ism                                                          March 13, 1981
ism                                                          March 13, 1981 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission                  O Attn:    Mr. Steven A. Varga, Chief                              /
                                                                            #
Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission                  O Attn:    Mr. Steven A. Varga, Chief                              /
Operating Reactors Branch No. 1                                              l Division of Licensing                          g-f g Y,p/ ,
Operating Reactors Branch No. 1                                              l Division of Licensing                          g-f g Y,p/ ,
                                                                                              -
Washington, DC 20555                                    5              /g        Il
Washington, DC 20555                                    5              /g        Il
                                                                     \              Sf      bg/
                                                                     \              Sf      bg/
Line 35: Line 29:
                                                                       $+
                                                                       $+
W
W
                                                                                                '


==Reference:==
==Reference:==
Line 44: Line 37:
: 2. Five (5) copies of this request (non-proprietary)
: 2. Five (5) copies of this request (non-proprietary)
: 3. One (1) copy - Application for Withholding and One (1) copy - Affidavit AW-76-8 This change is being submitted to allow a deviation between rod demand l
: 3. One (1) copy - Application for Withholding and One (1) copy - Affidavit AW-76-8 This change is being submitted to allow a deviation between rod demand l
indicators and analog rod position indic tors of 1 16 steps.      The analysis that hr.s been performed provides that a total misalignment of 1 32 steps is acceptable. For that reason, we also propose that the individual rod position j        indication system accuracy also be increased to i 16 steps. The analysis was
indicators and analog rod position indic tors of 1 16 steps.      The analysis that hr.s been performed provides that a total misalignment of 1 32 steps is acceptable. For that reason, we also propose that the individual rod position j        indication system accuracy also be increased to i 16 steps. The analysis was performed for cycle 2 operation only and we propose that the technical speci-fication be amended for this cycle only.
'
performed for cycle 2 operation only and we propose that the technical speci-fication be amended for this cycle only.
Safety Evaluation The analysis performed by Westinghouse using THURTLE calculations determined the maximum penalties that can be expected with a 32 step (20 inches) rod misalign=ent of a single rod from the bank demand indicator.
Safety Evaluation The analysis performed by Westinghouse using THURTLE calculations determined the maximum penalties that can be expected with a 32 step (20 inches) rod misalign=ent of a single rod from the bank demand indicator.
Attachment 1 su=marizas these penalties. The analysis has determined the impact of these penalties on peaking factors in less than the existing conservatism applied in the original analysis. Therefore, with a rod misalignment of 32 steps, the predicted maxi =um FAH and Fq values will be below the limit allowed by the Technical Specifications.
Attachment 1 su=marizas these penalties. The analysis has determined the impact of these penalties on peaking factors in less than the existing conservatism applied in the original analysis. Therefore, with a rod misalignment of 32 steps, the predicted maxi =um FAH and Fq values will be below the limit allowed by the Technical Specifications.
8103170 $77
8103170 $77


_ . . _
    .
d Beaver Valley Power Station, Unit No. 1 Doc'.et No. 50-334, License No. DPL 66 R4 quest for Amendment 58 to operating License Page 2 The OSC and ORC have reviewed the proposed change and have determined that there are no safety implications associated with the -2nge, that the change does not constitute an unreviewed safety question au.- that the basis for the technical specifications has not changed.
d Beaver Valley Power Station, Unit No. 1 Doc'.et No. 50-334, License No. DPL 66 R4 quest for Amendment 58 to operating License Page 2 The OSC and ORC have reviewed the proposed change and have determined that there are no safety implications associated with the -2nge, that the change does not constitute an unreviewed safety question au.- that the basis for the technical specifications has not changed.
This request contains proprietary infor=ation of the Westinghouse Electric Corporation.        In conformance with the requirements of 10 CFR 2.790 as amended, we are enclosing with this request an application for withholding from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission.
This request contains proprietary infor=ation of the Westinghouse Electric Corporation.        In conformance with the requirements of 10 CFR 2.790 as amended, we are enclosing with this request an application for withholding from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission.
Line 58: Line 47:
Wiesemann, Manager, Regulatory and Legislative Affairs, Westinghouse Electric Corporation, Water Reactors Division, Box 355, Pittsburgh, PA 15230.
Wiesemann, Manager, Regulatory and Legislative Affairs, Westinghouse Electric Corporation, Water Reactors Division, Box 355, Pittsburgh, PA 15230.
We have deter =ined the change to be a Class III amendment and we are enclosing a check for $4,000 in accordance with 10 CFR 170.22.
We have deter =ined the change to be a Class III amendment and we are enclosing a check for $4,000 in accordance with 10 CFR 170.22.
Very truly yours, Lee C. N. Dunn Vice President, Operations ec:      Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station
Very truly yours, Lee C. N. Dunn Vice President, Operations ec:      Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Washington, DC 20555
'
Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Washington, DC 20555


              ,                        ..                                                  . - .
    *
  <
l l
l l
l
l
Line 73: Line 57:
s
s
                 'i H%        :k Thomas Welfer,[Jr. '
                 'i H%        :k Thomas Welfer,[Jr. '
l                Secretary
l                Secretary l
!
l
!
COMMONWEALTH OF PENNSYLVANIA)
COMMONWEALTH OF PENNSYLVANIA)
                                   ) SS:
                                   ) SS:
Line 85: Line 66:
;    correct to the best of his knowledge, information and belief.
;    correct to the best of his knowledge, information and belief.
w&A                    /
w&A                    /
DONALD W. SHANNON, NOTARY PUBLIC
DONALD W. SHANNON, NOTARY PUBLIC PITTSBURGH, ALLEGHENY COUNTY MY COMMIS$10N EXP!RES JUNE 7,1983 Member, Pennsylvania Associabon of Notaries
,
PITTSBURGH, ALLEGHENY COUNTY
'
MY COMMIS$10N EXP!RES JUNE 7,1983 Member, Pennsylvania Associabon of Notaries
                    .
                                                         .}}
                                                         .}}

Latest revision as of 02:26, 31 January 2020

Application for Amend 58 to License DPR-66.Proposed Tech Specs Change Would Permit Deviation of 16 Steps Between Rod Demand & Rod Position Indicators.Info Withheld (Ref 10CFR2.790).Results Available in Central Files Only
ML19347D420
Person / Time
Site: Beaver Valley
Issue date: 03/13/1981
From: Dunn C
DUQUESNE LIGHT CO.
To:
Shared Package
ML19260G752 List:
References
TAC-43586, NUDOCS 8103170577
Download: ML19347D420 (3)


Text

r -

'Af M uta 4ss-sooo

=;a~

ism March 13, 1981 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission O Attn: Mr. Steven A. Varga, Chief /

Operating Reactors Branch No. 1 l Division of Licensing g-f g Y,p/ ,

Washington, DC 20555 5 /g Il

\ Sf bg/

i

$+

W

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR 66 kt Request for Amendment 58 to operating License N & QTT.~hg/ .

Gentlemen:

The purpose of this letter is to propose a change to the Beaver Valley Power Station Appendix A Technical Specifications. Since this request cen-tains information which is proprietary we are enclosing:

1. Three (3) signed originals and thirty-seven (37) copies of this request (proprietary)
2. Five (5) copies of this request (non-proprietary)
3. One (1) copy - Application for Withholding and One (1) copy - Affidavit AW-76-8 This change is being submitted to allow a deviation between rod demand l

indicators and analog rod position indic tors of 1 16 steps. The analysis that hr.s been performed provides that a total misalignment of 1 32 steps is acceptable. For that reason, we also propose that the individual rod position j indication system accuracy also be increased to i 16 steps. The analysis was performed for cycle 2 operation only and we propose that the technical speci-fication be amended for this cycle only.

Safety Evaluation The analysis performed by Westinghouse using THURTLE calculations determined the maximum penalties that can be expected with a 32 step (20 inches) rod misalign=ent of a single rod from the bank demand indicator.

Attachment 1 su=marizas these penalties. The analysis has determined the impact of these penalties on peaking factors in less than the existing conservatism applied in the original analysis. Therefore, with a rod misalignment of 32 steps, the predicted maxi =um FAH and Fq values will be below the limit allowed by the Technical Specifications.

8103170 $77

d Beaver Valley Power Station, Unit No. 1 Doc'.et No. 50-334, License No. DPL 66 R4 quest for Amendment 58 to operating License Page 2 The OSC and ORC have reviewed the proposed change and have determined that there are no safety implications associated with the -2nge, that the change does not constitute an unreviewed safety question au.- that the basis for the technical specifications has not changed.

This request contains proprietary infor=ation of the Westinghouse Electric Corporation. In conformance with the requirements of 10 CFR 2.790 as amended, we are enclosing with this request an application for withholding from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission.

Correspondence with respect to the affidavit or application from with-holding should reference CAW-81-6 and should be addressed to Mr. Robert A.

Wiesemann, Manager, Regulatory and Legislative Affairs, Westinghouse Electric Corporation, Water Reactors Division, Box 355, Pittsburgh, PA 15230.

We have deter =ined the change to be a Class III amendment and we are enclosing a check for $4,000 in accordance with 10 CFR 170.22.

Very truly yours, Lee C. N. Dunn Vice President, Operations ec: Mr. D. A. Beckman, Resident Inspector U.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U.S. Nuclear Regulatory Commission c/o Document Management Washington, DC 20555

l l

l

)

l l

(CORPORATE SEAL)

Attest:

s

'i H% :k Thomas Welfer,[Jr. '

l Secretary l

COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF ALLEGIENY )

On this /S day of NddC M , 1981, before me, DONAT,n W mnmrnw , a Notary Public in and for said Commonwealth and County, personiffy' appeared C. N. Dunn, who being duly sworn, deposed,

~

and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and

correct to the best of his knowledge, information and belief.