lucie 1 DATE APR 151982 COMPLETED BY ~ P. Pace TELEPilONE        (305) 552-3654' s
MONDI          March 1982                  -
DAY      AVER ACE DAILY POWER LEVEL                          DAY      AVER AGE DAILY POWER LEVEL IM We-Net)                                                -(MWe-Net) 1                    817                                    17                    829                                        -
2                    816                                    is                    827 3
828                                                                                                    .. -
19                    82_9 4                    827                                    20                    828                              ..
5                    825                                    23 830 6                    825                                                          831 22 824                                                                                i
      .7                    ...                                  23                    831 8                    8"28                                  24                      830 9                                                          25                      829 10                    831                                  26                      828
::                    830                                  y,                      828 12 831                                                          829 28 13                    829                                  ,
9 827 s
34                    830                                  39                      829 15                    830                                                          829 33 829 16 i                                        .
INSTRUCTIONS On this format.hst the aver. ige daily unit power leselin MWe Net for each day in the reporting :n.inth. Compute to the nearest whole rmgawart.
(9/771
                                                                                                        'h  ,
e  -                    O  .,
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.              50-335 UNIT      St. Lucie Unit No. 1 DATE      APR 151982 COMPLETED BY        P. L~. Pace TELEPHONE      (305) 552-3654 REPORT MONTH        March, 1982
              ~
Unit 1 operated at essentially full power for the entire month.
Major Safety-related maintenance activities performed during the mcnth included:
Inspections and requirements of IE Bulletins and NUREG-0737 in progress.
Florida iower & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
l i
l l
I
                                  .-      ~  .                            ,r-,_,.- . .,__. . + . . _ . __.__ -_ _ _ _ _}}

Latest revision as of 16:02, 21 December 2020

Monthly Operating Rept for Mar 1982
ML20066D847
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/15/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20066D846 List:
References
NUDOCS 8211120273
Download: ML20066D847 (4)


Text

.

OPERATLNG DATA REPORT DOCKET NO. 50-335

~ DATE APR 15. itut?

COMPLETED BY P. Pace TELEPHONE (~tn61 687 3654 OPERATING STATUS Notes

1. Unit Name:

St. Lucie 1 March 1982 St. Lucie Unit 1' operated

2. Reporting Period:

2700 at essentially full powe'r

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 850* for the eritire mon'th f 5. Design Electrical Rating (Net MWe): 802*

822*

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

777* b

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

-

  • Items 4.5.6.7 arn in the process of beina revised due to increased licensed thermal power None e
9. Power LevelTo which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any: N/A This Month Yr to.Date Cumulative 744 2160 46 248
11. Hours In Reporting Period 36 989.4 744 2160
12. Number OfIlours Reactor Was Critical 0 205.3 0
13. Reactor Reserve Shutdown flours 2160 36 154.9 744
14. Ilours Generator On-Line 39_3 0 0
15. Unit Reserve Shutdown Hours 89 046 033 5 722 114 -
16. Gross Thermal Energy Ge'erated n (MWH) 1 984 448 649 040 1 874 410 28 932 525
17. Gross Electrical Energy Generated (MWH) l 615 472 1 776 412 27_2_57 959
18. Net Electrical Energy Generated (MWH) _

.100.0 78.2

, 100.0 78.3

19. Unit Service Factor 100.0 100.0
20. Unit Availability Factor 775.9

- 106.5 106.0

21. Unit Capacity Factor (Using MDC Net) 73.5

( 103.2 102.7

22. Unit Capacity Factor (Using DER Net) 0 5.3 0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):

l i -

i Steam Generator Inspection.May 1982. 2 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achieved l 26. Units In Test Status (Prior to Commercial Operation): ,

INITIAL CRITICALITY

~$

INITIAL ELECTRICITY COMMERCIA L OPERATION 0211120273 820415 N/77)

PDR ADOCK 05000335

R PDR I

c., - n 0

e UNIT SilUTDOWNS A.'JD POWER REDUCTIONS DOCKET NO. 50-335 ,

UNIT NAME St- lucie 1 DATE APR f e noo REPORT MONTil llarch 1982 COMPl.ETED BY D. D e ,-o - ~~'

TELEPflONE I100 50-3654 4 1

i

, j? "b Yh Licensee 3 r., b*)., Cause & Corrective No. DJte i 5@ i .5 s 5 Event 7 S3 Action to

$E $ jgg Report 55 0 '

Prevent Recurrence

. d No shutdowns or power reductions greater than 20% of average daily power level, r4 1

2 3 4 F: Forced

  • Reason: Method: Exhibit G - Instructions S: Sched,uled A Equipment Failure (Explain) 1 Manual B-Maintenance of Test for Preparation of Data j/ 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Seram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9 OthcV (Explain)

E-Operator Training & License Examination 0161)

F Administrative Y "" O * "* " "" 5 G Operational Error (Explain) 4- _ Aoao ase ve. ,. .d

('l/77) Il Other (Esplain) Eshibit 1 - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNITSt. Lucie 1 DATE APR 151982 COMPLETED BY ~ P. Pace TELEPilONE (305) 552-3654' s

MONDI March 1982 -

DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IM We-Net) -(MWe-Net) 1 817 17 829 -

2 816 is 827 3

828 .. -

19 82_9 4 827 20 828 ..

5 825 23 830 6 825 831 22 824 i

.7 ... 23 831 8 8"28 24 830 9 25 829 10 831 26 828

830 y, 828 12 831 829 28 13 829 ,

9 827 s

34 830 39 829 15 830 829 33 829 16 i .

INSTRUCTIONS On this format.hst the aver. ige daily unit power leselin MWe Net for each day in the reporting :n.inth. Compute to the nearest whole rmgawart.

(9/771

'h ,

e - O .,

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie Unit No. 1 DATE APR 151982 COMPLETED BY P. L~. Pace TELEPHONE (305) 552-3654 REPORT MONTH March, 1982

~

Unit 1 operated at essentially full power for the entire month.

Major Safety-related maintenance activities performed during the mcnth included:

Inspections and requirements of IE Bulletins and NUREG-0737 in progress.

Florida iower & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

l i

l l

I

.- ~ . ,r-,_,.- . .,__. . + . . _ . __.__ -_ _ _ _ _