| issue date = 11/30/1984
| issue date = 11/30/1984
| title = Forwards Amend 18 to FSAR for Shearon Harris Unit 1.Amend Revises Fire Protection Tables & Discussions Re Combustible Loading
| title = Forwards Amend 18 to FSAR for Shearon Harris Unit 1.Amend Revises Fire Protection Tables & Discussions Re Combustible Loading
| author name = CUTTER A B
| author name = Cutter A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATOR'r INPORMATION DISTRIBUTION SYSTEM (RIBS)ACCESSION NBR;8412060237 DOC,DATE: 84/11/30 NOTARIZED:
{{#Wiki_filter:REGULATOR'r INPORMATION DISTRIBUTION SYSTEM       (RIBS)
YES FACIL:50-400 Shearon Harris Nuclear Power Planti Unit 1<Carolina AUTH, NAME AUTHOR AFFILIATION CUTTERiA~B, Carolina Power L Light Co.REC IP~NAME RECIPIENT AFFILIATION DENTONgH~RE Office of Nuclear Reactor Regulationg Director DOCKET 05000400
ACCESSION NBR;8412060237         DOC,DATE: 84/11/30     NOTARIZED: YES         DOCKET FACIL:50-400 Shearon Harris Nuclear Power Planti Unit             1< Carolina 05000400 AUTH, NAME           AUTHOR AFFILIATION CUTTERiA ~ B,         Carolina Power L Light Co.
REC IP ~ NAME         RECIPIENT AFFILIATION DENTONgH ~ RE         Office of Nuclear Reactor Regulationg Director


==SUBJECT:==
==SUBJECT:==
Forwards Amend 18 to FSAR for Shearon Harris revise.e protection tables 8 discus ions DISTRIBUTION CO.B001D COPIE REC IV: R TITLE: Li censing Submittal:
Forwards Amend 18 to FSAR for Shearon Harris Unit 'mend    1 revise     . e protection tables 8 discus ions re combustible MP>
PSAR/FSAR Amd L Related NOTES: Unit 1'mend re combustible p MP>&+I 3~Correspondence RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ACRS ELD/HDS1 IE/DEPER/EPB 36 IE/DOASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB-NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12NRR I/RAB 22 04 MIB EXTERNALS BNL(AMDTS ONLY)FEMA-REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL.1 0 1" 0 6 6 1 0 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 0 1~1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 REC IP IENT ID CODE/NAME NRR LB3 BC BUCKLEYiB 01 ADM/LFMB IE F ILE IE/DEPER/IRB 35 NRR ROEiM~L NRR/DE/CEB 11 NRR/DE/EGB 13 NRR/DF/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEBPO NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DS I/I CSB 16 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN2 DMB/DSS (AMDTS)LPDR 03 NSIC 05 PNL GRUELgR COPIES LTTR ENCL 1 0 1 1 1 0 1, 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 TOTAL NUMBER OF COPIES REQUIRED: LTTR 50 ENCL 06  
p DISTRIBUTION     CO   . B001D   COPIE REC   IV:     R                       &+I3~
~.~k J~'/I(
TITLE: Li censing     Submittal: PSAR/FSAR Amd       L Related Correspondence NOTES:
CNK Carolina Power 8 Light Company NOV 30 1984 SERIAL: NLS-84-470 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 AMENDMENT NO.18 TO FSAR FIRE PROTECTION
RECIPIENT         COPIES          REC IP IENT          COPIES ID CODE/NAME        LTTR ENCL. ID CODE/NAME           LTTR ENCL NRR/DL/ADL             1      0  NRR  LB3 BC              1    0 NRR LB3 LA           1 0  BUCKLEYiB        01      1    1 INTERNAL: ACRS                     6      6  ADM/LFMB                  1    0 ELD/HDS1               1      0  IE F ILE                  1,    1 IE/DEPER/EPB 36       1      1  IE/DEPER/IRB 35          1    1 IE/DOASIP/QAB21       1      1  NRR ROEiM ~ L            1    1 NRR/DE/AEAB           1      0  NRR/DE/CEB        11      1    1 NRR/DE/EHEB-          1      1  NRR/DE/EGB        13      2    2 NRR/DE/GB      28    2      2  NRR/DF/MEB        18      1    1 NRR/DE/MTEB    17    1       1   NRR/DE/SAB        24      1    1 NRR/DE/SGEB    25    1      1  NRR/DHFS/HFEBPO          1    1 NRR/DHFS/LQB    32    1      1  NRR/DHFS/PSRB            1    1 NRR/DL/SSPB                    0  NRR/DS I/AEB 26           1    1 NRR/DS I/ASB          1      1  NRR/DS I/CPB      10      1 I/I
                                          ~
NRR/DSI/CSB 09        1      1  NRR/DS      CSB   16     1    1 NRR/DSI/METB 12      1      1  NRR/DS I/PSB     19           1 NRR    I/RAB 22        1      1  NRR/DS I/RSB     23     1    1 04    1      1  RGN2                     3    3 MIB        1      0 EXTERNALS BNL(AMDTS ONLY)          1      1  DMB/DSS (AMDTS)
FEMA-REP DIV 39        1      1  LPDR             03 NRC PDR        02    1      1  NSIC             05 NTIS                  1          PNL GRUELgR TOTAL NUMBER OF COPIES REQUIRED: LTTR         50   ENCL     06


==Dear Mr.Denton:==
          ~ . ~
Carolina Power&Light Company (CP&L)hereby transmits three originals and sixty (60)copies of Amendment No.18 to the Shearon Harris Nuclear Power Plant (SHNPP)Final Safety Analysis Report (FSAR).This amendment revises tables and discussions concerning combustible loading in FSAR Section 9.5.1.A draft version of this material was sent by letter dated October 10, 1984.Each revised page bears the amendment number.Technical changes are noted by vertical bars in the page margins.Instructions for entering the revised pages are also included.If you have any questions concerning this amendment please contact Ms.Carol Love of our Nuclear Licensing Section staff at (919)836-8166.Yours very tr y, CGL/cfr (829CGL)Enclosures A.B.Cutter-Vice President Nuclear Engineering
    '/
&Licensing Ccl Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
k J
Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
  ~
Chapel Hill Public Library Wake County Public Library Mr.Wells Eddleman Mr.John D.Runkle Dr.Richard D.Wilson Mr.G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)8412060237 841130 PDR ADOCK 05000400'Ip Street o P.0.Box 1551 m Raleigh.N;C.27602 K PDR, A.B.Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are officers, employees, contractors, and agents of Carolina Power&Light Company.IIII44444pl
I(
~~'.('tary ea My commission expires: 8'/lp/N NOTARY'..Its a$~~B jlC'IlllllllllIIII
'
0 4 E.l'A h I g$p D I Yi A, y-<q ly.
CPKL Carolina Power 5 Light Company Nov 3O 19S4 SERIAL: NLS-84-470 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.1-DOCKET NO.50-400 AMENDMENT NO.18 TO FSAR FIRE PROTECTION


==Dear Mr.Denton:==
CNK Carolina Power 8 Light Company                     SERIAL:   NLS-84-470 NOV  30 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC    20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1    DOCKET NO. 50-400 AMENDMENT NO. 18 TO FSAR FIRE PROTECTION
Carolina Power 6 Light Company (CP6L)hereby transmits three originals and sixty (60)copies of Amendment No.18 to the Shearon Harris Nuclear Power Plant (SHNPP)Final Safety Analysis Report (FSAR).This amendment revises tables and discussions concerning combustible loading in FSAR Section 9.5.1.A draft version of this material was sent by letter dated October 10, 1984.Each revised page bears the amendment number.Technical changes.are noted by vertical bars in the page margins.Instructions for entering the revised pages are also included.If you have any questions concerning this amendment please contact Ms.Carol Love of our Nuclear Licensing Section staff at (919[836-8166.I Yours,very tr ly,~~(r r/: d.'ir'.A.B.Cutter-V/ee Bres1deet Nuclear Engineering
&Licensing CGL/cfr (829CGL)Enclosures CC: Mr.B.C.Buckley (NRC)Mr.G.F.Maxwell (NRC-SHNPP)
Mr.J.P.O'Reilly (NRC-RII)Mr.Travis Payne (KUDZU)Mr.Daniel F.Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr.Wells Fddleman Mr.John D.Runkle Dr.Richard D.Wilson Mre G.0.Bright (ASLB)Dr.J.H.Carpenter (ASLB)Mr.J.L.Kelley (ASLB)My commission expires: D/>8/Bf 41 1 Fayettevrtte Street~P.O.8ox 1$51~ftateigrr.
N, C.27602 g%l pl++//g gjl<lB Q+pi+$'$l su~srl+rtstshgvetrlrslesrtrtrla s'rtssrlftts'v vil l&lr&lt r A.B.Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light~>>>'~"d.;, Company.otary a e'UOUC"rrrttttit'B


SHNPP PSAR CAROLINA POWER 6 LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400 FINAL SAFETY ANALYSIS REPORT-AMENDMENT NO.18 INSTRUCTION SHEET This amendment contains additional or revised technical information and editorial changes in the form of replacement pages for the SHNPP FSAR.Each revised page bears the notation"Amendment No.18" at the page bottom.Vertical bars with the number"18" beside them have been placed in the margins of revised pages to indicate the location of technical revisions on the page.Since many SHNPP FSAR pages are printed double-sided, the replacement pages in this amendment may consist of original information on one side of the page and revised information on the other side.Reference to the amendment identification number in the lower right corner of the page will enable the user to determine the amendment status of the page (whether it is original or revised material).
==Dear Mr. Denton:==
Unchanged material located on the reverse side of a revised page will not contain an amendment identification number or amendment bars.The following page removals and insertions should be made to incorporate Amendment No.18 into the FSAR: REMOVE EXISTING PAGES INSERT REPLACEMENT PAGES VOLUME 1 EPPECTIVE PAGE LIST: VOLUME 1 EPL-93/EPL-94 through EPL-99/EPL-99a EPL-93/EPL-94 through EPL-99/EPL-99a CHAPTER 9 CHAPTER 9 9.5.1-5/9.5.1-6 through 9.5.1-9/9.5.1-10 9.5.1-5/9.5.1-6 through 9.5.1-9/9.5.1-10 9.5.1-27/9.5.1-28 9.5.1-29/9.5.1-30 9.5.1-33/9.5.1-34 9.5.1-35/9/5/1-36 9.5.1-39/9.5.1-40 through 9.5.1-43/9.5.1-44 9.5.1-27/9.5.1-28 9.5.1-29/9.5.1-30 9.5.1-33/9.5.1-34 9.5.1-35/9.5.1-36 9.5.1-39/9.5.1-40 through 9~5~1-44a Amendment No.18 SHMPP FSAR REMOVE EXISTING PAGES INSERT REPLACEMENT PAGES 9.5.1-54 9.5.1-71 9.5.1-54 9.5.1-71 APPENDIX 9~5A 1./iX 9.5A-1/9'A-2 through 9.5A-7/9.5A-8 9.5A-21/9.5A-22 9.5A-25/9.5A-26 9.5A-27/9.5A-28 through 9.5A-33/9.5A-34 9.5A-62/9.5A-63 9.5A-67/9.5A-68 9.5A-72/9.5A-73 9.5A-77/9.5A-78 9.5A-79/9.5A-80 9.5A-84/9.5A-85 9.5A-90/9.5A-91 9.5A-96/9.5A-97 through 9.5A-100/9.5A-101 9.5A-106/9.5A-107 9.5A-117/9.5A-118 9.5A-119/9.5A-120 9.5A-125/9'A-126 9.5A-127/9.5A-128 9.5A-132/9.5A-133 9.5A-134/9.5A-135 9.5A-143/9.5A-144 9.5A-145/9.5A-146 9.5A-154/9'A-155 9.5A-156/9.5A-157 9'A-162/9'A-163 through 9.5A-166/9.5A-167 APPENDIX 9~5A~/xx 9.5A-1/9.5A-2 through 9'A-7/9.5A-8 9.5A-21/9.5A-22 9.5A-25/9.5A-26 9.5A-26a 9.5A-27/9.5A-28 through 9.5A-33/9.5A-34 9.5A-62/9.5A-63 9.5A-67/9.5A-68 9.5A-72/9.5A-73 9.5A-77/9.5A-78 9.5A-79/9.5A-80 9.5A-84/9'A-85 9,.5A-90/9.5A-91 9.5A-96/9.5A-97 through 9.5A-100/9.5A-101 9'A-106/9'A-107 9.5A-117/9.5A-118 9.5A-119/9.5A-120 9.5A-125/9'A-'126 9.5A-127/9.5A-128 9.5A-132/9.5A-133 9.5A-134/9'A-135 9.5A-143/9.5A-144 9.5A-145/9'A-146 9.5A-154/9.5A-155 9.5A-156/9.5A-157 9.5A-162/9'A-163 through 9'A-166/9.5A>>167 Amendment No.18 SHNPP FSAR REM0VE EXISTING PAGES INSERT REPLACEMENT PAGES 9'A-178/9'A-179 9.5A-184/9.5A-185 9.5A-189/9.5A-190 9.5A-192/9.5A-193 9.5A-197/9.5A-198 through 9.5A-211/9.5A-212 I 9.5A-221/9.5A-222 9.5A-223/9.5A-224 9.5A-178/9.5A-179 9.5A-184/9.5A-185 9.5A-189/9.5A-190 9.5A-192/9.5A-193 9.5A-197/9.5A-198 through 9.5A-211/9.5A-212 9.5A-221/9.5A-222 9.5A-223/9.5A-224 9.5A-224a Amendment No.18}}
 
Carolina Power & Light Company (CP&L) hereby transmits three originals and sixty (60) copies of Amendment No. 18 to the Shearon Harris Nuclear Power Plant (SHNPP) Final Safety Analysis Report (FSAR).
This amendment revises tables and discussions concerning combustible loading in FSAR Section 9.5.1. A draft version of this material was sent by letter dated October 10, 1984.
Each  revised page bears the amendment number. Technical changes are noted by vertical  bars in the page margins. Instructions for entering the revised pages are also included.
If  you have any questions concerning        this  amendment staff at please contact Ms. Carol Love of our Nuclear Licensing Section                        (919) 836-8166.
Yours very        tr    y, A. B. Cutter  Vice President Nuclear Engineering          &  Licensing CGL/cfr (829CGL)
Enclosures Ccl    Mr. B. C. Buckley (NRC)                            Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)                     Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII)                        Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)                          Mr. G. 0. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)                    Dr. J. H. Carpenter (ASLB)
Chapel Hill Public Library                        Mr. J. L. Kelley (ASLB)
Wake County Public Library A. B. Cutter, having been    first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light Company.                                                                                         IIII44444pl
                                                              ~
                                                                ~                    ea                        '.('tary My  commission expires: 8'/lp/N                                                                    NOTARY'..
Its a$
                                                                                                      ~~B jlC 8412060237 841130 PDR ADOCK 05000400                  Street o P. 0. Box 1551    Raleigh. N; C. 27602 Ip                          m PDR,
                                                                                                    'IlllllllllIIII' K
 
0    4 E.
l' h
A I
g$ p D
I Yi        ly.
A, y-<q
 
CPKL Carolina Power 5 Light Company                                              SERIAL:  NLS-84-470 Nov 3O 19S4 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC    20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1   DOCKET NO. 50-400 AMENDMENT NO. 18 TO FSAR FIRE PROTECTION
 
==Dear Mr. Denton:==
 
Carolina Power  6 Light Company (CP6L) hereby transmits three originals and sixty (60) copies of      Amendment No. 18 to the Shearon Harris Nuclear Power Plant  (SHNPP)  Final Safety Analysis Report (FSAR).
This amendment revises tables and discussions concerning combustible loading in FSAR Section 9.5.1. A draft version of this material was sent by letter dated October 10, 1984.
Each  revised page bears the amendment number. Technical changes .are noted by vertical  bars in the page margins. Instructions for entering the revised pages are also included.
If  you have any questions concerning                this        amendment staff at (919[
please contact Ms. Carol Love of our Nuclear Licensing Section                                                            836-8166.
I tr ly,
                                                                                                /: '.
Yours,very A.
                                                                          ~~      (r r d.'irV/ee B. Cutter                          Bres1deet Nuclear Engineering                          &  Licensing CGL/cfr (829CGL)
Enclosures CC:    Mr. B. C. Buckley (NRC)                                          Mr. Wells Fddleman Mr. G. F. Maxwell (NRC-SHNPP)                                    Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII)                                      Dr. Richard D. Wilson Mr. Travis Payne (KUDZU)                                          Mre G. 0. Bright (ASLB)
Mr. Daniel F. Read (CHANGE/ELP)                                    Dr. J. H. Carpenter (ASLB)
Chapel Hill Public Library                                        Mr. J. L. Kelley (ASLB)
Wake County Public Library A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 6 Light ~>>>'                                                            ~"d.;,
Company.
otary                a My  commission expires: D/>8/Bf                                                                                              e
                                                                                                                              'UOUC 41 1 Fayettevrtte Street ~ P. O. 8ox 1$ 51        ~    ftateigrr. N, C. 27602 s'rtssrlftts'v vill &lr& lt r                "rrrttttit'B g pl+ +//g gjl<lB Q+pi+ $'$l su~srl+rtstshgvetrlrslesrtrtrla
                        %l
 
SHNPP PSAR CAROLINA POWER 6 LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 FINAL  SAFETY ANALYSIS REPORT  AMENDMENT NO.       18 INSTRUCTION SHEET This amendment contains additional or revised technical information and editorial changes in the form of replacement pages for the SHNPP FSAR.
Each revised page bears the notation "Amendment No. 18" at the page bottom.
Vertical bars with the number "18" beside them have been placed in the margins of revised pages to indicate the location of technical revisions on the page.
Since many SHNPP FSAR pages are printed double-sided, the replacement pages in this amendment may consist of original information on one side of the page and revised information on the other side. Reference to the amendment identification number in the lower right corner of the page will enable the user to determine the amendment status of the page (whether              it is original or revised material). Unchanged material located on the reverse side of  a revised page      will not  contain an amendment  identification    number or amendment bars.
The following page removals and insertions should be made            to incorporate    Amendment No. 18 into the FSAR:
REMOVE                                              INSERT EXISTING PAGES                                      REPLACEMENT PAGES VOLUME 1                                            VOLUME 1 EPPECTIVE PAGE      LIST:
EPL-93 / EPL-94 through                              EPL-93 / EPL-94 through EPL-99 / EPL-99a                                    EPL-99 / EPL-99a CHAPTER 9                                            CHAPTER 9 9.5.1-/ 9.5.1-6                                  9.5.1-5    / 9.5.1-6 through                                              through 9.5.1-/   9.5.1-10                              9.5.1-9 / 9.5.1-10 9.5.1-27    / 9.5.1-28                              9.5.1-27 / 9.5.1-28 9.5.1-29    / 9.5.1-30                              9.5.1-29 / 9.5.1-30 9.5.1-33    / 9.5.1-34                              9.5.1-33 / 9.5.1-34 9.5.1-35    / 9/5/1-36                              9.5.1-35 / 9.5.1-36 9.5.1-39    / 9.5.1-40                              9.5.1-39 / 9.5.1-40 through                                              through 9.5.1-43    / 9.5.1-44                                  9~5 ~ 1-44a Amendment No. 18
 
SHMPP FSAR REMOVE                              INSERT EXISTING PAGES                    REPLACEMENT PAGES 9.5.1-54                            9.5.1-54 9.5.1-71                            9.5.1-71 APPENDIX 9~5A                      APPENDIX 9 ~ 5A 1./iX                              ~  /  xx 9.5A-/ 9 'A-2                  9.5A-1    / 9.5A-2 through                              through 9.5A-7 / 9.5A-8                    9 'A-7 / 9.5A-8 9.5A-21  / 9.5A-22                9.5A-21 / 9.5A-22 9.5A-25  / 9.5A-26                9.5A-25 / 9.5A-26 9.5A-26a 9.5A-27  / 9.5A-28                9.5A-27 / 9.5A-28 through                              through 9.5A-33 / 9.5A-34                  9.5A-33 / 9.5A-34 9.5A-62  / 9.5A-63                9.5A-62    /   9.5A-63 9.5A-67  / 9.5A-68                9.5A-67    /   9.5A-68 9.5A-72  / 9.5A-73                9.5A-72    /   9.5A-73 9.5A-77  / 9.5A-78                9.5A-77    /   9.5A-78 9.5A-79  / 9.5A-80                9.5A-79    /   9.5A-80 9.5A-84  / 9.5A-85                9.5A-84    / 9 'A-85 9.5A-90  / 9.5A-91                9,.5A-90 / 9.5A-91 9.5A-96 / 9.5A-97                  9.5A-96 / 9.5A-97 through                              through 9.5A-100 / 9.5A-101                9.5A-100 / 9.5A-101 9.5A-106    / 9.5A-107              9 'A-106 / 9 'A-107 9.5A-117    / 9.5A-118              9.5A-117 / 9.5A-118 9.5A-119    / 9.5A-120              9.5A-119    /  9.5A-120 9.5A-125    / 9 'A-126              9.5A-125    / 9 'A-'126 9.5A-127    / 9.5A-128              9.5A-127    / 9.5A-128 9.5A-132    / 9.5A-133              9.5A-132    / 9.5A-133 9.5A-134    / 9.5A-135              9.5A-134    / 9 'A-135 9.5A-143    / 9.5A-144              9.5A-143    / 9.5A-144 9.5A-145    / 9.5A-146              9.5A-145    / 9 'A-146 9.5A-154    / 9 'A-155              9.5A-154    / 9.5A-155 9.5A-156    / 9.5A-157              9.5A-156    / 9.5A-157 9 'A-162 / 9 'A-163                9.5A-162 / 9 'A-163 through                              through 9.5A-166 / 9.5A-167                9 'A-166 / 9.5A>>167 Amendment No. 18
 
SHNPP FSAR REM0VE                            INSERT EXISTING PAGES                    REPLACEMENT PAGES 9 'A-178 /  9 'A-179              9.5A-178  /  9.5A-179 9.5A-184  / 9.5A-185              9.5A-184  / 9.5A-185 9.5A-189  / 9.5A-190              9.5A-189  /  9.5A-190 9.5A-192  / 9.5A-193              9.5A-192  / 9.5A-193 9.5A-197  / 9.5A-198              9.5A-197  / 9.5A-198 through                            through 9.5A-211  / 9.5A-212              9.5A-211 / 9.5A-212 I
9.5A-221  / 9.5A-222              9.5A-221 / 9.5A-222 9.5A-223  / 9.5A-224              9.5A-223 / 9.5A-224 9.5A-224a Amendment No. 18}}

Latest revision as of 19:29, 3 February 2020

Forwards Amend 18 to FSAR for Shearon Harris Unit 1.Amend Revises Fire Protection Tables & Discussions Re Combustible Loading
ML18018B825
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1984
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18018B826 List:
References
NLS-84-470, NUDOCS 8412060237
Download: ML18018B825 (9)


Text

REGULATOR'r INPORMATION DISTRIBUTION SYSTEM (RIBS)

ACCESSION NBR;8412060237 DOC,DATE: 84/11/30 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Planti Unit 1< Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION CUTTERiA ~ B, Carolina Power L Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationg Director

SUBJECT:

Forwards Amend 18 to FSAR for Shearon Harris Unit 'mend 1 revise . e protection tables 8 discus ions re combustible MP>

p DISTRIBUTION CO . B001D COPIE REC IV: R &+I3~

TITLE: Li censing Submittal: PSAR/FSAR Amd L Related Correspondence NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL. ID CODE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR LB3 BC 1 0 NRR LB3 LA 1 0 BUCKLEYiB 01 1 1 INTERNAL: ACRS 6 6 ADM/LFMB 1 0 ELD/HDS1 1 0 IE F ILE 1, 1 IE/DEPER/EPB 36 1 1 IE/DEPER/IRB 35 1 1 IE/DOASIP/QAB21 1 1 NRR ROEiM ~ L 1 1 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EHEB- 1 1 NRR/DE/EGB 13 2 2 NRR/DE/GB 28 2 2 NRR/DF/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SGEB 25 1 1 NRR/DHFS/HFEBPO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 0 NRR/DS I/AEB 26 1 1 NRR/DS I/ASB 1 1 NRR/DS I/CPB 10 1 I/I

~

NRR/DSI/CSB 09 1 1 NRR/DS CSB 16 1 1 NRR/DSI/METB 12 1 1 NRR/DS I/PSB 19 1 NRR I/RAB 22 1 1 NRR/DS I/RSB 23 1 1 04 1 1 RGN2 3 3 MIB 1 0 EXTERNALS BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS)

FEMA-REP DIV 39 1 1 LPDR 03 NRC PDR 02 1 1 NSIC 05 NTIS 1 PNL GRUELgR TOTAL NUMBER OF COPIES REQUIRED: LTTR 50 ENCL 06

~ . ~

'/

k J

~

I(

CNK Carolina Power 8 Light Company SERIAL: NLS-84-470 NOV 30 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400 AMENDMENT NO. 18 TO FSAR FIRE PROTECTION

Dear Mr. Denton:

Carolina Power & Light Company (CP&L) hereby transmits three originals and sixty (60) copies of Amendment No. 18 to the Shearon Harris Nuclear Power Plant (SHNPP) Final Safety Analysis Report (FSAR).

This amendment revises tables and discussions concerning combustible loading in FSAR Section 9.5.1. A draft version of this material was sent by letter dated October 10, 1984.

Each revised page bears the amendment number. Technical changes are noted by vertical bars in the page margins. Instructions for entering the revised pages are also included.

If you have any questions concerning this amendment staff at please contact Ms. Carol Love of our Nuclear Licensing Section (919) 836-8166.

Yours very tr y, A. B. Cutter Vice President Nuclear Engineering & Licensing CGL/cfr (829CGL)

Enclosures Ccl Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Mr. J. P. O'Reilly (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. 0. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Chapel Hill Public Library Mr. J. L. Kelley (ASLB)

Wake County Public Library A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light Company. IIII44444pl

~

~ ea '.('tary My commission expires: 8'/lp/N NOTARY'..

Its a$

~~B jlC 8412060237 841130 PDR ADOCK 05000400 Street o P. 0. Box 1551 Raleigh. N; C. 27602 Ip m PDR,

'IlllllllllIIII' K

0 4 E.

l' h

A I

g$ p D

I Yi ly.

A, y->>' ~"d.;,

Company.

otary a My commission expires: D/>8/Bf e

'UOUC 41 1 Fayettevrtte Street ~ P. O. 8ox 1$ 51 ~ ftateigrr. N, C. 27602 s'rtssrlftts'v vill &lr& lt r "rrrttttit'B g pl+ +//g gjl<lB Q+pi+ $'$l su~srl+rtstshgvetrlrslesrtrtrla

%l

SHNPP PSAR CAROLINA POWER 6 LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 FINAL SAFETY ANALYSIS REPORT AMENDMENT NO. 18 INSTRUCTION SHEET This amendment contains additional or revised technical information and editorial changes in the form of replacement pages for the SHNPP FSAR.

Each revised page bears the notation "Amendment No. 18" at the page bottom.

Vertical bars with the number "18" beside them have been placed in the margins of revised pages to indicate the location of technical revisions on the page.

Since many SHNPP FSAR pages are printed double-sided, the replacement pages in this amendment may consist of original information on one side of the page and revised information on the other side. Reference to the amendment identification number in the lower right corner of the page will enable the user to determine the amendment status of the page (whether it is original or revised material). Unchanged material located on the reverse side of a revised page will not contain an amendment identification number or amendment bars.

The following page removals and insertions should be made to incorporate Amendment No. 18 into the FSAR:

REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES VOLUME 1 VOLUME 1 EPPECTIVE PAGE LIST:

EPL-93 / EPL-94 through EPL-93 / EPL-94 through EPL-99 / EPL-99a EPL-99 / EPL-99a CHAPTER 9 CHAPTER 9 9.5.1-5 / 9.5.1-6 9.5.1-5 / 9.5.1-6 through through 9.5.1-9 / 9.5.1-10 9.5.1-9 / 9.5.1-10 9.5.1-27 / 9.5.1-28 9.5.1-27 / 9.5.1-28 9.5.1-29 / 9.5.1-30 9.5.1-29 / 9.5.1-30 9.5.1-33 / 9.5.1-34 9.5.1-33 / 9.5.1-34 9.5.1-35 / 9/5/1-36 9.5.1-35 / 9.5.1-36 9.5.1-39 / 9.5.1-40 9.5.1-39 / 9.5.1-40 through through 9.5.1-43 / 9.5.1-44 9~5 ~ 1-44a Amendment No. 18

SHMPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 9.5.1-54 9.5.1-54 9.5.1-71 9.5.1-71 APPENDIX 9~5A APPENDIX 9 ~ 5A 1./iX ~ / xx 9.5A-1 / 9 'A-2 9.5A-1 / 9.5A-2 through through 9.5A-7 / 9.5A-8 9 'A-7 / 9.5A-8 9.5A-21 / 9.5A-22 9.5A-21 / 9.5A-22 9.5A-25 / 9.5A-26 9.5A-25 / 9.5A-26 9.5A-26a 9.5A-27 / 9.5A-28 9.5A-27 / 9.5A-28 through through 9.5A-33 / 9.5A-34 9.5A-33 / 9.5A-34 9.5A-62 / 9.5A-63 9.5A-62 / 9.5A-63 9.5A-67 / 9.5A-68 9.5A-67 / 9.5A-68 9.5A-72 / 9.5A-73 9.5A-72 / 9.5A-73 9.5A-77 / 9.5A-78 9.5A-77 / 9.5A-78 9.5A-79 / 9.5A-80 9.5A-79 / 9.5A-80 9.5A-84 / 9.5A-85 9.5A-84 / 9 'A-85 9.5A-90 / 9.5A-91 9,.5A-90 / 9.5A-91 9.5A-96 / 9.5A-97 9.5A-96 / 9.5A-97 through through 9.5A-100 / 9.5A-101 9.5A-100 / 9.5A-101 9.5A-106 / 9.5A-107 9 'A-106 / 9 'A-107 9.5A-117 / 9.5A-118 9.5A-117 / 9.5A-118 9.5A-119 / 9.5A-120 9.5A-119 / 9.5A-120 9.5A-125 / 9 'A-126 9.5A-125 / 9 'A-'126 9.5A-127 / 9.5A-128 9.5A-127 / 9.5A-128 9.5A-132 / 9.5A-133 9.5A-132 / 9.5A-133 9.5A-134 / 9.5A-135 9.5A-134 / 9 'A-135 9.5A-143 / 9.5A-144 9.5A-143 / 9.5A-144 9.5A-145 / 9.5A-146 9.5A-145 / 9 'A-146 9.5A-154 / 9 'A-155 9.5A-154 / 9.5A-155 9.5A-156 / 9.5A-157 9.5A-156 / 9.5A-157 9 'A-162 / 9 'A-163 9.5A-162 / 9 'A-163 through through 9.5A-166 / 9.5A-167 9 'A-166 / 9.5A>>167 Amendment No. 18

SHNPP FSAR REM0VE INSERT EXISTING PAGES REPLACEMENT PAGES 9 'A-178 / 9 'A-179 9.5A-178 / 9.5A-179 9.5A-184 / 9.5A-185 9.5A-184 / 9.5A-185 9.5A-189 / 9.5A-190 9.5A-189 / 9.5A-190 9.5A-192 / 9.5A-193 9.5A-192 / 9.5A-193 9.5A-197 / 9.5A-198 9.5A-197 / 9.5A-198 through through 9.5A-211 / 9.5A-212 9.5A-211 / 9.5A-212 I

9.5A-221 / 9.5A-222 9.5A-221 / 9.5A-222 9.5A-223 / 9.5A-224 9.5A-223 / 9.5A-224 9.5A-224a Amendment No. 18