Forwards SE of Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves
ML20206N345
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/11/1999
From: Rinaldi F
NRC (Affiliation Not Assigned)
To: Barron H
DUKE POWER CO.
Shared Package
ML20206N348 List:
References
GL-96-05, GL-96-5, TAC-M97065, TAC-M97066, NUDOCS 9905170203
Download: ML20206N345 (4)


Text

i

~

nou g"

4 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20565-0001 og...../

May 11,1999 Mr. H. B Barron Vice President, McGuire Site Duke Energy Corporation 12700 Hagers Ferry Road Huntersville, NC 28078-8985 1

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 RE: SAFETY EVALUATION OF LICENSEE'S RESPONSE TO GENERIC LETTER 96-05 (TAC NOS.

M97065 AND M97066)

Dear Mr. Barron:

i On September 18,1996, the NRC issued Generic Letter (GL) 96-05, " Periodic Verification of i

Design Basis Capability of Safety-Related Motor-Operated Valves," requesting each nuclear power plant licensee to establish a program, or to ensure the effectiveness of its current program, to verify on a periodic basis that safety-related motor operaiud valves (MOVs)

{

continue to be capable of performing their safety functions within the current licensing bases of the facility. On November 14,1996, you submitted a 60-day response to GL 96-05 notifying the l

NRC that you would implement the requested MOV periodic verification program at the McGuire i

Nuclear Station, Units 1 and 2. Also, on March 17,1997, you submitted a 180-day response to GL 96-05 providing a summary description of the MOV periodic verification program planned for implementation at McGuire. In a submittal dated March 31,1998, you updated your commitment to GL 96-05. Further, on March 19,1999, you provided a response to an NRC i

request for additional infcrmation regarding GL 96-05 dated January 28,1999.

The NRC staff has reviewed your submittals and applicable NRC inspection reports and finds your commitment to implement the Joint Owners Group (JOG) Program on MOV Periodic i

Verification tc include all three phases of that program. You should notify the NRC if your commitment does not include all three JOG program phases. Based on this understanding of your commitment with respect to GL 96-05, the NRC staff finds that you have established an acceptable program to verify periodically the design-basis capability of the safety-related MOVs at McGuire Nuclear Station, Units 1 and 2. Therefore, the NRC staff concludes that you have adequately addressed the actions requested in GL 96-05. The NRC staff may conduct inspections at the McGuire site to verify that the implementation of the MOV periodic verification program is in accordance with your commitments; this NRC safety evaluation; the NRC safety evaluation dated October 30,1997, on the JOG Program on MOV Periodic Verification; and the NRC safety evaluation dated April 14,1998, on the Westinghouse Owners Group methodology for ranking MOVs by their safety significance.

yfd 1

9905170203 990511 PDR ADOCK 05000369 P

PDR

.y p

v H. B. Barron Ma) 11,1999 This completes our work on TAC Nos. M97065 and M97066. If you have any questions, please contact me at (301) 415-1447.

Sincerely, Original signed by:

Frank Rinaldi, Project Manager, Section 1 Project Directorate II Division of Licensing and Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

Safety Evaluation.

cc w/ encl: See next page i

l l

plSTRIBUTION:

(Docket File O OGC PUBLIC ACRS PDil-2 R/F TScarbrough DTerao LPlisco,Ril COgle,Rll JZwolinski/SBlack DOCUMENT NAME: G:\\MCGUIRE\\M97065.WPD To receive copy of document, Indicate in the box: "C"= Copy w/enci "E"= Copy w/o enci "N"=No copy OFFICE PM:PDil-2,

E LA:PD:ll-2 N SC:PDll-2 g lg l

l

)

NAME-FRina'di: M[/

CHawes /nly)d REmeli "i

]

DATE f/ 7 /99 (

5 /& /99

(/ s /99 i

OFFICIAL RECORD COPY j

y-i

- H. B. Barron :

This completes our work on TAC Nos. M97065 and M97066. If you have any questions, please contact me at (301) 415-1447.

Sincere!y, l

m f

j %&f l

Frank Rinaldi, Project Manager, Section 1 Project Directorate ll Division of Ucensing and Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370

Enclosure:

Safety Evaluation

. cc w/ encl: See next page

s McGuire Nuclear Station cc:

Ms. Lisa F. Vaughn Ms. Karen E. Long Legal Department (PBOSE)

Assistant Attorney General Duke Energy Corporation -

North Carolina Department of 422 South Church Street Justice Charlotte, North Carolina 28201-1006 -

P. O. Box 629 Raleigh, North Carolina 27602 County Manager of Mecidenburg County L. A. Keller 720 East Fourth Street Manager-Nuclear Regulatory

' Charlotte, North Carolina 28202 Licensing Duke Energy Corporation

' Michael T. Cash 526 South Church Street Regulatory Compliance Manager Charlotte, Nor1h Carolina 28201-1006 Duke Energy Corporation McGuire Nuclear Site ~

Elaine Wathen, Lead REP Planner 12700 Hagers Ferry Road DMsion of Emergercy Management Huntersvile, North Carolina 28078 116 West Jones Street Raleigh, North Carolina 27603-1335 J. Michael McGarry,Ill, Esquire Winston and Strawn Mr. Richard M. Fry, Director 1400 L Street, NW.

DMsion of Radiation Protection Washington, DC 20005 North Carolina Depariment of Environment, Health and Natural Senior Residentinspector Resources c/o U.S. Nuclear Regulatory Commission 3825 Barrett Drive 12700 Hagers Feny Road Raleigh, North Carola 27609-7721 HuntersvlNe, North Carolina 28078 Mr. T. Richard Puryear Dr. John M. Barry Owners Group (NCEMC)

Mecklenberg County Duke Energy Corporation Departmentof Environmental 4800 Concord Road

' Protection -

York, South Carolina 29745 700 N. Tryon Street Chariotte, North Carouna 28202 Mr. Steven P. Shaver Senior Sales. Engineer

~ Westinshouse Electric Company 5929 Carnegie Blvd.

Sulte 500 Charlotte, North Carolina 28209