ML18019A283: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 48: Line 48:
r              >)                  .4 I  .j '      g  f        ) Wll      fr f.                        4)WW                                                        1 c'.  [    4 ll ')      i,rlI,tl                          >>ftf'1>>          I  ll    'f      "f>>f'4'          f'          t~ yflw,                          [f l      f
r              >)                  .4 I  .j '      g  f        ) Wll      fr f.                        4)WW                                                        1 c'.  [    4 ll ')      i,rlI,tl                          >>ftf'1>>          I  ll    'f      "f>>f'4'          f'          t~ yflw,                          [f l      f
                                                                                                                                                                                 ~
                                                                                                                                                                                 ~
[[I
((I
       >ff f')J                      f    4144fc        f                                                                                    4['ff 44[
       >ff f')J                      f    4144fc        f                                                                                    4['ff 44[
             .rl 1
             .rl 1

Latest revision as of 01:43, 18 March 2020

Forwards Rev 4 to Emergency Plan.Changes Reflect Lessons Learned from Table Top Drills Conducted in Preparation for 850517-18 Emergency Exercise & Make Emergency Plan Consistent W/Plant Emergency Procedures
ML18019A283
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/08/1985
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019A284 List:
References
NLS-85-235, NUDOCS 8507250230
Download: ML18019A283 (8)


Text

REGULAT 'FORMATION DISTRIBUTION 'EM (RIDS)

ACCESSION NBR 8507250230 DOC ~ DATE 85/07/08 NOTARIZED NO Shear on Har ris Nucl ear Power Pl ant~ Vni t 1< Carol ina DOCKET'ACII.:50-000 05000400'UTH

~ NAME AUTHOR AFFILIATION NATSONgRqA ~ Carolina Power 5 Light Co, RECIP ~ NAME> RECIPIENT AFFIL'IATION DENTONgH,RE Office of Nuclear Reactor" Regulationq Director Rtd'M' SUBJECT; Forwards Rev 0 to emergency plan, Changes ref ect lessons learned from table. top drills conducted in preparation for 850517-18 emergency exercise 8 make emergency plan consistent w/p'lant emergency procedures.

DISTRIBUTION CODE: A04SD COPIES RECEIVED:LTR Q ENCL QQ SIZE:

/~~

TITLE: OR Submi t tel Emer gency Prep Corr espondence NOTES:

RECIPIENT COPIES RECIPIENT'D COPIES ID CODE/NAME LTTR ENCL CODE/NAVE LTTR ENCL".

NRR LB3 .BC 1 1 NRR LB3 LA 1 0, BUCKLEY'S B 01<< l~ 1 INTERNAL: IE/DEPER/EPB 06 2 2 I / R/IRB 12' ES'4 NRR/DS I/AEB 1 1 G. F RGN2 1 EXTERNAL: 24X 1 1 LPDR 03 1 1 NRC PDR NSIC 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12

II 'Wi ~ >>l 4 f "lii>> '

l I) f,f I

'4 1 1 I l>>r 1 gL't>>4 II 4 4 ~ 44 4

'4 'l l 1 ~ f>>>> C

'I r l lf rr ~ ~ 44jw, f >>1 I

I Jl 4

if 4 e 1 [ ) ffW l4>>if')'4'lr 4 q 4'Sr f4>>f444 ) 4 fi f )f>>>f f44>>t II >4 ~ 4 wc~,i~ >>W')f l ) W~r, f Wl ~ t3 w>>I t ~ C4

~ 'll

~ li 4W'l ~ I>>CI~

l 'fry')lw f 4'f rfr free f, r.

4 4 r'; 4 Y ) n.') r1 a n ilies

)f4>>4>>f>>t, I41 'I 4

>')ll') 1 y

>>4

')4'f

,41 p ll', r '1'f l X t)>>4>> Vlf+I

>>4 J

a fr'I""

f 4)gcft >>lt [ II~/I f (1>>W

<<fc.

r >) .4 I .j ' g f ) Wll fr f. 4)WW 1 c'. [ 4 ll ') i,rlI,tl >>ftf'1>> I ll 'f "f>>f'4' f' t~ yflw, [f l f

~

((I

>ff f')J f 4144fc f 4['ff 44[

.rl 1

> f [

I f 4 W Q lr 4 4-k IAIDO <f)WXf[  ; 14>> f ff,

"'f>I> II, 4 Q " I >> ll 41 c 1

S 4e

@ME Carolina Power & Light Company SERIAL: NLS-85-235

'UL'"08 NSS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 REVISION 0 TO EMERGENCY PLAN

Dear Mr. Denton:

Carolina Power R Light Company provides thirteen (13) copies of Revision 0 to th'e Shearon Harris Nuclear Power Plant (SHNPP) Emergency Plan. Three (3) copies are being sent directly to the Region II Regional Administrator, Dr. 3. Nelson Grace, by copy of this letter.

The changes made in Revision 0 to the SHNPP Emergency Plan primarily include:

1. Changes to reflect lessons learned from the table top drills conducted in preparation for the Emergency Exercise that was held May 17-18, 1985.
2. Changes to make the Emergency Plan consistent with the Plant Emergency Procedures.

Instructions for inserting the revised pages are enclosed. The revisions are indicated by vertical bars in the right-hand margin of the page. If you have any question, please contact Mr. Gregg A. Sinders at (919) 836-8168.

Yours very truly, 07P50230 850708

@DR ADOCK 05000400 pl)R R. A. Watson Vice President F Harris Nuclear Project GAS/crs Enclosure Cct Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. J. Nelson Grace (NRC-Rll)>> Dr. Richard D. Wilson Mr. G. Simonds (NRC-EPB) Mr. S. W. Perry (FEMA)

Mr. Travis Payne (KUDZU) Mr. S. Rochlis (FEMA)

Mr. Daniel F. Read (CHANGE/ELP) Mr. G. O. Bright (ASLB)

Wake County Public Library Dr. 3. H. Carpenter (ASLB)

Mr. J. L. Kelley (ASLB)

~ three copies 411 Fayettevilte Street o P. O. Box 1551 o Raleigh. N. C. 27602

l

') 8

INSTRUCTIONS FOR UPDATING SHNPP EMERGENCY PLAN, REVISION 0

l. Remove, but do not yet discard the entire contents of the Emergency Plan binder.
2. Separate and save the following pages from the existing Revision 3 copy that you just removed from the binder:

All index tabs (1 through 7 and A through B) and two plastic pockets (for Figures O.l-l and 0.1-2)

Figure 1.5-1 Figure 1.5-2 Figure 1.8-2 Figure 1.8-3 I Figure 6.2-1 All agreement letters in Appendix A Figure G-1 Figure G-2 Figure G-0 Annex H

3. Discard all remaining pages of Revision 3.
0. Before placing the new Revision 0 into the binder, insert the pages that you have saved from Revision 3 into Revision 0 at the following appropriate places:

A) Insert index tab 1 in front of page l-l B) Insert Figures 1.5-1 and 1.5-2 in front of 1.5-3 C) Insert Figures 1.8-2 and 1.8-3 and index tab 2 (in that order) in front of page 2-1 D) Insert index tab 3 in front of page 3-1 E) Insert index tab 0 in front of page O-l F) Insert Figures O.l-i and 0.1-2 (after placing in plastic pockets) and index tab 5 (in that order) in front of page 5-1 G) Insert index tab 6 in front of page 6-1 H) Insert Figure 6.2-1 and index tab 7 (in that order) in front of page 7-1 I) Insert index tab A in front of page A-1

3) Insert index tab B in front of page B-l K) Insert index tab C in front of page C-1 L) Insert index tab D in front of page D-l M) Insert index tab E in front of page E-1 N) Insert index tab F in front of page F-1
0) Insert index tab G in front of page G-1 P) Insert Figures G-1 and G-2 in front of G-3 Q) Insert Figure G-O, index tab H, and Annex H (in that order) at the end
5. Place all pages (except those discarded in step 3) in the order that they are now in, in the binder.

(1665GAS/crs)

r OMj

'L

INSTRUCTIONS FOR UPDATING PLP-20lq REVISION 4~ HAY 1985 4

1 Remove, but do not yet discard the entire contents of the Emergency Plan binder.

2. Separate and save the following pages fzoin the existing Revision 3 copy that you just removed from the binder'.

All index tabs (1 through 7 and A thzough B) and two plastic pockets (for Figuzes 4.1-1 anct 4.1-2)

Figure 1.5-1 Figure 1.5-2 Figure 1.8"2 Figure 1.8"3 Figure G"1 4) ( <gy~~p< j'p+~ IA pppeaal(x A Figure G"2 Figure G"4 Annex H

3. Discard all remaining pages of Revision 3.
4. Before placing'he new Revision 4 into the binder, insert the pages that you have saved from.Revision 3 into Revision 4 at the following appropriate places:

A) Insert index tab 1 in front of page 1-1 B) Insert Figures 1.5-1 and 1.5-2 in fzont of 1.5-3 C) Insert Figures 1.8-2 and 1.8-3 and index tab 2 (in that order) in front of page 2"1 D) Insert, index tab 3 in front of page 3>>1

..E) .: Insert .index tab 4 in front of page 4-1

'..."F),'nsert Figures 4.1-1 and.4.1-2 (after pLacing in plastic pockets) and index tab 5 (in that order) in front of page 5-1

..') H)

Insert index tab 6 in'ront of page 6-1 Insert Figure 6.2-1 and index tab 7 (in that order) in front of page 7-1, I) Insert index tab A in front of page A-1 J) Insert index tab B in front of page B-l K) Insert index tab C in front of page C-1 L) Insert index tab D in front of page D-L M) Insert index tab E in fzont of page E-1 N) Insert index tab P in front of page F-1

0) Insert index tab G in front of page G-1 P) Insert Figures G-l and G-.2 in fzont of G-3 Q) Insert Figure G"4, index tab H, and Annex H (in that order) at the end Place all pages (except those discarded in step 3) in the order that they are now in, in the binder.

Cia ~ )

~ )