ML20070Q704: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20070Q704
| number = ML20070Q704
| issue date = 01/13/1983
| issue date = 01/13/1983
| title = Forwards Evaluation of Point Beach Nuclear Plant,1982.
| title = Forwards Evaluation of Point Beach Nuclear Plant,1982
| author name = Fay C
| author name = Fay C
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| author affiliation = WISCONSIN ELECTRIC POWER CO.

Latest revision as of 21:19, 23 May 2020

Forwards Evaluation of Point Beach Nuclear Plant,1982
ML20070Q704
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/13/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20070Q709 List:
References
NUDOCS 8301270148
Download: ML20070Q704 (1)


Text

.

b. W, $f

+

Q Nscomun Sectnc mencwmr 231 W. MICHIGAN, P.O. 301 2046, MILWAUKEE WI 53201 January 13, 1983 Mr. J. G. Keppler, Regional Administrator Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATOFY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

INPO EVALUATION POINT BEACH NUCLEAR PLANT For your information I am enclosing a copy of the INPO Evaluation Report of the Point Beach Nuclear Plant. The evaluation was performed in August 1982 and the final report has just been received.

1 l Distribution will be made to the Public Service Commission

! of Wisconsin. With our approval, INPO will also distribute the l report in accordance with their Evaluation Release Policy.

Very truly yours, hU W, b

Vice President-Nuclear Power I

C. W. Fay Encl'osure h Copy to NRC Resident Inspector l

l l

l DR DR jj',Q17 b l R