ML19269E542: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
    ,
          -
  ._....
MORTHEAST tmLMES 1                      N",[                                              CONNECTICUT 08101 i  'ia    =====
MORTHEAST tmLMES 1                      N",[                                              CONNECTICUT 08101 i  'ia    =====
.
June 22,1979 MP 4054 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement                                                    .
June 22,1979 MP 4054 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement                                                    .
U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Line 32: Line 28:


This letter forwards Licensee Event Peport 79-13/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode pemitted by a limiting condition for operation. An additional three copies of the report are enclosed.
This letter forwards Licensee Event Peport 79-13/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode pemitted by a limiting condition for operation. An additional three copies of the report are enclosed.
Yours truly, p.guAkk J. F. Opeka
Yours truly, p.guAkk J. F. Opeka Station Superintendent Millstone Nuclear Power Station JF0/RB:lla
                                                                                  ,
Station Superintendent Millstone Nuclear Power Station JF0/RB:lla


==Attachment:==
==Attachment:==

Latest revision as of 18:51, 1 February 2020

Forwards LER-79-013/03L-0
ML19269E542
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/22/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19269E544 List:
References
MP-2-4054, NUDOCS 7906290260
Download: ML19269E542 (1)


Text

-

MORTHEAST tmLMES 1 N",[ CONNECTICUT 08101 i 'ia =====

June 22,1979 MP 4054 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement .

U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License No. OPR-65 Docket No. 50-336 Reportable Occurrence R0-50-336/79-13/3L-0 -

Dear Mr. Grier:

This letter forwards Licensee Event Peport 79-13/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode pemitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours truly, p.guAkk J. F. Opeka Station Superintendent Millstone Nuclear Power Station JF0/RB:lla

Attachment:

LER 79-13/3L-0 cc: Director, Office 6f Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Information and Program Control, Washington, D.C. (3) 2146 065 10 fl0$)

8 l'l 7906200.24.o