ML18009A370: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000400/1989028]]
{{Adams
| number = ML18009A370
| issue date = 02/01/1990
| title = Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301
| author name = Richey R
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000400
| license number =
| contact person =
| case reference number = CON-NRC-699
| document report number = HO-900027-(O), NUDOCS 9002120336
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
}}
 
=Text=
{{#Wiki_filter:ACCELERATED DI                'TION DEMONS                      >ION SYSTEM r
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:9002120336            DOC.DATE:  90/02/01  NOTARIZED: NO          DOCKET FACIL:50-400 Shearon Harris Nuclear power Plant, Unit 1, Carolina                05000400 AUTH. NAME  .        AUTHOR AFFILIATXON RICHEY,R.B.          Carolina Power 6 Light Co.
RECIP.NAME          RECIPIENT AFFXLIATION Document Control Branch (Document          Control Desk)
 
==SUBJECT:==
Informs of completion of certain corrective actions to violations noted in Insp Rept 50-400/89-29 by 900301.
DISTRIBUTION CODE: IE01D          COPIES RECEIVED:LTR      ENCL        SXZE:
TITLE: General    (50  Dkt)-Insp Rept/Notice of Vi lation            sponse NOTES:Application for permit renewal filed.                                      05000400 RECIPXENT              COPIES          RECIPXENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME        LTTR ENCL PD2-1 PD                                BECKER,D INTERNAL: ACRS                                    AEOD AEOD/DEIIB                              AEOD/TPAD
          ~
DEDRO                                  NRR SHANKMAN,S NRR/DLPQ/LPEB10                        NRR/DOEA DIR 11 NRR/DREP/PEPB9D                        NRR/DREP/PRPBll NRR/DRIS/DIR                            NRR/DST/DIR 8E2 NRR/PMAS/ILRB12                        NUDOCS-ABSTRACT OGC/HDS1 REG F LE        02                      RES MORISSEAU,D G 2    FILE  01 EXTERNAL: LPDR                                    NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE IVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
OTAL NUMBER OF COPIES REQUIRED: LTTR            26 ENCL
 
CHILL Carolina Power 8 Ught Company P. O. Box t65 ~ New Hill, N. C. 27662 R. B. RICHEY Manager Nants Nuclear Prelect FFB    -
                          $ )99P Letter      Number:      HO-900027      (0)
Document      Control Desk                                                                NRC-699 United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE      NO ~    NPF-63 Gentlemen:
In      reference      to your December 8, 1989, Inspection Carolina Power and Light Company on January 3, 1990,                    Report,'0-400/89-28, responded to the Notice of Viol.ation identified in the report. At;>>,
time of our response,                it was expected that the planned                                    'he corrective steps", to prevent further violat'.ions would be .completed The purpose. of this letter is to inform you by February 1, 1990.
that certain corrective actions, will not be completed until .
March, 1, 1990.          Specifically, 1) the establishment "of guidelines-for overtime worked by personnel involved . in testing of'.
safety-related equipment and 2) the development of a plant general order which will provide. specific controls and exclusions.-
concerning the use of instrument air for activities requiring connection to internally contaminated systems.                                      This matter was discussed        with ,the Harris NRC 'enior; Resident, Inspector,,                    -
Mr. Jeff  Tedzow, on January 30,,'1990.
Thank you      for  your, consideration          in'his        matter.
Very    truly      yours, R. B.      Richey, Mana Nuclear Pr ject, e'r'arris MGW:dgr cc:    Mr. R. A. Becker (NRC)
Mr. S. D. Ebneter (NRC  RII),
Mr. J. E. Tedrow (NRC. SHNPP)                .
900 '120&t 'o00201 FOR ADOCK Cl5000400 t.4                            F'DC M EM/  HO-9000270/ 1/OS    1}}

Latest revision as of 21:15, 3 February 2020

Informs That Planned Corrective Actions Re Violations Noted in Insp Rept 50-400/89-28 Will Not Be Completed Until 900301
ML18009A370
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/01/1990
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-699 HO-900027-(O), NUDOCS 9002120336
Download: ML18009A370 (2)


Text

ACCELERATED DI 'TION DEMONS >ION SYSTEM r

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:9002120336 DOC.DATE: 90/02/01 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear power Plant, Unit 1, Carolina 05000400 AUTH. NAME . AUTHOR AFFILIATXON RICHEY,R.B. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs of completion of certain corrective actions to violations noted in Insp Rept 50-400/89-29 by 900301.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SXZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vi lation sponse NOTES:Application for permit renewal filed. 05000400 RECIPXENT COPIES RECIPXENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD BECKER,D INTERNAL: ACRS AEOD AEOD/DEIIB AEOD/TPAD

~

DEDRO NRR SHANKMAN,S NRR/DLPQ/LPEB10 NRR/DOEA DIR 11 NRR/DREP/PEPB9D NRR/DREP/PRPBll NRR/DRIS/DIR NRR/DST/DIR 8E2 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT OGC/HDS1 REG F LE 02 RES MORISSEAU,D G 2 FILE 01 EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL

CHILL Carolina Power 8 Ught Company P. O. Box t65 ~ New Hill, N. C. 27662 R. B. RICHEY Manager Nants Nuclear Prelect FFB -

$ )99P Letter Number: HO-900027 (0)

Document Control Desk NRC-699 United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO ~ NPF-63 Gentlemen:

In reference to your December 8, 1989, Inspection Carolina Power and Light Company on January 3, 1990, Report,'0-400/89-28, responded to the Notice of Viol.ation identified in the report. At;>>,

time of our response, it was expected that the planned 'he corrective steps", to prevent further violat'.ions would be .completed The purpose. of this letter is to inform you by February 1, 1990.

that certain corrective actions, will not be completed until .

March, 1, 1990. Specifically, 1) the establishment "of guidelines-for overtime worked by personnel involved . in testing of'.

safety-related equipment and 2) the development of a plant general order which will provide. specific controls and exclusions.-

concerning the use of instrument air for activities requiring connection to internally contaminated systems. This matter was discussed with ,the Harris NRC 'enior; Resident, Inspector,, -

Mr. Jeff Tedzow, on January 30,,'1990.

Thank you for your, consideration in'his matter.

Very truly yours, R. B. Richey, Mana Nuclear Pr ject, e'r'arris MGW:dgr cc: Mr. R. A. Becker (NRC)

Mr. S. D. Ebneter (NRC RII),

Mr. J. E. Tedrow (NRC. SHNPP) .

900 '120&t 'o00201 FOR ADOCK Cl5000400 t.4 F'DC M EM/ HO-9000270/ 1/OS 1