OPERATLNG DATA REPORT 50-335 DOCKET NO.
DATE APR 15. itut?
~
COMPLETED BY P. Pace TELEPHONE (~tn61 687 3654 OPERATING STATUS Notes St. Lucie 1
- 1. Unit Name:
March 1982 St. Lucie Unit 1' operated
- 2. Reporting Period:
at essentially full powe'r 2700
- 3. Licensed Thermal Power (MWt):
850*
for the eritire mon'th f
- 4. Nameplate Rating (Gross MWe):
802*
- 5. Design Electrical Rating (Net MWe):
822*
- 6. Maximum Dependable Capacity (Gross MWe):
777*
b
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- Items 4.5.6.7 arn in the process of beina revised due to increased licensed thermal power None e
- 9. Power LevelTo which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
This Month Yr to.Date Cumulative 744 2160 46 248
- 11. Hours In Reporting Period 744 2160 36 989.4
- 12. Number OfIlours Reactor Was Critical 0
0 205.3
- 13. Reactor Reserve Shutdown flours 744 2160 36 154.9
- 14. Ilours Generator On-Line 0
0 39_3
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Ge'erated (MWH) 1 984 448 5 722 114 89 046 033 n
649 040 1 874 410 28 932 525 l
- 17. Gross Electrical Energy Generated (MWH) 615 472 1 776 412 27_2_57 959
- 18. Net Electrical Energy Generated (MWH)
.100.0 78.2 100.0
- 19. Unit Service Factor 100.0 100.0 78.3
- 20. Unit Availability Factor 106.5 106.0 775.9
(
- 21. Unit Capacity Factor (Using MDC Net) 103.2 102.7 73.5
- 22. Unit Capacity Factor (Using DER Net) 0 0
5.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):
l i
i Steam Generator Inspection.May 1982. 2 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast Achieved l
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY
~$
INITIAL ELECTRICITY COMMERCIA L OPERATION 0211120273 820415 N/77)
PDR ADOCK 05000335 R
PDR I
c., - n 0
e UNIT SilUTDOWNS A.'JD POWER REDUCTIONS DOCKET NO. 50-335 UNIT NAME St-lucie 1 DATE APR f e noo llarch 1982 COMPl.ETED BY D.
D e,-o - ~~'
REPORT MONTil TELEPflONE I100 50-3654 4
1 i
j?
"b Yh Licensee 3 r.,
b*).,
Cause & Corrective No.
DJte i
5@
i
.5 s 5 Event 7
S3 Action to
$E jgg Report 55 0 Prevent Recurrence d
No shutdowns or power reductions greater than 20% of average daily power level, r4 1
2 3
4 F: Forced
- Reason:
Method:
Exhibit G - Instructions S: Sched,uled A Equipment Failure (Explain) 1 Manual for Preparation of Data j/
B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Seram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 9 OthcV (Explain) 0161)
E-Operator Training & License Examination F Administrative Y "" O * "* " ""
5 G Operational Error (Explain) 4- _ Aoao ase ve.,..d Eshibit 1 - Same Source
('l/77)
Il Other (Esplain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-335 UNITSt. Lucie 1 DATE APR 151982 COMPLETED BY ~ P. Pace (305) 552-3654' TELEPilONE s
MONDI March 1982 DAY AVER ACE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IM We-Net)
-(MWe-Net) 1 817 17 829 2
816 827 is 828 3
19 82_9 827 828 4
20 825 830 5
23 825 6
22 831 824
.7 23 831 i
8"28 830 8
24 9
25 829 828 10 831 26 830 828 y,
831 829 12 28 13 829 827 9
s 830 829 34 39 830 829 15 33 829 16 i
INSTRUCTIONS On this format.hst the aver. ige daily unit power leselin MWe Net for each day in the reporting :n.inth. Compute to the nearest whole rmgawart.
(9/771
'h e
O
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-335 UNIT St. Lucie Unit No. 1 DATE APR 151982 COMPLETED BY P.
L~. Pace TELEPHONE (305) 552-3654 REPORT MONTH March, 1982
~
Unit 1 operated at essentially full power for the entire month.
Major Safety-related maintenance activities performed during the mcnth included:
Inspections and requirements of IE Bulletins and NUREG-0737 in progress.
Florida iower & Light Company commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.