| issue date = 04/30/1979
| issue date = 04/30/1979
| title = Forwards Seismic Monitoring Program,First Data Rept, 770930-790331
| title = Forwards Seismic Monitoring Program,First Data Rept, 770930-790331
| author name = MCDUFFIE M A
| author name = Mcduffie M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400, 05000401, 05000402, 05000403
| docket = 05000400, 05000401, 05000402, 05000403
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.,v''t (',q sa REGULATORY ORMAT ION DISTRIBUTION,SYS~1 (RIDS)\ACCESS ION NBR 7 90507 047 5 DOC~DATE 79/04/30 NOTAR IZED s NO.FACIL:50 400 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 1 CAROLINA'0~401 SHEARON HARRIS NUCLEAR POWER PLANTR UNIT'i CAROLINA 50 402 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 3e CAROLINA AUTH~NAME'UTHOR AFF IL IAT ION MCDUFFIEPM
{{#Wiki_filter:'t.,v' ',q sa
~A~" CAROLINA POWER&LIGHT CO~RECIP~NAME RECIPIENT AFFILIATION DENTON H~R~OFFICE OF NUCLEAR REACTOR REGULATION DOCKET 05000400 05000401 050004(2 SUBJECT'ORWARDS SEISMIC MONITORING PROGRAM@770930 790331 DISTRIBUTION CODE: BOOIS COPIES RECEIVED>LTR j ENCL Z SIZE''+TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE'OTES:
(
'''RECIPIENT ID CODE/NAME ACTIONS 05 PM/0/k~g BC Zhr INTERNAL: 0 06 E 09 GEOSCZEN BR ii MECH ENG BR 13 NATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I&C SYS BR 22 AD SITE TECH 27 EFF L TRT SYS 29 KIRKWOOD AD PLANT SYS AD SITE" ANLYSIS MPA EXTERNALS 03 LPDR 30 ACRS COPIES LTTR ENCL 1 1 1 0 1 1 2 2 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 0 1 0 1 0 1 1 10 10 REC IP IENT ID CODE/NAME AD Ud~eC.co LA l Lclrf 4~02 NRC PDR 08 OPERA L IC BR io QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTA1N SYS 21 POWER SYS BR 26 ACCDNT ANI YS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 04 NSIC COPIES LTTR ENCL'1 0 1 0 1 1 1 1 1,, 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 0 1 0 1 0 1 1~cr8 g8 FP8>4 M 8P%cd P c-8 MQ'TOTAL NUMBER OF COPIES REQUIRED: LTTR 49 ENCL 39 Ii 4 II~k P I V EW C I l r', I l J/
REGULATORY       ORMAT ION DISTRIBUTION,SYS~1 (RIDS)                   \
Carolina Power&Lighl Company April 30, 1979 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS.1, 2, 3, AND 4 DOCKET NOS.50-400, 50-401, 50-402, AND 50-403 SEISMIC MONITORING'PROGRAM
ACCESS ION NBR 7 90507 047 5         DOC ~ DATE   79/04/30 NOTAR IZED s                       NO.             DOCKET FACIL:50 400 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 1                                   CAROLINA         05000400
                    '0~401 SHEARON HARRIS NUCLEAR POWER PLANTR                                   UNIT'i CAROLINA         05000401 50 402 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 3e                                 CAROLINA         050004(2 AUTH ~ NAME   'UTHOR AFF IL IAT ION MCDUFFIEPM ~ A ~       CAROLINA POWER & LIGHT CO ~
RECIP ~ NAME           RECIPIENT AFFILIATION DENTON   H~R ~         OFFICE OF NUCLEAR REACTOR REGULATION SUBJECT'ORWARDS SEISMIC MONITORING PROGRAM@770930 790331 DISTRIBUTION CODE: BOOIS         COPIES RECEIVED>LTR         j                     ENCL Z SIZE'     '   +
                        '''    TITLE:   PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE'OTES:
RECIPIENT           COPIES              REC IP IENT                            COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME                            LTTR
                                  /0/k~g ENCL'1 ACTIONS      05 PM                    1     1     AD Ud~eC.co                                           0 BC  Zhr                  1    0      LA   l Lclrf 4 ~                           1          0 INTERNAL:    0                        1      1      02 NRC PDR                                 1          1 06        E              2    2      08 OPERA L IC BR                           1          1 09 GEOSCZEN BR                          io QAB                                   1,,        1 ii  MECH ENG BR 13 NATL    ENG BR 1
1 2    2 1
1      12 STRUC ENG BR 15 REAC SYS BR 1
1 1
1 16 ANALYSIS BR            1      1      17 CORE PERF BR                           1          1 18 AUX SYS BR            1      1      19 CONTA1N SYS                             1          1 20 I & C SYS BR          1      1      21 POWER SYS BR                           1          1 22 AD SITE TECH                        26 ACCDNT ANI YS                           1          1 27 EFF L TRT SYS          1      1      28 RAD ASMT BR                             1          1 29 KIRKWOOD              1      1      AD FOR ENG                                             0 AD PLANT SYS              1    0      AD REAC SAFETY                             1           0 AD SITE" ANLYSIS          1     0       DIRECTOR NRR                              1           0 MPA                      1     0       OELD                                      1           0 EXTERNALS 03 LPDR                      1     1     04 NSIC                                    1           1 30 ACRS                10    10
                                                                ~cr8 g8 FP8     >4 M 8P %cd P c-8 MQ' TOTAL NUMBER OF COPIES REQUIRED: LTTR               49   ENCL                         39


==Dear Mr.Denton:==
Ii 4
On February 13, 1976, Carolina Power&Light Company committed to commence a seismic monitoring pxogram in order to provide appropriate base-line data prior to the scheduled commencement of filling of the Auxiliary Reservoir in June, 1979..Attached is the First Data Report, Shearon Harris Nuclear Power Plant Seismic Monitoring Program.The seismic network was installed and became operational on September 30, 1977.The attached report provides data collected during the period September 30, 1977 to March 31, 1979.Future reports will be subadtted quarterly commencing with the'period April 1," 1979 to June 30, 1979.Yours very truly, M.A.McDuffie Senior Vice President Engineering
II
&Construction SDF/mf Attachment v 9050'.o~7+411 FayetteVitle Street~P.O.'BOX 1551~Raleigh.N.C.27602 I l}}
                ~k P
I V
EW C
I l r',
I l
J
                                  /
 
Carolina Power & Lighl Company April 30,      1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.      20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 SEISMIC MONITORING'PROGRAM
 
==Dear Mr. Denton:==
 
On February 13, 1976, Carolina Power & Light Company committed to commence a seismic monitoring pxogram in order to provide appropriate base-line data prior to the scheduled commencement of filling of the Auxiliary Reservoir in June, 1979.
          .Attached is the First Data Report, Shearon Harris Nuclear Power Plant Seismic Monitoring Program. The seismic network was installed and became operational on September 30, 1977. The attached report provides data collected during the period September 30, 1977 to March 31, 1979.
Future reports will be subadtted quarterly commencing with the 'period April 1," 1979 to June 30, 1979.
Yours very       truly, M. A. McDuffie Senior Vice President Engineering & Construction SDF/mf Attachment v 9050'.o       ~7+
411 FayetteVitle Street ~ P. O.'BOX 1551 ~ Raleigh. N. C. 27602
 
I l}}

Latest revision as of 20:45, 3 February 2020

Forwards Seismic Monitoring Program,First Data Rept, 770930-790331
ML18003A579
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/30/1979
From: Mcduffie M
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18003A580 List:
References
NUDOCS 7905070475
Download: ML18003A579 (4)


Text

't.,v' ',q sa

(

REGULATORY ORMAT ION DISTRIBUTION,SYS~1 (RIDS) \

ACCESS ION NBR 7 90507 047 5 DOC ~ DATE 79/04/30 NOTAR IZED s NO. DOCKET FACIL:50 400 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 1 CAROLINA 05000400

'0~401 SHEARON HARRIS NUCLEAR POWER PLANTR UNIT'i CAROLINA 05000401 50 402 SHEARON HARRIS NUCLEAR POWER PLANTE UNIT 3e CAROLINA 050004(2 AUTH ~ NAME 'UTHOR AFF IL IAT ION MCDUFFIEPM ~ A ~ CAROLINA POWER & LIGHT CO ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTON H~R ~ OFFICE OF NUCLEAR REACTOR REGULATION SUBJECT'ORWARDS SEISMIC MONITORING PROGRAM@770930 790331 DISTRIBUTION CODE: BOOIS COPIES RECEIVED>LTR j ENCL Z SIZE' ' +

TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE'OTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR

/0/k~g ENCL'1 ACTIONS 05 PM 1 1 AD Ud~eC.co 0 BC Zhr 1 0 LA l Lclrf 4 ~ 1 0 INTERNAL: 0 1 1 02 NRC PDR 1 1 06 E 2 2 08 OPERA L IC BR 1 1 09 GEOSCZEN BR io QAB 1,, 1 ii MECH ENG BR 13 NATL ENG BR 1

1 2 2 1

1 12 STRUC ENG BR 15 REAC SYS BR 1

1 1

1 16 ANALYSIS BR 1 1 17 CORE PERF BR 1 1 18 AUX SYS BR 1 1 19 CONTA1N SYS 1 1 20 I & C SYS BR 1 1 21 POWER SYS BR 1 1 22 AD SITE TECH 26 ACCDNT ANI YS 1 1 27 EFF L TRT SYS 1 1 28 RAD ASMT BR 1 1 29 KIRKWOOD 1 1 AD FOR ENG 0 AD PLANT SYS 1 0 AD REAC SAFETY 1 0 AD SITE" ANLYSIS 1 0 DIRECTOR NRR 1 0 MPA 1 0 OELD 1 0 EXTERNALS 03 LPDR 1 1 04 NSIC 1 1 30 ACRS 10 10

~cr8 g8 FP8 >4 M 8P %cd P c-8 MQ' TOTAL NUMBER OF COPIES REQUIRED: LTTR 49 ENCL 39

Ii 4

II

~k P

I V

EW C

I l r',

I l

J

/

Carolina Power & Lighl Company April 30, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C. 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NOS. 1, 2, 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 SEISMIC MONITORING'PROGRAM

Dear Mr. Denton:

On February 13, 1976, Carolina Power & Light Company committed to commence a seismic monitoring pxogram in order to provide appropriate base-line data prior to the scheduled commencement of filling of the Auxiliary Reservoir in June, 1979.

.Attached is the First Data Report, Shearon Harris Nuclear Power Plant Seismic Monitoring Program. The seismic network was installed and became operational on September 30, 1977. The attached report provides data collected during the period September 30, 1977 to March 31, 1979.

Future reports will be subadtted quarterly commencing with the 'period April 1," 1979 to June 30, 1979.

Yours very truly, M. A. McDuffie Senior Vice President Engineering & Construction SDF/mf Attachment v 9050'.o ~7+

411 FayetteVitle Street ~ P. O.'BOX 1551 ~ Raleigh. N. C. 27602

I l