| issue date = 06/30/1980
| issue date = 06/30/1980
| title = Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch
| title = Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch
| author name = CHIANGI N J
| author name = Chiangi N
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000400
| docket = 05000400
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR 8007080209
{{#Wiki_filter:REGULATOR     INFORMATION DISTRIBUTION               STEM (RIDS)
'OC~DATE~80/06/30 NOTARIZED NO FACIL:50 400 Shearon Harris Nuclear Power Plantg Unit ii Carolina 50-401 Shear'on Harris Nuclear Power Plantg Unit 2r Carolina 50-002 Shearon Harris Nuclear Power Plant~Unit 3i Carolina AUTH'AME AUTHOR AFFILIATION CHIANGI~N~J~Car ol fna Power L Light=Co, RECIP~NAME RECIPIENT AFFILIATION OiREILLYg JBP, Region 2r At 1 enter Of f ice of the Director DO 0 00001 05000402'UBJECT:
ACCESSION NBR 8007080209         'OC       DATE ~ 80/06/30 NOTARIZED NO                 DO FACIL:50 400 Shearon Harris Nuclear Power Plantg Unit ii Carolina
For wards f inal def iciency rept r e omission of addi reinforcing steel in Unit 1 containment bldg exter ior wall ad]scent to const opening for equipment hatch.DISTRIBUTION CODE: S0190 COPIES RECEIVEDTLTR
                                          ~
'g ENCI'SIZE"~TITLE: Construction Deficiency Report'10CFR50.55E)
50-401 Shear'on Harris Nuclear Power Plantg Unit 2r Carolina                       0                00001 50-002 Shearon Harris Nuclear Power Plant~ Unit 3i Carolina AUTH'AME               AUTHOR   AFFILIATION CHIANGI~N~ J ~         Car ol fna Power       L Light= Co, RECIP ~ NAME           RECIPIENT AFFILIATION                                             05000402'UBJECT:
NOTFS: RECIPIENT ID CODE/NAME ACTION!AD t-PCQIUSAP1T-21 LA~S/48ee,'q 20 INTERNAL: AD/RC I/IE DIREHUM FAC SFY EQUIP QUAL'R16 HYD/GEO BR 22, LIC QUAL.BR MPA 08 OELD 23 PROC/T REV BR I 01 COPIES LTTR ENCL 1 1 1 1 1,: 1 1 1 1, 1 1" 1 1 1 1 1 1 1 1 1 1 1 RECIf IENT ID CODE/NAME, BC YCl068cedgi 5.PM gjj~~~10 AEOD EDO 8 STAFF 07 FIELD COOR/IE13 I8E 05 MOORErV~NRC PDR 02 OR ASSESS BR 17 QA BR'0 STANDRDS DEV 11 COPIES LTTR ENCL" 1 1 1 1 1 1 1 1 1, 1 2 2 1.1 1 1 1 1 1 1 1 1 EXTERNAL!ACRS NSIC 20 00 16 16 1 1 LPDR 03 1 1 JUL 20]g89 TOTAL NUMBER OF COPIES REQUIRED: LTTR 01 ENCL 01 li~~fl FORM 22-SOM Pile: SH N-2/18 Item 30 PQL Carolina Power&Light Company June 30, 1980 kir.James P.O'Reilly United States Nuclear Regulatory Commission Region XX 101 Marietta Street, Horthwest Atlanta, Georgia 30303 SHEARON HARRXS NUCLEAR POWER PLAHT UNITS 1, 2, 3 AND 4 DOCKET HOS~50 400'0 401i 50 402'0 403 OMISSXON OP REMR IN UNIT iI'1 CONTAINMENT BUILDING OPEN ITEtt 400/80-11-02
OiREILLYgJBP,             Region 2r At enter Of f ice 1                of the Director For wards   f inal def iciency rept e omission of addi r
reinforcing steel in Unit containment bldg exter ior wall 1
ad]scent to const opening for equipment hatch.
DISTRIBUTION CODE: S0190         COPIES RECEIVEDTLTR           'g ENCI '
TITLE: Construction Deficiency Report'10CFR50.55E)
SIZE"~
NOTFS:
RECIPIENT             COPIES                  RECIf IENT            COPIES ID CODE/NAME          LTTR ENCL            ID CODE/NAME,          LTTR ENCL" ACTION!     AD t-PCQIUSAP1T- 21       1        1      BC  YCl068cedgi    5.      1    1 LA~S/48ee,'q     20       1        1      PM  gjj~~ ~        10      1    1 INTERNAL:   AD/RC I/IE               1,:      1      AEOD                        1    1 DIREHUM FAC SFY           1        1      EDO 8  STAFF      07      1    1 EQUIP QUAL'R16             1,        1      FIELD COOR/IE13            1,  1 HYD/GEO BR       22,     1 1      I8E                05      2    2 LIC QUAL. BR               1        1      MOORErV ~                  1. 1 MPA OELD PROC/
I T REV BR 08 23 01 1
1 1
1 1
1 1
1 NRC PDR OR ASSESS QA BR         '0 BR STANDRDS DEV 11 02 17 1
1 1
1 1
1 1
1 EXTERNAL! ACRS               20     16       16     LPDR              03      1   1 NSIC              00      1         1 JUL 20 ]g89 TOTAL NUMBER OF COPIES         REQUIRED: LTTR         01   ENCL     01


==Dear Mr.O'Reilly:==
li ~ ~
Attached is the final 10CPR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish reso-lution.With this report, Carolina Power 6 Light Company considers this matter closed.If you have any quest<'n regarding this matter, please do not hesitate to contact me.Yours very truly, Originaf Signed By N.3.Chiangi N.J.Chiangi-Manager Engineering 6 Construction ality Assurance KVH/mt (4299)cc!Mr.V.Stello (2)W/A y$oi't 5 ih 800'l08 02 8}}
fl
 
FORM 22-SOM PQL Carolina Power & Light Company Pile:  SH  N-2/18 Item 30 June 30, 1980 kir. James P. O'Reilly United States Nuclear Regulatory Commission Region  XX 101  Marietta Street, Horthwest Atlanta, Georgia 30303 SHEARON HARRXS NUCLEAR POWER PLAHT UNITS 1, 2, 3 AND 4 DOCKET HOS ~ 50 400  '0  401i 50 402  '0  403 OMISSXON OP REMR IN UNIT iI'1 CONTAINMENT BUILDING OPEN ITEtt 400/80-11-02
 
==Dear Mr. O'Reilly:==
 
Attached is the final 10CPR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish reso-lution. With this report, Carolina Power 6 Light Company considers this matter closed.
If you have   any quest<'n regarding   this matter, please   do   not hesitate to contact me.
Yours very   truly, Originaf Signed By N. 3. Chiangi N. J. Chiangi - Manager Engineering   6 Construction ality     Assurance KVH/mt   (4299) cc! Mr. V. Stello (2)     W/A y
                                                                                        $ oi't 5
ih 800'l08 02       8}}

Latest revision as of 19:15, 3 February 2020

Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch
ML18017B123
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/30/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18017B124 List:
References
SH-N-2-18, NUDOCS 8007080249
Download: ML18017B123 (3)


Text

REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR 8007080209 'OC DATE ~ 80/06/30 NOTARIZED NO DO FACIL:50 400 Shearon Harris Nuclear Power Plantg Unit ii Carolina

~

50-401 Shear'on Harris Nuclear Power Plantg Unit 2r Carolina 0 00001 50-002 Shearon Harris Nuclear Power Plant~ Unit 3i Carolina AUTH'AME AUTHOR AFFILIATION CHIANGI~N~ J ~ Car ol fna Power L Light= Co, RECIP ~ NAME RECIPIENT AFFILIATION 05000402'UBJECT:

OiREILLYgJBP, Region 2r At enter Of f ice 1 of the Director For wards f inal def iciency rept e omission of addi r

reinforcing steel in Unit containment bldg exter ior wall 1

ad]scent to const opening for equipment hatch.

DISTRIBUTION CODE: S0190 COPIES RECEIVEDTLTR 'g ENCI '

TITLE: Construction Deficiency Report'10CFR50.55E)

SIZE"~

NOTFS:

RECIPIENT COPIES RECIf IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME, LTTR ENCL" ACTION! AD t-PCQIUSAP1T- 21 1 1 BC YCl068cedgi 5. 1 1 LA~S/48ee,'q 20 1 1 PM gjj~~ ~ 10 1 1 INTERNAL: AD/RC I/IE 1,: 1 AEOD 1 1 DIREHUM FAC SFY 1 1 EDO 8 STAFF 07 1 1 EQUIP QUAL'R16 1, 1 FIELD COOR/IE13 1, 1 HYD/GEO BR 22, 1 1 I8E 05 2 2 LIC QUAL. BR 1 1 MOORErV ~ 1. 1 MPA OELD PROC/

I T REV BR 08 23 01 1

1 1

1 1

1 1

1 NRC PDR OR ASSESS QA BR '0 BR STANDRDS DEV 11 02 17 1

1 1

1 1

1 1

1 EXTERNAL! ACRS 20 16 16 LPDR 03 1 1 NSIC 00 1 1 JUL 20 ]g89 TOTAL NUMBER OF COPIES REQUIRED: LTTR 01 ENCL 01

li ~ ~

fl

FORM 22-SOM PQL Carolina Power & Light Company Pile: SH N-2/18 Item 30 June 30, 1980 kir. James P. O'Reilly United States Nuclear Regulatory Commission Region XX 101 Marietta Street, Horthwest Atlanta, Georgia 30303 SHEARON HARRXS NUCLEAR POWER PLAHT UNITS 1, 2, 3 AND 4 DOCKET HOS ~ 50 400 '0 401i 50 402 '0 403 OMISSXON OP REMR IN UNIT iI'1 CONTAINMENT BUILDING OPEN ITEtt 400/80-11-02

Dear Mr. O'Reilly:

Attached is the final 10CPR50.55(e) report on the subject deficiency which describes the problem and the corrective action taken to accomplish reso-lution. With this report, Carolina Power 6 Light Company considers this matter closed.

If you have any quest<'n regarding this matter, please do not hesitate to contact me.

Yours very truly, Originaf Signed By N. 3. Chiangi N. J. Chiangi - Manager Engineering 6 Construction ality Assurance KVH/mt (4299) cc! Mr. V. Stello (2) W/A y

$ oi't 5

ih 800'l08 02 8