ML19256F290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. e
{{#Wiki_filter:. e OPERATING DATA REPORT DOCKET NO. 50-366 DATE 12-10-79 C051PLETED BY G      L. Johnson TELEPHONE 912-367-7781 OPERATING STATUS Hatch  2                                        Notes
.
OPERATING DATA REPORT DOCKET NO. 50-366 DATE 12-10-79 C051PLETED BY G      L. Johnson TELEPHONE 912-367-7781 OPERATING STATUS Hatch  2                                        Notes
: 1. Unit N2me:
: 1. Unit N2me:
: 2. Reporting Period:          November 1979
: 2. Reporting Period:          November 1979
Line 30: Line 28:
: 10. Reasons For Restrictions.!f Any:
: 10. Reasons For Restrictions.!f Any:
(..,                                                                                                                            '
(..,                                                                                                                            '
  -
This 5fonth          Yr..to Date        Cumulatis e
This 5fonth          Yr..to Date        Cumulatis e
           !!. Hours In Reporting Period                                  720              2089                2089
           !!. Hours In Reporting Period                                  720              2089                2089
Line 43: Line 40:
: 20. Unit Asailability Factor                                    84.4                80.0                80.0
: 20. Unit Asailability Factor                                    84.4                80.0                80.0
: 21. Unit Capacity Factor IUsin; 5tDC Net)                      81.3                74.7                74.7
: 21. Unit Capacity Factor IUsin; 5tDC Net)                      81.3                74.7                74.7
: 22. Unit Capau.. Factor (Using DER Net)
: 22. Unit Capau.. Factor (Using DER Net) 77.7                71.3                71.3
                            .
77.7                71.3                71.3
: 23. Unit Forced Outage Rate                                      4.5                14.6                14.6
: 23. Unit Forced Outage Rate                                      4.5                14.6                14.6
: 24. Shutdowns Scheduled Oser Nest 6 5tonths (Type. Date.and Duration of Each):
: 24. Shutdowns Scheduled Oser Nest 6 5tonths (Type. Date.and Duration of Each):
__.
: 25. If Shut Down At End Of Repoit Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Repoit Period. Estimated Date of Startup:
il Oti. Units in Test Status (Prior to Commercia(_O    eration):                Forecast            Achiesed
il Oti. Units in Test Status (Prior to Commercia(_O    eration):                Forecast            Achiesed INITI AL CRITICALITY
      .
{'                                INITIAL ELECTRICITY C0\t\tERCl A L OPER ATION 1608 274g9121soQ(                        ,-
INITI AL CRITICALITY
{'                                INITIAL ELECTRICITY C0\t\tERCl A L OPER ATION
                                                                  .                                    ,
1608 274g9121soQ(                        ,-


    .
AVERAGE DAILY UNIT POWER LEVEL
AVERAGE DAILY UNIT POWER LEVEL
                                                        .
(~
(~
DOCKET NO.        50-366 UNIT - Hatch 2 DATE 12-10-79 CO\1PLETED BY G. L. Johnson TELEPHONE 912-367-7781 Sion s tt      ilovember DAY        AVERAGE D IL          YER LEVEL                  DAY      AVERAGE DAILY POWER LEVEL (Sth e-Net)
DOCKET NO.        50-366 UNIT - Hatch 2 DATE 12-10-79 CO\1PLETED BY G. L. Johnson TELEPHONE 912-367-7781 Sion s tt      ilovember DAY        AVERAGE D IL          YER LEVEL                  DAY      AVERAGE DAILY POWER LEVEL (Sth e-Net)
:                  788                                                        724 17 2                    716                                  ,g                      44 3                      -8                                  i9                    658 4                    -11                                                        753 20 398 5                                                          ::                    768 690                                                        793 6                                                          ::
:                  788                                                        724 17 2                    716                                  ,g                      44 3                      -8                                  i9                    658 4                    -11                                                        753 20 398 5                                                          ::                    768 690                                                        793 6                                                          ::
7                    789                                                        778 23 g                    796                                                        746 24 9                    668                                                        783 25 10                      -9                                  26                    790 i                  442                                                        796.
7                    789                                                        778 23 g                    796                                                        746 24 9                    668                                                        783 25 10                      -9                                  26                    790 i                  442                                                        796.
27 12 734                                                        791 13                    762                                                        800 29 14                    238                                                        804 3o 15                    489                                  3, 16                    757 INSTRUCT!nNe
27 12 734                                                        791 13                    762                                                        800 29 14                    238                                                        804 3o 15                    489                                  3, 16                    757 INSTRUCT!nNe On this format list the average duly unit power leselin MWe Net for each day in the reportag month. Compute to the nearest whole megawatt.                y .
_
On this format list the average duly unit power leselin MWe Net for each day in the reportag month. Compute to the nearest whole megawatt.                y .
:8
:8
   /                                                                                                            (9/77
   /                                                                                                            (9/77 1608 275
                                                            . ..
1608 275


                                                                                                                                            '
gg gDC"        C s                                              .
gg gDC"        C s                                              .
r 1                                      -'            . e G
r 1                                      -'            . e G
                                                                                                                    -
n8                                        nt            e  t o7                                        el          .c      r                          E 6
n8                                        nt            e  t o7                                        el          .c      r                          E 6
6 9 h 7
6 9 h 7
                  -
s7 n -
s7 n -
o6 J3 7
o6 J3 7
Line 101: Line 82:
p    S      st        Dr      i            Inoitatse tso                          S a
p    S      st        Dr      i            Inoitatse tso                          S a
N\                                  cu    o    M      o              e                  -
N\                                  cu    o    M      o              e                  -
AAD O          !      ron CoiR  e        n          l r        ft        r          Gah r e p e                    I
AAD O          !      ron CoiR  e        n          l r        ft        r          Gah r e p e                    I T
                                                                                                                                          -
E Nn Tr          El                      i        o    ce        or    i            t      pSR                          it K T                        &t ct                  t          w          e    a          i e                    )
T E Nn Tr          El                      i        o    ce        or    i            t      pSR                          it K T                        &t ct                  t          w          e    a          i e                    )
ib E E b r yt I
ib E E b r yt I
eAn e          oe          Vo          sv      p          ipr n1 CN            L L          s v  t v      e  I p        sn      e          h x ro tnv1        e6                  h s
eAn e          oe          Vo          sv      p          ipr n1 CN            L L          s v  t v      e  I p        sn      e          h x ro tnv1        e6                  h s
OU            P E          u                  l    u  S          oi      r a        e                                                EfEE0                                  E D              MT          C          e    ee    d    Mf        L P      uV              o        I    o O                          d                            C    t C                                n                                  4                                      5 no wi
OU            P E          u                  l    u  S          oi      r a        e                                                EfEE0                                  E D              MT          C          e    ee    d    Mf        L P      uV              o        I    o O                          d                            C    t C                                n                                  4                                      5 no wi m
:
a
m a
: s ms ao        a
: s ms ao        a
: P mL      n w
: P mL      n w
                                                                                        .                                                              -
r              rg M
r              rg M
ot          rl                  o da        c    c          cn    d tl      S    S ys      Si      t uo              rs        k    u  -
ot          rl                  o da        c    c          cn    d tl      S    S ys      Si      t uo              rs        k    u  -
Line 128: Line 106:
X mci
X mci
                                                                                                                 .r aSl a m
                                                                                                                 .r aSl a m
                                                                                                                      .
a )n U
a )n U
U D
U D
Line 152: Line 129:
0 W
0 W
O P
O P
N                      C      l I    C          E      C            M1234
N                      C      l I    C          E      C            M1234 0
                                                                                                                                      .
D N
0 D
A I
N A
D N
I D
3
N 3
                                                                                                                                             . 1 S                O        e        #
                                                                                                                                             . 1 S                O        e        #
N                M        et s  nr t
N                M        et s  nr t
                                                                                                                                              ,
W                T        n e o O                R e
W                T        n e o O                R e
c  v p      A      A    A          A      A iEe          N        N    N          N      N                                          n D                O      L        R                                                                              io I                P                                                                                                t      .
c  v p      A      A    A          A      A iEe          N        N    N          N      N                                          n D                O      L        R                                                                              io I                P                                                                                                t      .
Line 185: Line 160:
1 mnnt oni(
1 mnnt oni(
pt et i
pt et i
cl ai  ata ntr
cl ai  ata ntr oninu  uif ur  geieh    nr e s q-              e e pd pt t
              .
oninu  uif ur  geieh    nr e s q-              e e pd pt t
                                       ,RH                                                        ea    F. a R R. O- A- O
                                       ,RH                                                        ea    F. a R R. O- A- O
                                                                                                                      -
                                                                                                                                           - lO S      F    F          F        S            RABCDEFGI 2
                                                                                                                                           - lO
                                                                                                                                                  -
S      F    F          F        S            RABCDEFGI 2
                        *
                      ,*
0          4        8 3      9    1          1        1 te          -        -  -          -        -
0          4        8 3      9    1          1        1 te          -        -  -          -        -
a        1      1    1          1        1 D          1      1    1          1        1 d
a        1      1    1          1        1 D          1      1    1          1        1 d
                                                    -        -  -          -        -
9      9    9          9        9                    le 7      7    7          7        7            d u ed c e 0      1    2          3      '4            FS ro !'  c
9      9    9          9        9                    le 7      7    7          7        7            d u ed c e
                    -
                                          .
0      1    2          3      '4            FS ro !'  c
                                                                                                                                                 )
                                                                                                                                                 )
t o        3      3    3          3        3              : :                                          7 N            -            -          -        -          FS                                            7
t o        3      3    3          3        3              : :                                          7 N            -            -          -        -          FS                                            7
                                                                                                                                                 /
                                                                                                                                                 /
9      9    9          9        9                                                            9 7      7    7          7        7      l                                                    1
9      9    9          9        9                                                            9 7      7    7          7        7      l                                                    1
                                                                                              -                                                ,
    .
                                                                        ,


    . ..
        .
  .
NARRATIVE REPORT UNIT 2 November 3rd                Shutdown due to inop HPCI Inboard Isolation Valve November 5th              Generator tied to line 0105 CDT November 9th                Rx Scram due to MSR high level November 10th              Generator tied to line 1037 CDT November 10th              Rx  Scram at 1124:    MSIV closed due to momentary loss of power to 4160 volt buss November 11th              Generator tied to line 0058 CDT November 14th              Rx Scram:    Loss of DC to EHC when taking LPCI out of service November 15th              Generator tied to line 2:44 November 18                Shutdown to repair inop LPCI      inverter.
NARRATIVE REPORT UNIT 2 November 3rd                Shutdown due to inop HPCI Inboard Isolation Valve November 5th              Generator tied to line 0105 CDT November 9th                Rx Scram due to MSR high level November 10th              Generator tied to line 1037 CDT November 10th              Rx  Scram at 1124:    MSIV closed due to momentary loss of power to 4160 volt buss November 11th              Generator tied to line 0058 CDT November 14th              Rx Scram:    Loss of DC to EHC when taking LPCI out of service November 15th              Generator tied to line 2:44 November 18                Shutdown to repair inop LPCI      inverter.
Generator tied to line 2221 CDT
Generator tied to line 2221 CDT
(
(
There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during the previous month of 1979
There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during the previous month of 1979
_
                                     .T i
                                     .T i
  %d
  %d O
_                      .
1608 277
O 1608 277


  '
      ,
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1979 NUMBER            DATE COMPLETED        DESCRIPTION 79-4429          11-20-79              Safety    system        variable spring inspection 79-3689          11-21-79              Repaired        HPCI          pump discharge to CST valve 79-5279          11-21-79              Repaired PSW pump 2A 79-5268          11-20-79              Investigated    and      repaired level    indications      on    Rx water level instrument rack 79-4853          11-20-79              Repaired spiking IRM "E" 79-5267          11-20-79              Repaired  level      indications on Rx water level instrum-ent rack 79-5394          11-20-79              Repaired    "A"    D/W    H2  02 analyzer 79-5495          11-20-79              Replaced blown fuses in 250 V inverter 79-5524          11-20-79              Checked liquid        R/W    radia-tion monitor 79-5489          11-20-79              Repaired    RCIC    valve    from steam inlet 79-5456          11-20-79              Adjusted "2F" APRM 79-5438          11-20-79              Repaired    primary      contain-ment    atmosphere        sampling monitor 79-4979          11-12-79              Calibrated    plant      service water instruments 79-5462          11-i5-79              Replaced backwash pressure regulator (controller) 79-5290          11-12-79              Inspected otr-gas condenser "T9-5309          11 7 9          'Bemoved    air    ' lock    strong ~~~-
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1979 NUMBER            DATE COMPLETED        DESCRIPTION 79-4429          11-20-79              Safety    system        variable spring inspection 79-3689          11-21-79              Repaired        HPCI          pump discharge to CST valve 79-5279          11-21-79              Repaired PSW pump 2A 79-5268          11-20-79              Investigated    and      repaired level    indications      on    Rx water level instrument rack 79-4853          11-20-79              Repaired spiking IRM "E" 79-5267          11-20-79              Repaired  level      indications on Rx water level instrum-ent rack 79-5394          11-20-79              Repaired    "A"    D/W    H2  02 analyzer 79-5495          11-20-79              Replaced blown fuses in 250 V inverter 79-5524          11-20-79              Checked liquid        R/W    radia-tion monitor 79-5489          11-20-79              Repaired    RCIC    valve    from steam inlet 79-5456          11-20-79              Adjusted "2F" APRM 79-5438          11-20-79              Repaired    primary      contain-ment    atmosphere        sampling monitor 79-4979          11-12-79              Calibrated    plant      service water instruments 79-5462          11-i5-79              Replaced backwash pressure regulator (controller) 79-5290          11-12-79              Inspected otr-gas condenser "T9-5309          11 7 9          'Bemoved    air    ' lock    strong ~~~-
backs
backs
                              . , -
/
/
s
s 1608 278
                                      -
1608 278


79-1373 11 g_79      Megged "B" loop jockey pumps
79-1373 11 g_79      Megged "B" loop jockey pumps
     ~
     ~
11-0-79      Inspected HPCI turbine stop valve (L
11-0-79      Inspected HPCI turbine stop valve (L
_
               .T -
               .T -
C                                      1608 279
C                                      1608 279
                    - -


  . .  .
       . 79-3259 9-4-79      Completed  piping  on  RWCU cobalt deposition loop per DCR 2-78-205 79-4920 10-16-79    Insured    that  no    ground exist on the high side of the A diesel generator 79-4921 10-16-79    Insured    that  no    ground exist on the high side of the C diesel generator 79-4550 10-17-79    Repaired LPRM 0421 B 79-3391 10-17-79    Replaced  bad  detector    in IRM 2B 79-4885 10-17-79    Replaced "A" IRM detector 79-5013 10-29-79    Repaired feedwater testable check valve 79-5029 10-28-79    Repaired RCIC steam supply isolation valve 79-5200 11-6-79    Repaired "C" RHR S/W pump 79-5027 11-6-79    Repaired PSW pump discharge check valve
       . 79-3259 9-4-79      Completed  piping  on  RWCU
-
cobalt deposition loop per DCR 2-78-205 79-4920 10-16-79    Insured    that  no    ground exist on the high side of the A diesel generator 79-4921 10-16-79    Insured    that  no    ground exist on the high side of the C diesel generator 79-4550 10-17-79    Repaired LPRM 0421 B 79-3391 10-17-79    Replaced  bad  detector    in IRM 2B 79-4885 10-17-79    Replaced "A" IRM detector 79-5013 10-29-79    Repaired feedwater testable check valve 79-5029 10-28-79    Repaired RCIC steam supply isolation valve 79-5200 11-6-79    Repaired "C" RHR S/W pump 79-5027 11-6-79    Repaired PSW pump discharge check valve
{' -
{' -
79-4950 11-7-79    Repaired  HPCI  pump water line to pump 1 (seal 79-4942 11-6-79    Repaired HPCI torus suction valve
79-4950 11-7-79    Repaired  HPCI  pump water line to pump 1 (seal 79-4942 11-6-79    Repaired HPCI torus suction valve
__
                       =
                       =
'
                          ._
1608 280}}
1608 280}}

Latest revision as of 23:16, 1 February 2020

Monthly Operating Rept for Nov 1979
ML19256F290
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/10/1979
From: Johnson G
GEORGIA POWER CO.
To:
Shared Package
ML19256F288 List:
References
NUDOCS 7912180443
Download: ML19256F290 (7)


Text

. e OPERATING DATA REPORT DOCKET NO. 50-366 DATE 12-10-79 C051PLETED BY G L. Johnson TELEPHONE 912-367-7781 OPERATING STATUS Hatch 2 Notes

1. Unit N2me:
2. Reporting Period: November 1979
3. Licensed Thermal Power (31Wt): 2436 MWt
4. Nameplate Rating (Gross Slwe): 817.0 Gross MWe
5. Design Electrical Rating (Net Siwe): 784.0 Net MWe
6. Slaximum Dependable Capacity (Gross StWe): 782.0 Gross K4e
  • >!asimum Dependable Capacity (Net 5twe): 749.0 Net MWe S. If Changes Occur in Capacity Ratings (Items Number 3 nrough 7) Since List Report.Gise Reasons:
9. Power Lese! To which Restricted. If Any (Net Slwe):
10. Reasons For Restrictions.!f Any:

(.., '

This 5fonth Yr..to Date Cumulatis e

!!. Hours In Reporting Period 720 2089 2089

12. Number Of !!ours Reactor was Critical 689.1 1919.5 1919.5
13. Reactor Resene Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 607.4 1670.6 1670.6
15. Unit Resene Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (51WH) 1385270 3700252 3700252 '

1 Gross Electrical Energy Generated (51WH) 45791 L ,_, 1223870 1223870 ,

15. Net Electrical Energy Generated (5tWH) 438341 1168520 1168520
19. Unit Senice Factor 84.4 80.0 80.0
20. Unit Asailability Factor 84.4 80.0 80.0
21. Unit Capacity Factor IUsin; 5tDC Net) 81.3 74.7 74.7
22. Unit Capau.. Factor (Using DER Net) 77.7 71.3 71.3
23. Unit Forced Outage Rate 4.5 14.6 14.6
24. Shutdowns Scheduled Oser Nest 6 5tonths (Type. Date.and Duration of Each):
25. If Shut Down At End Of Repoit Period. Estimated Date of Startup:

il Oti. Units in Test Status (Prior to Commercia(_O eration): Forecast Achiesed INITI AL CRITICALITY

{' INITIAL ELECTRICITY C0\t\tERCl A L OPER ATION 1608 274g9121soQ( ,-

AVERAGE DAILY UNIT POWER LEVEL

(~

DOCKET NO. 50-366 UNIT - Hatch 2 DATE 12-10-79 CO\1PLETED BY G. L. Johnson TELEPHONE 912-367-7781 Sion s tt ilovember DAY AVERAGE D IL YER LEVEL DAY AVERAGE DAILY POWER LEVEL (Sth e-Net)

788 724 17 2 716 ,g 44 3 -8 i9 658 4 -11 753 20 398 5  :: 768 690 793 6  ::

7 789 778 23 g 796 746 24 9 668 783 25 10 -9 26 790 i 442 796.

27 12 734 791 13 762 800 29 14 238 804 3o 15 489 3, 16 757 INSTRUCT!nNe On this format list the average duly unit power leselin MWe Net for each day in the reportag month. Compute to the nearest whole megawatt. y .

8

/ (9/77 1608 275

gg gDC" C s .

r 1 -' . e G

n8 nt e t o7 el .c r E 6

6 9 h 7

s7 n -

o6 J3 7

d b

r a

o l

e v

e mo ov m

o6 0

ni ev hr wes i e

v n

e e R

U N

(

o 0 - n L t1 C I s e li s e

- 1 . 2 I 4 hf C no2:ae nF c r

0 2 L1 h e E o P c 1 u 5 2 1 .

9 I C i g ue dh ot L iDiR tc fI S o

e e u E l G iy c lP l

l t t u p la orol- e n l d o o s nf{ n tc e R eo C n i Ot.EEYE TUN e

r tor r

p S st Dr i Inoitatse tso S a

N\ cu o M o e -

AAD O  ! ron CoiR e n l r ft r Gah r e p e I T

E Nn Tr El i o ce or i t pSR it K T &t ct t w e a i e )

ib E E b r yt I

eAn e oe Vo sv p ipr n1 CN L L s v t v e I p sn e h x ro tnv1 e6 h s

OU P E u l u S oi r a e EfEE0 E D MT C e ee d Mf L P uV o I o O d C t C n 4 5 no wi m

a

s ms ao a
P mL n w

r rg M

ot rl o da c c cn d tl S S ys Si t uo rs k u -

h s x xau xa h SI R Rtb Rt S S

N O

I T

C

,3u gg H

C X

H C

X X

E V

'X R

O l

l C

X mci

.r aSl a m

a )n U

U D

E R

R E

b r

e m

e v

o hgOm E

T l

f B

E T

l i

J L

A V

D T

O M

C E

T l

l B

.ll donnt h at 1aut r

cixc StaE a a m (r uu oeh te44 A O-p L

0 W

O P

N C l I C E C M1234 0

D N

A I

D N

3

. 1 S O e #

N M et s nr t

W T n e o O R e

c v p A A A A A iEe N N N N N n D O L R io I P t .

E a UI R n I

S im a

T I L 5gd x N " E U Asg 1 3 3 3 1

)

n e s

)

ia n yj lp n

e ia x ic lp E nL o x E

(t i&

3s$ B A A . A B er e uT s tc i;g r

n

(

r o

lf tsi r) iao e ner n

,F e RivEi ai r :a g ji E 6 7 6 2 8 t c nn yT a t la p gr nx

$,5y ea or r oE t 8

4 2

1 3

1 9

1 8

1 mnnt oni(

pt et i

cl ai ata ntr oninu uif ur geieh nr e s q- e e pd pt t

,RH ea F. a R R. O- A- O

- lO S F F F S RABCDEFGI 2

0 4 8 3 9 1 1 1 te - - - - -

a 1 1 1 1 1 D 1 1 1 1 1 d

9 9 9 9 9 le 7 7 7 7 7 d u ed c e 0 1 2 3 '4 FS ro !' c

)

t o 3 3 3 3 3  : : 7 N - - - - FS 7

/

9 9 9 9 9 9 7 7 7 7 7 l 1

NARRATIVE REPORT UNIT 2 November 3rd Shutdown due to inop HPCI Inboard Isolation Valve November 5th Generator tied to line 0105 CDT November 9th Rx Scram due to MSR high level November 10th Generator tied to line 1037 CDT November 10th Rx Scram at 1124: MSIV closed due to momentary loss of power to 4160 volt buss November 11th Generator tied to line 0058 CDT November 14th Rx Scram: Loss of DC to EHC when taking LPCI out of service November 15th Generator tied to line 2:44 November 18 Shutdown to repair inop LPCI inverter.

Generator tied to line 2221 CDT

(

There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual values during the previous month of 1979

.T i

%d O

1608 277

HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR OCTOBER 1979 NUMBER DATE COMPLETED DESCRIPTION 79-4429 11-20-79 Safety system variable spring inspection 79-3689 11-21-79 Repaired HPCI pump discharge to CST valve 79-5279 11-21-79 Repaired PSW pump 2A 79-5268 11-20-79 Investigated and repaired level indications on Rx water level instrument rack 79-4853 11-20-79 Repaired spiking IRM "E" 79-5267 11-20-79 Repaired level indications on Rx water level instrum-ent rack 79-5394 11-20-79 Repaired "A" D/W H2 02 analyzer 79-5495 11-20-79 Replaced blown fuses in 250 V inverter 79-5524 11-20-79 Checked liquid R/W radia-tion monitor 79-5489 11-20-79 Repaired RCIC valve from steam inlet 79-5456 11-20-79 Adjusted "2F" APRM 79-5438 11-20-79 Repaired primary contain-ment atmosphere sampling monitor 79-4979 11-12-79 Calibrated plant service water instruments 79-5462 11-i5-79 Replaced backwash pressure regulator (controller) 79-5290 11-12-79 Inspected otr-gas condenser "T9-5309 11 7 9 'Bemoved air ' lock strong ~~~-

backs

/

s 1608 278

79-1373 11 g_79 Megged "B" loop jockey pumps

~

11-0-79 Inspected HPCI turbine stop valve (L

.T -

C 1608 279

. 79-3259 9-4-79 Completed piping on RWCU cobalt deposition loop per DCR 2-78-205 79-4920 10-16-79 Insured that no ground exist on the high side of the A diesel generator 79-4921 10-16-79 Insured that no ground exist on the high side of the C diesel generator 79-4550 10-17-79 Repaired LPRM 0421 B 79-3391 10-17-79 Replaced bad detector in IRM 2B 79-4885 10-17-79 Replaced "A" IRM detector 79-5013 10-29-79 Repaired feedwater testable check valve 79-5029 10-28-79 Repaired RCIC steam supply isolation valve 79-5200 11-6-79 Repaired "C" RHR S/W pump 79-5027 11-6-79 Repaired PSW pump discharge check valve

{' -

79-4950 11-7-79 Repaired HPCI pump water line to pump 1 (seal 79-4942 11-6-79 Repaired HPCI torus suction valve

=

1608 280