ML18018B770: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/12/1984
| issue date = 09/12/1984
| title = Forwards Rev 3 to PLP-201, Emergency Plan. Bases for Rev Listed
| title = Forwards Rev 3 to PLP-201, Emergency Plan. Bases for Rev Listed
| author name = WATSON R A
| author name = Watson R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:J            l REGULATOR          INFORMATION DISTRIBUTION                    STEM                    (RIDS)
ACCESSION NBR:8009180300                  DOC ~ DATE'4/09/12              NOTARIZED: YES                                  DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plantg Unit                                1~                    Carolina      05000400 AUTH, NAME            AUTHOR AFFILIATION NATSONgR,Ae          Carolina Power L Light Co ~
REC IP ~ NAME          RECIPIENT AFFILIATION DENTON,H,R,          Office of Nuclear Reactor Regulationi Director Pe'v aQ  /v/i/$ g
 
==SUBJECT:==
Forwards Rev          3 to emergency plan, Bases for                rev TITlE:    OR CODE; AOQSD            COPIES RECEIVED:LTR Submittal Emergency Prep Correspondence ENCL
                                                                                            'listed'ISTRIBUTION SIZE:,  8+I NOTES:
RECIPIENT                COPIES          RECIPIENT,'D COPIES ID CODE/NAME              LTTR ENCL                    CODE/NAME                              LT7R ENCL NRR LB3- BC                  1          NRR            LB3  L,A                                  1    0 BUCKLEYgB      01            1    1 INTERNAL: ADM/LFMB                          1    0    IE/DEPER/EPB 06                                          2      2' IE/DEPER/IRB                  1    1    NRR/DS I/AEB                                                    1 I/RAB    12'RR/DS 1    1                        S      00                          1    1 RGN2                          1    1    R                    S/EPRPB                              1    1 EXTERNALS      FEMA TECH HAZ                1    1    LPDR                        03                          1    1 ~
NRC PDR,      02            1    1    NSIC                                                      1    1 NTIS          05            1    1 TOTAL NUMBER OF COPIES REQUIRED: LTTR                  17              ENCL      15
 
e o
e a
~ 1 g
 
CÃQE Carolina Power & Light Company SERIAL:  NLS-84-392 SEP  PE t984 Mr. Haxold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC      20555 SHEARON HARRIS NUCLEAR PONER PLANT UNIT NO ~ 1  DOCKET NO. 50-400 REVISION 3 TO EMERGENCY PLAN
 
==Dear Mr. Denton:==
 
In accordance with the requirements of Generic Letter 82-14, Carolina Power &
Light Company (CP&L) hereby submits thirteen (13) copies of Revision 3 to the Shearon Harris Nuclear Power Plant (SHNPP) Emergency Plan. Three (3) of the thirteen (13) copies are being sent directly to the Region                        II Regional Administrator, Mr. J.      P. O'Reilly, by copy of this letter.
The changes  made  in Revision        3  of the    SHNPP    Emergency Plan are based upon the following:
: 1. While  writing detailed procedures, CP&L discovered enhancements and consistency improvements that necessarily affected the SHNPP Emergency Plan.
: 2. The  protective action recommendations flow chart was revised to more closely follow the sequence of Information Notice 83-28 while incorporating the barriex concept of the Emergency Action Levels (EAL).
: 3. Additional information is provided xeflecting the                        EAL concepts contained in Plant  Emergency Procedure            (PEP)-101.
: 4. The PEPs  list    (Annex E) was revised to reflect the current configuration of the PEPs,    which has consolidated many procedures and deleted procedures duplicating activities and pxocedures covered elsewhere in the plant manual.
: 5. The frequency of health physics              drills,    involving simulated elevated airborne and liquid samples, has been reduced to annually in accordance with NUREG-0654, Revision 1.
: 6. Other  editorial    and minor changes.
8409180300 840'Pi2 PDR ADOCK 05000400 F                    'PDR.
p0 411 Fayettevilte Street o P. O. 8ox 1551 ~ Raleigh, N. C. 27602
 
            ~ 0 1,
d      I 1
'I
 
Mr. Harold R. Denton Changes  are indicated by vertical bars in the right-hand margin of the revised pages. Text pages have been printed on both sides.
If you  have any questions,  please contact Mr. Gregg A. Sinders at (919) 836-8168.
Yours very  truly, Ed'D R. A. Watson  Vice  President Harris Nuclear Project GAS/mf    (545GAS)
Enclosure cc w/enclosure:
Mr. C. A. Barth (NRC)                  Wake County  Public Library Mr. B. C. Buckley (NRC)                Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)          Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII)**          Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)                Mr. G. 0. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)        Dr. J. H. Carpenter (ASLB)
Mr. S. W. Perry (FEMA)                  Mr. J. L. Kelley (ASLB)
Chapel  Hill Public  Library            Mr. G. E. Simonds (NRC)
        ** three (3) copies R. A. Watson,    having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.
Notary my  commission expires:  Q/lf/ff
 
INSTRUCTIONS FOR UPDATING PLP-201
: 1. Remove  ,  but  do  not yet discard the entire contents of the Emergency Plan binder.
: 2. Separate and save the following pages from the 'existing Revision      2  copy that you just removed from the binder:
All index  tabs (1 through 7 and A through  H)
Figure 1.5-1 Fig'ures 1.8-1, 1.8-2, 1.8-3 Figures G-l, G-2, G-3, and G-4
: 3. Discard  all  remaining pages of Revision  2
: 4. Before placing the new Revision      3 into the binder, insert the pages that you have saved from Revision 2      into Revision 3 at the following appropriate places:
A)  Insert index tab 1 in front of page l-l B)  Insert Figure 1;5-1 in front of Figure 1.5-2 C) Insert Figures 1.8-1, 1.8-2, and 1.8-3 and index tab      2 (in that order) in front of page 2-1        p D) Insert index tab 3 in front of page 3-1 E) Insert index tab 4 in front 'of page 4-1 F) Insert index tab 5 in front of page 5-1 G)  Insert index tab 6 in front of page 6-1 H) Insert index tab 7 in front of page 7-1 I) Insert index tab A in front of page A-1 J) Insert index tab B in front of page B-1 K) Insert index tab C in front of page C-1 L) Insert index tab D in front of page D-1 M) Insert index tab E in front of page E-1 N) Insert index tab F in front of page F-1
: 0) Insert index tab G in front of page G-1 P) Insert Figures G-l, G-2, G-3 and G-4 , and index tab      H (in that order) in front of Annex H
: 5. Place all pages (except those discarded      in step 3) in the order that they are now in, in the binder.
0}}

Latest revision as of 19:30, 3 February 2020

Forwards Rev 3 to PLP-201, Emergency Plan. Bases for Rev Listed
ML18018B770
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/12/1984
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018B771 List:
References
GL-82-114, GL-82-14, NLS-84-392, NUDOCS 8409180300
Download: ML18018B770 (7)


Text

J l REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:8009180300 DOC ~ DATE'4/09/12 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plantg Unit 1~ Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION NATSONgR,Ae Carolina Power L Light Co ~

REC IP ~ NAME RECIPIENT AFFILIATION DENTON,H,R, Office of Nuclear Reactor Regulationi Director Pe'v aQ /v/i/$ g

SUBJECT:

Forwards Rev 3 to emergency plan, Bases for rev TITlE: OR CODE; AOQSD COPIES RECEIVED:LTR Submittal Emergency Prep Correspondence ENCL

'listed'ISTRIBUTION SIZE:, 8+I NOTES:

RECIPIENT COPIES RECIPIENT,'D COPIES ID CODE/NAME LTTR ENCL CODE/NAME LT7R ENCL NRR LB3- BC 1 NRR LB3 L,A 1 0 BUCKLEYgB 01 1 1 INTERNAL: ADM/LFMB 1 0 IE/DEPER/EPB 06 2 2' IE/DEPER/IRB 1 1 NRR/DS I/AEB 1 I/RAB 12'RR/DS 1 1 S 00 1 1 RGN2 1 1 R S/EPRPB 1 1 EXTERNALS FEMA TECH HAZ 1 1 LPDR 03 1 1 ~

NRC PDR, 02 1 1 NSIC 1 1 NTIS 05 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 15

e o

e a

~ 1 g

CÃQE Carolina Power & Light Company SERIAL: NLS-84-392 SEP PE t984 Mr. Haxold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR PONER PLANT UNIT NO ~ 1 DOCKET NO. 50-400 REVISION 3 TO EMERGENCY PLAN

Dear Mr. Denton:

In accordance with the requirements of Generic Letter 82-14, Carolina Power &

Light Company (CP&L) hereby submits thirteen (13) copies of Revision 3 to the Shearon Harris Nuclear Power Plant (SHNPP) Emergency Plan. Three (3) of the thirteen (13) copies are being sent directly to the Region II Regional Administrator, Mr. J. P. O'Reilly, by copy of this letter.

The changes made in Revision 3 of the SHNPP Emergency Plan are based upon the following:

1. While writing detailed procedures, CP&L discovered enhancements and consistency improvements that necessarily affected the SHNPP Emergency Plan.
2. The protective action recommendations flow chart was revised to more closely follow the sequence of Information Notice 83-28 while incorporating the barriex concept of the Emergency Action Levels (EAL).
3. Additional information is provided xeflecting the EAL concepts contained in Plant Emergency Procedure (PEP)-101.
4. The PEPs list (Annex E) was revised to reflect the current configuration of the PEPs, which has consolidated many procedures and deleted procedures duplicating activities and pxocedures covered elsewhere in the plant manual.
5. The frequency of health physics drills, involving simulated elevated airborne and liquid samples, has been reduced to annually in accordance with NUREG-0654, Revision 1.
6. Other editorial and minor changes.

8409180300 840'Pi2 PDR ADOCK 05000400 F 'PDR.

p0 411 Fayettevilte Street o P. O. 8ox 1551 ~ Raleigh, N. C. 27602

~ 0 1,

d I 1

'I

Mr. Harold R. Denton Changes are indicated by vertical bars in the right-hand margin of the revised pages. Text pages have been printed on both sides.

If you have any questions, please contact Mr. Gregg A. Sinders at (919) 836-8168.

Yours very truly, Ed'D R. A. Watson Vice President Harris Nuclear Project GAS/mf (545GAS)

Enclosure cc w/enclosure:

Mr. C. A. Barth (NRC) Wake County Public Library Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII)** Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. 0. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Mr. S. W. Perry (FEMA) Mr. J. L. Kelley (ASLB)

Chapel Hill Public Library Mr. G. E. Simonds (NRC)

    • three (3) copies R. A. Watson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light Company.

Notary my commission expires: Q/lf/ff

INSTRUCTIONS FOR UPDATING PLP-201

1. Remove , but do not yet discard the entire contents of the Emergency Plan binder.
2. Separate and save the following pages from the 'existing Revision 2 copy that you just removed from the binder:

All index tabs (1 through 7 and A through H)

Figure 1.5-1 Fig'ures 1.8-1, 1.8-2, 1.8-3 Figures G-l, G-2, G-3, and G-4

3. Discard all remaining pages of Revision 2
4. Before placing the new Revision 3 into the binder, insert the pages that you have saved from Revision 2 into Revision 3 at the following appropriate places:

A) Insert index tab 1 in front of page l-l B) Insert Figure 1;5-1 in front of Figure 1.5-2 C) Insert Figures 1.8-1, 1.8-2, and 1.8-3 and index tab 2 (in that order) in front of page 2-1 p D) Insert index tab 3 in front of page 3-1 E) Insert index tab 4 in front 'of page 4-1 F) Insert index tab 5 in front of page 5-1 G) Insert index tab 6 in front of page 6-1 H) Insert index tab 7 in front of page 7-1 I) Insert index tab A in front of page A-1 J) Insert index tab B in front of page B-1 K) Insert index tab C in front of page C-1 L) Insert index tab D in front of page D-1 M) Insert index tab E in front of page E-1 N) Insert index tab F in front of page F-1

0) Insert index tab G in front of page G-1 P) Insert Figures G-l, G-2, G-3 and G-4 , and index tab H (in that order) in front of Annex H
5. Place all pages (except those discarded in step 3) in the order that they are now in, in the binder.

0