Monthly Operating Rept for Mar 1982
ML20066D847
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/15/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20066D846 List:
References
NUDOCS 8211120273
Download: ML20066D847 (4)


Text

.

OPERATLNG DATA REPORT 50-335 DOCKET NO.

DATE APR 15. itut?

~

COMPLETED BY P. Pace TELEPHONE (~tn61 687 3654 OPERATING STATUS Notes St. Lucie 1

1. Unit Name:

March 1982 St. Lucie Unit 1' operated

2. Reporting Period:

at essentially full powe'r 2700

3. Licensed Thermal Power (MWt):

850*

for the eritire mon'th f

4. Nameplate Rating (Gross MWe):

802*

5. Design Electrical Rating (Net MWe):

822*

6. Maximum Dependable Capacity (Gross MWe):

777*

b

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
  • Items 4.5.6.7 arn in the process of beina revised due to increased licensed thermal power None e
9. Power LevelTo which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cumulative 744 2160 46 248

11. Hours In Reporting Period 744 2160 36 989.4
12. Number OfIlours Reactor Was Critical 0

0 205.3

13. Reactor Reserve Shutdown flours 744 2160 36 154.9
14. Ilours Generator On-Line 0

0 39_3

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Ge'erated (MWH) 1 984 448 5 722 114 89 046 033 n

649 040 1 874 410 28 932 525 l

17. Gross Electrical Energy Generated (MWH) 615 472 1 776 412 27_2_57 959
18. Net Electrical Energy Generated (MWH)

.100.0 78.2 100.0

19. Unit Service Factor 100.0 100.0 78.3
20. Unit Availability Factor 106.5 106.0 775.9

(

21. Unit Capacity Factor (Using MDC Net) 103.2 102.7 73.5
22. Unit Capacity Factor (Using DER Net) 0 0

5.3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):

l i

i Steam Generator Inspection.May 1982. 2 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achieved l

26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY

~$

INITIAL ELECTRICITY COMMERCIA L OPERATION 0211120273 820415 N/77)

PDR ADOCK 05000335 R

PDR I

c., - n 0

e UNIT SilUTDOWNS A.'JD POWER REDUCTIONS DOCKET NO. 50-335 UNIT NAME St-lucie 1 DATE APR f e noo llarch 1982 COMPl.ETED BY D.

D e,-o - ~~'

REPORT MONTil TELEPflONE I100 50-3654 4

1 i

j?

"b Yh Licensee 3 r.,

b*).,

Cause & Corrective No.

DJte i

5@

i

.5 s 5 Event 7

S3 Action to

$E jgg Report 55 0 Prevent Recurrence d

No shutdowns or power reductions greater than 20% of average daily power level, r4 1

2 3

4 F: Forced

  • Reason:

Method:

Exhibit G - Instructions S: Sched,uled A Equipment Failure (Explain) 1 Manual for Preparation of Data j/

B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Seram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 9 OthcV (Explain) 0161)

E-Operator Training & License Examination F Administrative Y "" O * "* " ""

5 G Operational Error (Explain) 4- _ Aoao ase ve.,..d Eshibit 1 - Same Source

('l/77)

Il Other (Esplain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-335 UNITSt. Lucie 1 DATE APR 151982 COMPLETED BY ~ P. Pace (305) 552-3654' TELEPilONE s

MONDI March 1982 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IM We-Net)

-(MWe-Net) 1 817 17 829 2

816 827 is 828 3

19 82_9 827 828 4

20 825 830 5

23 825 6

22 831 824

.7 23 831 i

8"28 830 8

24 9

25 829 828 10 831 26 830 828 y,

831 829 12 28 13 829 827 9

s 830 829 34 39 830 829 15 33 829 16 i

INSTRUCTIONS On this format.hst the aver. ige daily unit power leselin MWe Net for each day in the reporting :n.inth. Compute to the nearest whole rmgawart.

(9/771

'h e

O

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-335 UNIT St. Lucie Unit No. 1 DATE APR 151982 COMPLETED BY P.

L~. Pace TELEPHONE (305) 552-3654 REPORT MONTH March, 1982

~

Unit 1 operated at essentially full power for the entire month.

Major Safety-related maintenance activities performed during the mcnth included:

Inspections and requirements of IE Bulletins and NUREG-0737 in progress.

Florida iower & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.