ML20125B251: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[IR 05000369/1978020]]
{{Adams
| number = ML20125B251
| issue date = 08/07/1979
| title = Forwards IE Insp Repts 50-369/78-20 & 50-370/78-15 on 780411-13,0503-05,0706-28,0910-11,1108 & 1205-06.No Noncompliance Noted
| author name = Long F
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Parker W
| addressee affiliation = DUKE POWER CO.
| docket = 05000369, 05000370
| license number =
| contact person =
| document report number = NUDOCS 7910250538
| package number = ML20125B242
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000370/1978015]]
 
=Text=
{{#Wiki_filter:.
                                                      UNITED STATES
        /p1 Rig        'o                                                                                                  -
  *                    Tgr,              NUCLEAR REGULATORY COMMISSION              '
      f'    , y. ,                                      REGION 11
  ?h  o
                      '
                          E
                          [
                                              101 MARIETT A sT., N.W.,sulTE 3100I
                                                  ATLANT A, G EoRGI A 30303          ,
                                                                                  ,.
        % *wse* /
      In Reply Refer To:                                                    ["
      "II:CEA
                                                                                                            ,
      50-369/78-20
      50-370/78-15
            Duke Power Company
            ATTN:        W. O. Parker, Jr.
                          Vice President, Steam Production
            P. O. Box 2178
            Charlotte, N C 28242
,          Gentlemen:
            This refers to the investigation conducted by M. V. Annast of this office during
            April 11 - December 6, 1978, of activitiesThe                          authorized      by investiga-
                                                                                        results of this  NRC Constructio
            Nos. CPPR-83 and CPPR-84 for the McGuire                    f acility.to you on August 1, 1979 by the
            tion were discussed in correspondence sent                                                                        j
            Director, Division of Reactor Construction Inspection, Office of Inspection a]
            Enforcement.
                                                                                                          Part 2,
              In accordance with Section 2.790 of the NRC's " Rules of Practice",
              Title 10, Code of Federal Regulations, a copy of this letter and                              If the
                                                                                                              this enclosed
              investigation
              report
                                        report will be placed in the NRC's Public Docum                                        {
              proprietary, it is necessary that you make a written application                            Any suchwithin 20
              to this office to withhold such information from public disclosure.                                h
              application must include a full statement of the reasons on the basis of w                                      ,
              it is claimed that the information is proprietary, and should be prepared so                                    j
              that proprietary informationIf identified                  in  the      application
                                                        we do not hear from you in this regard within is contained  in a      i
              separate part of the document.the specified period, the report will be plac
                Should you have any questions concerning this letter, we will be glad to discu
                them with you.
                                                                  Sincerely,
          P00RORGNAL                                        NIV    Acting Deputy Director
                Enclosure:
                  Investigation Report Nos.
                    50-369/78-20 and 50-370/78-15
                  cc w/ enc 1:  (See Page 2)
                                                                                            7 9102,5 0 b
                                                                                -
                                                                                                                          *
                                                                                                                            . >
 
_      .      . . . _ _ . .          ._ _. . _ -._                  . _ .          _ ._
                                                                -      ..    .
        -                ---
  .
  ,
                                                                                                  .,
                                                                                                "
                                                                                -2-                AUG 0 71979
  '
        Duke Power Company
  ,
                                                                                              :
        cc w/ enc 1:
        M. D. McIntosh, Plant Manager
        P. O. Box 488'
        Cornelius, N C 28031
          J. C. Rogers, Project Manager
          P. O. Box 33189
          Charlotte, N C 28242
                                                                                                                              l
                                                                                                                              1
                                                                                            .
                                                                                                                                !
                                                                                                                              .
                                                                                                                              l
    .
                              . , . -              - - - . - , . . .      ,      _ _                '    '-*'t gg .% 9
                                                                                                                            ,_
}}

Revision as of 02:36, 24 July 2020

Forwards IE Insp Repts 50-369/78-20 & 50-370/78-15 on 780411-13,0503-05,0706-28,0910-11,1108 & 1205-06.No Noncompliance Noted
ML20125B251
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 08/07/1979
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20125B242 List:
References
NUDOCS 7910250538
Download: ML20125B251 (2)


See also: IR 05000370/1978015

Text

.

UNITED STATES

/p1 Rig 'o -

  • Tgr, NUCLEAR REGULATORY COMMISSION '

f' , y. , REGION 11

?h o

'

E

[

101 MARIETT A sT., N.W.,sulTE 3100I

ATLANT A, G EoRGI A 30303 ,

,.

% *wse* /

In Reply Refer To: ["

"II:CEA

,

50-369/78-20

50-370/78-15

Duke Power Company

ATTN: W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, N C 28242

, Gentlemen:

This refers to the investigation conducted by M. V. Annast of this office during

April 11 - December 6, 1978, of activitiesThe authorized by investiga-

results of this NRC Constructio

Nos. CPPR-83 and CPPR-84 for the McGuire f acility.to you on August 1, 1979 by the

tion were discussed in correspondence sent j

Director, Division of Reactor Construction Inspection, Office of Inspection a]

Enforcement.

Part 2,

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Title 10, Code of Federal Regulations, a copy of this letter and If the

this enclosed

investigation

report

report will be placed in the NRC's Public Docum {

proprietary, it is necessary that you make a written application Any suchwithin 20

to this office to withhold such information from public disclosure. h

application must include a full statement of the reasons on the basis of w ,

it is claimed that the information is proprietary, and should be prepared so j

that proprietary informationIf identified in the application

we do not hear from you in this regard within is contained in a i

separate part of the document.the specified period, the report will be plac

Should you have any questions concerning this letter, we will be glad to discu

them with you.

Sincerely,

P00RORGNAL NIV Acting Deputy Director

Enclosure:

Investigation Report Nos.

50-369/78-20 and 50-370/78-15

cc w/ enc 1: (See Page 2)

7 9102,5 0 b

-

. >

_ . . . . _ _ . . ._ _. . _ -._ . _ . _ ._

- .. .

- ---

.

,

.,

"

-2- AUG 0 71979

'

Duke Power Company

,

cc w/ enc 1:

M. D. McIntosh, Plant Manager

P. O. Box 488'

Cornelius, N C 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, N C 28242

l

1

.

!

.

l

.

. , . - - - - . - , . . . , _ _ ' '-*'t gg .% 9

,_