| issue date = 05/08/2019
| issue date = 05/08/2019
| title = NRC Integrated Inspection Report 05000498/2019001; 05000499/2019001, and Independent Spent Fuel Storage Inspection 07201041/2019001
| title = NRC Integrated Inspection Report 05000498/2019001; 05000499/2019001, and Independent Spent Fuel Storage Inspection 07201041/2019001
| author name = Taylor N H
| author name = Taylor N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Powell G T
| addressee name = Powell G
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499, 07201041
| docket = 05000498, 05000499, 07201041
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:/RA/  
{{#Wiki_filter:==SUBJECT:==
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000498/2019001; 05000499/2019001, AND INDEPENDENT SPENT FUEL STORAGE INSPECTION 07201041/2019001


****
==Dear Mr. Powell:==
*
On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your South Texas Project Electric Generating Station, Units 1 and 2. On April 11, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
******


****
NRC inspectors documented two findings of very low safety significance (Green) in this report.


*
One of these findings involved a violation of NRC requirements.
**


a secured document management system
The inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
 
If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at South Texas Project Electric Generating Station, Units 1 and 2.
 
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at South Texas Project. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket Nos. 05000498; 05000499 and 07201041 License Nos. NPF-76 and NPF-80 Enclosure:
Inspection Report 05000498/2019001; 05000499/2019001 and 07201041/2019001 w/attachment: NRC Request for Information
 
U.S. NUCLEAR REGULATORY COMMISSION
 
==Inspection Report==
Docket Number(s): 05000498; 05000499 and 07201041 License Number(s): NPF-76 and NPF-80 Report Number(s): 05000498/2019001; 05000499/2019001, and 07201041/2019001 Enterprise Identifier: I-2019-001-0004 and 1-2019-001-0082 Licensee: STP Nuclear Operating Co.
 
Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, TX 77483 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: B. Baca, Health Physicist J. Choate, Resident Inspector A. Sanchez, Senior Resident Inspector L. Brookhart, Senior ISFSI Inspector, FCDB C. Smith, Reactor Inspector, DRS, EB1 O. Masnyk Bailey, Health Physicist, RI, DIRHB M. Learn, Reactor Engineer, RIII, MCID R. Edwards, Senior Health Physicist, RIII, MCID Approved By: Nicholas H. Taylor Chief, Project Branch B Division of Reactor Projects
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a quarterly inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in report sections:
71153.
 
List of Findings and Violations Failure to Implement the Procedure for Equipment Failures Cornerstone            Significance                            Cross-cutting        Report Aspect              Section Initiating Events      Green                                    [H.12] - Avoid      71152 FIN 05000499/2019-01                    Complacency          Problem Closed                                                        Identification and Resolution The inspectors identified a Green finding for the licensees failure to implement the procedure for the failure of a plant generation risk high risk component. Specifically, the licensee failed to implement and follow Procedure WCG-0008, Preventing Recurring Equipment Problems (PREP), Revision 7, following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve, FCV-553.
 
Failure to Provide Adequate Procedural Guidance for a Surveillance Test Cornerstone            Significance                            Cross-cutting        Report Aspect              Section Initiating Events      Green                                    [H.12] - Avoid      71152 NCV 05000499/2019-02                    Complacency          Problem Closed                                                        Identification and Resolution The inspectors documented a Green self-revealed NCV for the failure to provide an adequate procedure for a Unit 2 qualified display processing system (QDPS) surveillance procedure that resulted in unnecessary troubleshooting, unnecessary replacement of properly operating circuit cards, and placing the loop 2 over-temperature delta-T, over-pressure delta-T, and low Tavg feedwater isolation bistables into a TRIPPED condition, a half-trip condition for the reactor. Following an investigation, the licensee discovered that incorrect biases were inputted into the QDPS surveillance procedure.
 
Additional Tracking Items Type Issue number          Title                          Inspection Status Procedure LER  05000498/2017-002-00  Unit 1 Condition Prohibited by  71153      Closed Technical Specifications due to Follow-up Inoperable Control Room        of Events Envelope Makeup Filtration System Heating Coil LER  05000498/2018-001-00  Unit 1 Main Steam Safety Valve  71153      Closed As Left Settings Outside of    Follow-up Required Range Contrary to      of Events Technical Specifications due to Inadequate Procedure
 
=PLANT STATUS=
 
Unit 1 operated at rated thermal power for the entire inspection period.
 
Unit 2 began the inspection period at rated thermal power. On March 2, 2019, while performing main turbine governor valve testing at 90 percent power, a procedural error resulted in an unexpected decrease in reactor power to 86 percent power. The reactor was returned back to rated thermal power on March 3, 2019, and remained there for the remainder of the inspection period.
 
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
==REACTOR SAFETY==
 
==71111.04 - Equipment Alignment    Partial Walkdown (IP Section 02.01)==
{{IP sample|IP=IP 71111.04|count=5}}
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 1, train B chemical and volume control system during train A centrifugal charging pump maintenance on January 2, 2019
: (2) Unit 2, turbine driven auxiliary feedwater system with elevated unit trip risk during north bus outage on March 1, 2019
: (3) Unit 2, train C emergency core cooling system during train B emergency diesel generator maintenance on March 13, 2019
: (4) Unit 2, train A essential chilled water system during train B essential chilled water system maintenance on March 16, 2019
: (5) Unit 2, train A essential cooling water system during train C essential cooling water maintenance on March 22, 2019
 
==71111.05Q - Fire Protection    Quarterly Inspection (IP Section 03.01)==
{{IP sample|IP=IP 71111.05Q|count=5}}
 
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Unit 2, safety injection pump cubicles, Fire Area 35 on February 2, 2019
: (2) Units 1 and 2, balance of plant diesel generator rooms and turbine generator building switchgear rooms, Fire Areas 78 and 90 on February 26, 2019
: (3) Unit 1, auxiliary feedwater pump cubicles, Fire Areas 48, 49, 50, and 51 on February 27, 2019
: (4) Unit 1, train C essential cooling water intake structure, Fire Area 55 on March 22, 2019
: (5) Unit 1, train C vital switchgear room, battery room, 125 vdc distribution room, and motor generator room, Fire Areas 52 through 54 on March 26, 2019
 
==71111.06 - Flood Protection Measures    Inspection Activities - Internal Flooding (IP Section 02.02a.)==
{{IP sample|IP=IP 71111.06|count=1}}
 
The inspectors evaluated internal flooding mitigation protections in the Unit 1, train B essential cooling water pump room on March 26, 2019.
 
==71111.07A - Heat Sink Performance    Annual Review (IP Section 02.01)==
{{IP sample|IP=IP 71111.07A|count=1}}
 
The inspectors evaluated readiness and performance of:
: (1) Unit 1, train C emergency diesel generator jacket water and lube oil heat exchangers the week of January 14, 2019
: (2) Unit 2, train B essential chilled water cooler the week of March 12, 2019
 
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance    Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)==
{{IP sample|IP=IP 71111.11Q|count=1}}
 
The inspectors observed and evaluated licensed operator performance in the Unit 1 control room during a secondary side electro-hydraulic leak which resulted in the closure of the 13 west reheat stop valve to the low pressure turbine on January 9, 2019.
 
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
The inspectors observed and evaluated Unit 1 operations in the simulator during a loss of coolant accident followed by a loss of offsite power on February 27, 2019.
 
==71111.12 - Maintenance Effectiveness    Routine Maintenance Effectiveness Inspection (IP Section 02.01)==
{{IP sample|IP=IP 71111.12|count=2}}
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Unit 1, turbine driven auxiliary feedwater pump low governor oil level that resulted in inoperability of the train on January 3, 2019
: (2) Unit 1, electro-hydraulic control system leak that resulted in the closure of reheat stop valve 13 on January 9, 2019
 
==71111.13 - Maintenance Risk Assessments and Emergent Work Control    Risk Assessment and Management Sample (IP Section 03.01)==
{{IP sample|IP=IP 71111.13|count=4}}
 
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Units 1 and 2, planned north bus outage that resulted in entering the Configuration Risk Management Program on February 26, 2019
: (2) Unit 2, planned turbine driven auxiliary feedwater pump extent of condition maintenance for connecting rod engagement on January 31, 2019
: (3) Unit 1, train B essential cooling water unplanned pump replacement February 13 through 19, 2019
: (4) Unit 1, elevated risk due to unplanned entry into the Configuration Risk Management Program for exceeding the train B essential chilled water system 7 day limiting condition for operation due to maintenance activities on March 10, 2019
 
==71111.15 - Operability Determinations and Functionality Assessments    Sample Selection (IP Section 02.01)==
{{IP sample|IP=IP 71111.15|count=5}}
 
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) Unit 1, turbine driven auxiliary feedwater pump following the identification of a degraded conduit for the remote trip solenoid on January 16, 2019
: (2) Unit 1, train B control room envelope heating, ventilation, and air conditioning damper controller on February 6, 2019
: (3) Unit 2, cask loading pool leakage on February 12, 2019
: (4) Unit 1, train B emergency diesel generator shutdown when taken out of emergency mode on March 11, 2019
: (5) Unit 2, turbine driven auxiliary feedwater pump experiencing high main oil pump discharge pressure on March 15, 2019
 
==71111.19 - Post Maintenance Testing    Post Maintenance Test Sample (IP Section 03.01)==
{{IP sample|IP=IP 71111.19|count=6}}
 
The inspectors evaluated the following post maintenance tests:
: (1) Unit 1, train C emergency diesel generator following fuel oil storage tank level transmitter replacement on January 31, 2019
: (2) Unit 2, turbine driven auxiliary feedwater pump following failure of connecting rod on January 31, 2019
: (3) Unit 1, train B essential cooling water pump following pump replacement on March 4, 2019
: (4) Unit 1, train B emergency diesel generator following replacement of shutdown air solenoid valve on March 13, 2019
: (5) Units 1 and 2, diesel fire pump number 3 following replacement of the pump impeller, diesel starter solenoid, and pump packing on March 18, 2019
: (6) Unit 2, train C residual heat removal pump following control room handswitch replacement on March 19, 2019
 
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:    In Service Testing (IST) (IP Section 03.01)==
{{IP sample|IP=IP 71111.22|count=2}}
: (1) Unit 1, turbine driven auxiliary feedwater pump surveillance test on January 24, 2019
: (2) Unit 1, train B essential cooling water system surveillance test on February 14, 2019
 
===Surveillance Testing (IP Section 03.01) (4 Samples)===
: (1) Unit 2, train B emergency diesel generator surveillance test on February 12, 2019
: (2) Unit 2, train A auxiliary feedwater regulating valve dynamic pressure test on March 4, 2019
: (3) Unit 1, train B emergency diesel generator fast start surveillance on March 13, 2019
: (4) Unit 1, train C emergency diesel generator fast start surveillance on March 15,
 
==RADIATION SAFETY==
 
==71124.02 - Occupational ALARA Planning and Controls    Radiological Work Planning (IP Section 02.01)==
{{IP sample|IP=IP 71124.02|count=1}}
 
The inspectors evaluated the licensees radiological work planning by reviewing the following activities:
* 1RE21 - Reactor Cavity and Head Activities
* 1RE21 - Fuel Transfer Canal Activities
* 2RE19 - Reactor Cavity and Head Activities
* 2RE19 - Steam Generator Activities Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02)
  (1 Sample)
The inspectors evaluated dose estimates and exposure tracking. The inspectors reviewed the following ALARA planning documents:
* 18-276-7 ALARA Review Package: 2RE19 Non-Rapid Refuel, Revision 1
* 18-276-8 ALARA Review Package: 2RE19 Steam Generator Inspections
* 18-7926-4 ALARA Review Package: 1RE21 Non-Rapid Refuel Additionally, the inspectors reviewed the following radiological outcome evaluations:
* 18-276-7 ALARA Close Out Review Package: 2RE19 Non-Rapid Refuel, Revision 1
* 18-276-8 ALARA Close Out Review Package: 2RE19 Steam Generator Inspections
* 18-7926-4 ALARA Close Out Review Package: 1RE21 Non-Rapid Refuel
* 18-7926-4 ALARA Close Out Review Package Supplement 1: 1RE21 Non-Rapid Refuel
 
==71124.04 - Occupational Dose Assessment    External Dosimetry (IP Section 02.02)==
{{IP sample|IP=IP 71124.04|count=1}}
 
The inspectors evaluated the external dosimetry program implementation.
 
===Internal Dosimetry (IP Section 02.03) (1 Sample)===
The inspectors evaluated the internal dosimetry program implementation.
 
Three contaminated workers' whole body counts were reviewed for potential uptakes. The licensee had no positive whole body counts indicating an internal uptake of radioactive material.
 
The licensee had no occurrences to observe or review in-vitro internal monitoring or dose assessments performed using air sampling and DAC-hr. monitoring.
 
===Source Term Categorization (IP Section 02.01) (1 Sample)===
The inspectors evaluated the licensees characterization of the source term and use of    scaling factors for the use of hard-to-detect radionuclide activity.
 
===Special Dosimetric Situations (IP Section 02.04) (1 Sample)===
The inspectors evaluated special dosimetric situations, as detailed below.
* The inspectors reviewed approximately five declared pregnant workers' documentation from January 1, 2017, to March 21, 2019.
* The licensee did not perform any EDEX assessments from July 31, 2017, to March 21, 2019.
* The inspectors reviewed one shallow dose equivalent assessment (Condition Report 2019-1215).
* The inspectors reviewed the licensee's use of Mirion neutron thermoluminescent dosimetry and electronic alarming dose meters (Model EPDN2) for neutron dosimetry. The inspector compared radiological surveys, RWP and WAN assignments, and worker exposures to confirm the licensee is appropriately assigning neutron dose to occupational workers.
 
==OTHER ACTIVITIES - BASELINE==
 
===71151 - Performance Indicator Verification    The inspectors verified licensee performance indicators submittals listed below.
 
  ===
{{IP sample|IP=IP 71151|count=6}}
: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (Units 1 and 2, January -
December 2018
: (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (Units 1 and 2, January - December 2018
: (3) IE04: Unplanned Scrams with Complications Sample (Units 1 and 2, January -
December 2018)
 
==71152 - Problem Identification and Resolution    Annual Follow-up of Selected Issues (IP Section 02.03)==
{{IP sample|IP=IP 71152|count=4}}
 
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Unit 2, pressurizer master controller card failure, Condition Report 2017-658.
 
Inspectors reviewed the plant response to the event, operator actions, corrective actions, and interviewed licensee personnel.
: (2) Unit 1, low head safety injection breaker failure, Condition Report 2017-20444.
 
Inspectors reviewed the apparent cause investigation, operability evaluation, and corrective actions.
: (3) Unit 2, train C steam generator main control valve failed low in automatic mode, Condition Report 2017-17659. Inspectors reviewed the plant response to the event, operator actions, maintenance and engineering troubleshooting repair of the issue, interviewed licensee personnel and corrective actions.
: (4) Unit 2, train D qualified display processing system calibration procedure that resulted in exceeding the Technical Specification allowed outage time and placed the bistables into a trip condition, Condition Reports 2016-11346 and 2016-11257. The inspectors reviewed the prompt investigation, interviewed maintenance and engineering personnel, and evaluated the corrective actions.
 
===71153 - Follow-up of Events and Notices of Enforcement Discretion    Event Report (IP Section 03.02) ===
{{IP sample|IP=IP 71153|count=2}}
The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:
: (1) LER 05000498/2017-002-00, "Unit 1 Condition Prohibited by Technical Specifications due to Inoperable Control Room Envelope Makeup Filtration System Heating Coil,"
on January 22, 2018:
: (2) LER 05000498/2018-001-00, "Unit 1 Main Steam Safety Valve As Left Settings Outside of Required Range Contrary to Technical Specifications due to Inadequate Procedure," on December 4, 2018:
 
==OTHER ACTIVITIES==
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)60855 - Operation of an ISFSI at Operating Plants 60857 - Review of 10 CFR 72.48 Evaluations Inspections of dry cask storage operations were conducted at STP on January 21-25 and on January 28 through February 2, 2019, by inspectors from NRC Regions I, III, and IV. The STP ISFSI was licensed as a general 10 CFR Part 72 license and utilized the Holtec HI-STORM FW Certificate of Compliance (COC) 1032 Amendment 2 and HI-STORM FW Final Safety Analysis Report (FSAR) Revision 5.
 
In prior NRC ISFSI inspections at STP (ADAMS Accession Nos. ML18221A385 and ML19032A079), the NRC staff documented the observations and evaluations of many of the required pre-operational demonstrations from License Condition No. 9 of the COC performed by STP. Those inspections included an in-depth review of the licensees dry cask storage program implementation into existing 10 CFR Part 50 programs to support ISFSI operations at the site. The purpose of the NRC inspections in January and February 2019 were to:
: (1) observe and evaluate the remaining pre-operational demonstrations and training exercises which STP was required to complete prior to commencing loading operations, and
: (2) observe and evaluate the licensees first loading operations. On January 21-25, 2019, the NRC staff observed STP complete the remaining demonstrations listed in License Condition No. 9 of the COC to allow use of the Holtec HI-STORM FW storage system. South Texas Project had successfully completed all the required pre-operations activities and fully demonstrated that the procedures, programs, and training related to those dry cask storage operations had been successfully integrated into its site operations. The subsequent week, from January 28 to February 2, 2019, NRC staff observed the licensees first canister loading operations.
 
The ISFSI activities specifically reviewed during the on-site inspections and during in-office review included:
 
===1. Evaluated and observed dry run demonstrations from License Condition No. 9 of the===
 
COC, which included: preparation of the canister storage system for fuel loading; loading a dummy fuel assembly into the canister with appropriate independent verification; selection and verification of the specific fuel assemblies to ensure type conformance; remote installation of the canister lid; removal of the canister from the spent fuel pool; and unloading operations that included remotely removing a lid from the canister to support fuel unloading.
 
===2. Reviewed the licensees structural and seismic calculations for dry cask storage===
 
operations which included: over-head spent fuel building crane with loaded Transfer Cask (TC); loaded TC in the spent fuel pools loading area; loaded TC in the canister wash-down area for processing operations; loaded TC in the stack-up configuration to support downloading of a canister into the concrete over-pack; loaded over-pack on low-profile transporter; and loaded over-pack being carried by the vertical cask transporter to the ISFSI pad.
 
===3. Reviewed two 10 CFR 72.48 safety evaluations performed by the licensee for changes===
 
made to the ISFSI program since the previous NRC ISFSI inspection per Inspection      Procedure 60857.
 
===4. Reviewed spent fuel documentation for the first canister to verify the fuel met all===
 
Appendix B Technical Specifications requirements for storage.
 
===5. Evaluated and observed fuel selection and fuel loading operations associated with dry===
 
fuel storage canister No. 1.
 
===6. Evaluated and observed welding of the canister, non-destructive testing of the welds,===
 
forced helium drying, helium backfill, and heavy load movements from the spent fuel      pool to the sites vertical cask transporter.
 
===7. Reviewed the licensee's loading, processing, and heavy load procedures associated===
 
with their current dry fuel storage campaign.
 
===8. Reviewed the licensees corrective action programs condition reports of issues identified===
 
for resolution since the previous NRC ISFSI inspection performed in November 2018.
 
===9. Evaluated and observed the licensees radiation protection implementation during the===
 
dry run and loading operations.
 
10. Evaluated and observed the licensees implementation of foreign material exclusion process during the dry run and loading operations.
 
The inspectors did not identify any issues of concerns requiring documentation.
 
==INSPECTION RESULTS==
Failure to Implement the Procedure for Equipment Failures Cornerstone            Significance                            Cross-cutting      Report Aspect            Section Initiating Events      Green                                    [H.12] - Avoid    71152 FIN 05000499/2019-01                    Complacency        Problem Closed                                                      Identification and Resolution The inspectors identified a Green finding for the licensees failure to implement the procedure for the failure of a plant generation risk (PGR) high risk component. Specifically, the licensee failed to implement and follow Procedure WCG-0008, Preventing Recurring Equipment Problems (PREP), Revision 7, following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve FCV-553.
 
=====Description:=====
On June 19, 2017, Unit 2 reactor operators responded to control room alarms and indications for steam flow/ feed flow mismatch for steam generator 2C. Operators identified that the steam generator 2C main feedwater regulating valve had failed closed and that steam generator level was decreasing for that steam generator. Operators entered the appropriate off-normal procedure and within 28 seconds regained control of steam generator levels by manually controlling feedwater flow through the main feedwater regulating valve. As a result of the failure, reactor power lowered to approximately 97 percent, average reactor coolant system temperature (Tavg) reached a maximum valve of 592.9 degrees F (normally Tavg is 592.0), and steam generator 2C narrow range level lowered to 52.8 percent (normally 70 percent).
 
Following the failure, engineering and maintenance discussed and implemented changing out a suspected nuclear tracker-driver (NTD) circuit card. This type of activity in the 7300 control cabinets is a high risk evolution and required a work activity risk review to help ensure no mistakes were made and that operations prepared for the worst case outcome. South Texas Project (STP) has site specific operating experience where card calibration and card replacement activities have resulted in reactor trips. Engineering was confident that the NTD circuit card was the problem. Maintenance personnel suggested measuring voltage readings at various locations inside the panel to ensure the faulty card was identified, however these measurements were not taken due to engineerings position that the NTD card was faulty.
 
The inspectors attended the pre-job brief and observed the field work. Maintenance performed the card replacement successfully, but the issue remained. Maintenance and engineering regrouped and decided to take voltage measurements to identify the circuit card failure. Maintenance identified the nuclear control board (NCB) as the problem and replaced the NCB without issue. STP performed the high-risk evolution twice due to inadequate troubleshooting and over-reliance on engineering assumptions.
 
The licensee evaluated the operators response to the main feedwater regulating valve failure and engineering and maintenances response to troubleshooting and repair of the failed circuit card. The inspectors interviewed engineering and maintenance and determined that the licensee should have entered and implemented Procedure WCG-0008 following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve, FCV-553.
 
The procedure would have ensured the appropriate degree of rigor was applied when pursuing resolution of high risk equipment issues. Specifically, Step 1.3 states, in part, The PREP process entry criteria are: Loss of Key Equipment function/ Critical Attribute.
 
The failure of the main feedwater regulating valve was a loss of key equipment function. The PREP process would have engaged more management oversight, directed the gathering of facts through Addendum 3, Preventing Recurring Equipment Problems (PREP) checklist, and may have led to the development of a troubleshooting plan.
 
Corrective Actions: The licensee replaced the failed card and developed a lessons-learned presentation for engineering to use human performance tools, validate assumptions, and challenge recommendations (use technical conscience).
 
Corrective Action References: Condition Reports 2017-17659 and 2019-4368
 
=====Performance Assessment:=====
Performance Deficiency: The failure to enter and use station Procedure WCG-0008, Preventing Recurring Equipment Problems (PREP), Revision 7, following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve, FCV-553, was a performance deficiency. Specifically, the licensee failed to enter WCG-0008 upon the failure of the main feedwater regulating valve, a loss of key equipment function due to the component being classified as a high PGR. The result of not implementing this procedure was an increased probability of tripping the reactor due to possible human error while in the 7300 control cabinet.
 
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the human performance attribute and adversely affected the Initiating Events Cornerstone objective to limit the likelihood of events that can upset plant stability during power operations and is therefore a finding. Specifically, engineering relied on past experience and did not consider entering and implementing the PREP process procedure, which would have applied more rigor to troubleshooting and resolving the issue.
 
Significance: The inspectors used IMC 0609, Appendix A, Exhibit 1, Initiating Events Screening Questions, issued June 19, 2012, to determine the finding was of very low safety significance, Green. Specifically, one finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.
 
Cross-cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools.
 
=====Enforcement:=====
Inspectors did not identify a violation of regulatory requirements associated with this finding.
 
Failure to Provide Adequate Procedural Guidance for a Surveillance Test Cornerstone            Significance                              Cross-cutting    Report Aspect            Section Initiating Events      Green                                    [H.12] - Avoid    71152 NCV 05000499/2019-02                      Complacency      Problem Closed                                                      Identification and Resolution The inspectors documented a Green self-revealed NCV for the failure to provide an adequate procedure for a Unit 2 qualified display processing system (QDPS) surveillance procedure that resulted in unnecessary troubleshooting, unnecessary replacement of properly operating circuit cards, and placing the loop 2 over-temperature delta-T (OTDT), over-pressure delta-T (OPDT), and low Tavg feedwater isolation bistables into a TRIPPED condition, a half-trip condition for the reactor. Following an investigation, the licensee discovered that incorrect biases were inputted into the QDPS surveillance procedure.
 
=====Description:=====
On September 15, 2016, operations declared the loop 2 OTDT, OPDT, and the low Tavg feedwater isolation inoperable for loop calibration surveillance testing and bypassed the channel per Technical Specifications 3.3.1, items 8 and 9, action 6, and 3.3.2, item 5F, action 20. If not restored within 72 hours, the channel must be placed into a TRIPPED condition. During the performance of Surveillance Procedure 0PSP05-RC-0420, Delta T and T average loop 2 Set Calibration (T-0420), Revision 53, maintenance identified an out-of-tolerance condition. Engineering recommended maintenance perform a QDPS output calibration using Procedure 0PMP08-AM-APCD2, QDPS Train D SGWLCS/TAS Input/Output Calibration, Revision 10. During this calibration, the licensee again identified an out-of-tolerance condition which could not be resolved. The licensee performed troubleshooting and began to replace circuit boards in the train D QDPS cabinet without success. On September 18, 2016, the bistables for the OTDT, OPDT, and Low Tavg feedwater isolation were placed into a TRIPPED condition as required by technical specifications.
 
The licensee subsequently discovered that an engineering error resulted in incorrect biases being placed into the Calibration Procedures 0PSP05-RC-0420 and 0PMP08-AM-APCD2.
 
The two procedures were corrected with the proper biases and completed satisfactorily. The manual substitution of the resistance temperature detector (RTD) biases in the two calibration procedures had never been performed before and, due to the complex nature of the QDPS system, only three people on site could perform and peer check these biases. The licensee performed a prompt investigation and a review for organizational learnings. The licensee determined that the engineer made changes to the procedure to account for the two RTD operation, but failed to get the values peer checked for accuracy. This failure led to excessive out-of-service time, unnecessary QDPS maintenance, and having to place the loop 2 protection bistables into a TRIPPED condition, i.e. half reactor trip.
 
Corrective Actions: The licensee immediately corrected the procedures and re-performed the calibrations and satisfactorily performed analog channel operational testing. The licensee also developed a lessons-learned document and has an outstanding action to develop an engineering guideline when either unit is in two RTD operation.
 
Corrective Action References: Condition Reports 2016-11346, 2016-11257, 2019-4367
 
=====Performance Assessment:=====
Performance Deficiency: The failure to provide adequate procedures for maintenance on safety-related equipment was a performance deficiency. Specifically, engineering supplied inaccurate information to calibration procedures for the Unit 2 loop 2 and train D QDPS that resulted in unnecessary maintenance in QDPS and TRIPPED bistables associated with OTDT, OPDT, and low Tavg feedwater isolation which caused Unit 2 to be in a half reactor trip.
 
Screening: The inspectors determined the performance deficiency was more than minor because it is associated with the Procedure Quality attribute and adversely affected the Initiating Event Cornerstone objective to limit the likelihood of events that can upset plant stability during power operations and is therefore a finding. Specifically, the loop 2 bistables associated with OTDT, OPDT, and low Tavg were placed into a TRIPPED condition which placed Unit 2 one spurious reactor trip signal away from a true reactor trip due to the performance deficiency.
 
Significance: The inspectors used IMC 0609, Appendix A, Exhibit 1, Initiating Events Screening Questions, issued June 19, 2012, to determine the finding was of very low safety significance, Green. Specifically, one finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.
 
Cross-cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools. The inspectors determined that the finding had a crosscutting aspect in the area of human performance associated with avoiding complacency. Specifically, engineering provided inaccurate biases for the procedure changes without utilizing appropriate error reduction tools [H.12].
 
=====Enforcement:=====
Violation: Technical Specification 6.8.1.a requires, in part, that written procedures shall be established, implemented, and maintained in accordance with Appendix A of Regulatory Guide 1.33, Revision 2, February 1978, Section 8.b.(L) reactor protection system tests and calibrations. The licensee established Procedure 0PSP05-RC-0420, Delta T and T average loop 2 Set Calibration (T-0420), Revision 53 to meet the Regulatory Guide 1.33 requirement.
 
The Unit 2 data package loop 2 set 2 (T-0420) provides appropriate biases to be used to test and calibrate the loop.
 
Contrary to the above, on September 15, 2016, the licensee failed to ensure that the Unit 2 data package loop 2 set 2 (T-0420) provided the appropriate biases to be used to test and calibrate the loop. Specifically, engineering failed to provide accurate biases for procedures used for surveillance and calibration of the OTDT, OPDT, and low Tavg feedwater isolation trip setpoints.
 
Enforcement Action: This violation is being treated as a Non-Cited Violation, consistent with Section 2.3.2 of the Enforcement Policy.
 
Minor Violation                                      71153 Follow-up of Events Minor Violation: Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System, states, in part, that if one Control Room Makeup and Cleanup Filtration System is inoperable, it must be restored to operable in Modes 1, 2, 3, and 4 within 7 days, or be in at least hot standby within the next 6 hours and in cold shutdown within the following 30 hours.
 
Contrary to the above, between September 27 and November 24, 2017, the licensee failed to restore one control room makeup and cleanup filtration system to operable. Specifically, the licensee failed to properly jumper a circuit board for the control room makeup and cleanup filtration system heating coil.
 
Screening: The inspectors determined the performance deficiency was minor. The inspectors found this violation to be minor in accordance with IMC 0612 Appendix B, Issue Screening, issued December 13, 2017, because the violation did not satisfy any of the four More-than-Minor screening questions.
 
=====Enforcement:=====
This failure to comply with Technical Specification 3.7.7 constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.
 
Licensee-Identified Non-Cited Violation                          71153 Follow-up of Events This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a Non-Cited Violation, consistent with Section 2.3.2 of the Enforcement Policy.
 
Violation: Technical Specification 3.7.1.1, Safety Valves, states, in part, that if one or more main steam line code safety valves are inoperable, they must be restored to operable status within 24 hours or reduce the Power Range Neutron Flux High Trip Setpoint or be in at least hot standby within the next 6 hours. Contrary to the above, between October 2 and 6, 2018, the licensee failed to restore two of the Unit 1 steam generator B main steam safety valves to operable status within 24 hours, failed to reduce the Power Range Neutron Flux High Trip Setpoint, and failed to be in at least hot standby within the next 6 hours. Specifically, the licensee failed to identify that two of the Unit 1 Steam Generator B main steam safety valves were left outside of their Technical Specification required lift settings following testing.
 
Significance: Green.
 
The inspectors determined the performance deficiency was more than minor because it adversely affected the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The inspectors assessed the significance of the finding using Exhibit 2, Mitigating Systems Screening Questions, of IMC 0609, Appendix A, Significance Determination Process (SDP) for Findings At-Power, issued June 19, 2012, and determined this finding did not represent an actual loss of function. Therefore, the inspectors determined the finding was of very low safety significance (Green).
 
Corrective Action References: Condition Reports 2018-11811 and 2019-4374
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On April 11, 2019, the inspector presented the quarterly resident inspector inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other members of the licensee staff.
* On March 21, 2019, the inspector presented the baseline radiation safety inspection to Mr. J. Connolly, Executive Vice President and Chief Nuclear Officer, and other members of the licensee staff.
* On March 21, 2019, the inspector presented the pre-operational dry run and first loading inspection to Mr. J. Connolly, Executive Vice President and Chief Nuclear Officer, and members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
71111.01-Adverse Weather
Procedures
Number              Title                                                        Revision
0PGP03-ZV-0001      Severe Weather Plan                                          21
71111.04-Partial Equipment Alignment
Condition Reports
CR-2018-2825
Procedures
Number                Title                                                      Revision
0POP02-AF-0001        Auxiliary Feedwater                                        52
0POP02-SI-0002        Safety Injection System Initial Lineup                    45
0PSP03-CH-0001        Essential Chilled Water Pump 11A(21A) Inservice Test      22
0POP02-EW-0001        Essential Cooling Water Operations                        80
Drawings
Number                Title                                                      Revision
5R179F05007#1        Chemical and Volume Control System                        52
5S142F00024#1        Auxiliary Feedwater                                        13
5N129F05015#2        Safety Injection System                                    21
5V119V10001#2        HVAC Essential Chilled Water System                        33
5R289F05038#2        Essential Cooling Water System Train 2B                    20
71111.05-Fire Protection
Procedures
Number                Title                                                      Revision
0FHB35-FP-0306        Fire Preplan Fuel Handling Building Train B SI/CSS Cubicle 2
0FHB35-FP-0307        Fire Preplan Fuel Handling Building Train A SI/CSS Cubicle 2
0PGP03-ZF-0011        STPEGS Fire Brigade                                        18
0DMB99-FP-0920        Fire Preplan for Make-Up Demineralizer Building            2
0TGB78-FP-0703        Fire Preplan Turbine Generator Building BOP Diesel        3
Generator Building
0TGB90-FP-0702        Fire Preplan for Turbine Generator Building 4.16 KV and    3
Electrical Equipment Rooms
Procedures
Number              Title                                                          Revision
0TGB90-FP-0710      Fire Preplan Turbine Generator Building 13.8 KV Switchgear 3
Room and Cable Vault
0IVC48-FP-0403      Fire Preplan Isolation Valve Cubicle Pump Room Train C        3
0IVC49-FP-0402      Fire Preplan Isolation Valve Cubicle Pump Room Train B        3
0IVC50-FP-0401      Fire Preplan Isolation Valve Cubicle, Pump Room Train A        2
0IVC51-FP-0400      Fire Preplan Isolation Valve Cubicle, Pump Room Train D        2
0EAB-FP-0052        Fire Preplan Electrical Auxiliary Building ESF Switchgear      4
Room Train C
0EAB-FP-0053        Fire Preplan Electrical Auxiliary Building, Channel IV Battery 3
and Distribution Room
0EAB-FP-0054        Fire Preplan Electrical Auxiliary Building, Motor Generator    3
Room
1ECW55-FP-0602      Fire Preplan Essential Cooling Water Intake Structure Pump 5
Room Train C
71111.07A - Annual Heat Sink
Procedures
Number              Title                                                          Revision
0PMP05-CH-0003      York Chiller Inspection & Maintenance 300 Tons                13
0PGP03-ZE-0080      Essential Cooling Water System Reliability Program            2
Work Authorization Numbers
443062
71111.11-Simulator/Control Room Observation
Condition Reports
CR-2019-364          CR-2019-423
Procedures
Number              Title                                                          Revision
0POP02-EH-0001      Main Turbine EHCS                                              77
0POP07-MS-0003      Main Turbine Steam Inlet Valve Test                            29
P&ID
Number              Title                                                          Revision
6S109F00017#1        P&ID Main Steam                                                28
P&ID
Number                Title                                                      Revision
7T089F10001#1        P&ID EH Fluid System                                        57
71111.12-Maintenance Effectiveness
Condition Reports
CR-2015-18885          CR-2017-15182            CR-2017-23544          CR-2018-995
CR-2018-8533          CR-2018-1108            CR-2018-12813          CR-2018-15270
CR-2018-15273
Work Authorization Numbers
499003                519391                  521829                532330
540499                548908                  568084                603714
Procedures
Number                Title                                                        Revision
0PMP04-AF-0002        Auxiliary Feedwater Pump Turbine Maintenance                41
0PMP04-AF-0003        Auxiliary Feedwater Turbine Trip Throttle Valve Maintenance 36
0PSP03-AF-0007        Auxiliary Feedwater Pump 14(24) Inservice Test              5
Drawings
Number                Title                                                        Revision
6S109F00017#1        Piping and Instrumentation Diagram Main Steam                28
7T089F10001#1        Piping and Instrumentation Diagram Electro Hydraulic Fluid  51
System
71111.13-Maintenance Risk and Emergent Work
Procedures
Number                Title                                                      Revision
0PGP03-ZA-0091        Configuration Risk Management Program                      14
0POP01-ZO-0006        Risk Management Actions (RMAs)                              27
Work Activity Risk (WAR)
2804
RasCal Sequences
3331                  3336                    3337
71111.15-Operability Determinations and Functionality Assessments
Condition Reports
CR-2019-47            CR-2019-347              CR-2019-1377          19-2777
19-637
Drawings
STI. Number          Title                                            Date
31390502              Cabinet-Control (Assembly Engine Control)        02/27/1978
298485              Control Schematic (Starting Sequence Control)    09/29/1977
71111.19-Post Maintenance Testing
Condition Reports
CR-2018-7676          CR-2018-9443            CR-2018-14727        CR-2019-111
CR-2019-893            CR-2019-1762            CR-2019-2357          CR-2019-2435
CR-2019-2777          CR-2019-1020
Work Authorization Numbers
545649                565703                  571744                571827
2175                576480                  602665                604208
604273                606453                  573948                605423
Procedures
Number                Title                                                      Revision
0PSP04-DG-0004        Standby Diesel Generator Fuel Oil Storage Tank Inspection  9
0PMP08-DO-9109        ESF Diesel Generator Fuel Oil Storage Tank Level          3
Calibration
0PSP03-EW-0011        Essential Cooling Water Pump 1B(2B) Reference Values      27
Measurement
0PSP03-AF-0007        Auxiliary Feedwater Pump 14(24) Inservice Test            51
0POP07-FP-0001        Diesel Fire Pump Test                                      18
0PTP03-FP-0106        Fire Protection Water System Functional Test              20
0PSP03-DG-0002        Standby Diesel 12(22) Operability Test                    64
Miscellaneous
Documents
Number              Title                                                          Revision
VTD-T343-0001        Installation and Service Instructions for Tuthill Cartridge    1
Pumps
VTD-P104-0011        Patterson Operation and Maintenance Manual for Double          0
Suction Split Case Pumps
71111.22-Surveillances
Condition Reports
CR-2019-975          CR-2019-1762
Procedures
Number              Title                                                          Revision
0POP02-AF-0001      Auxiliary Feedwater                                            52
0PSP03-AF-0007      Auxiliary Feedwater Pump 14(24) Inservice Test                51
0PMP05-ZE-0425      MOV Diagnostic Testing (VOTES) - Rising Stem Valves            2
0PEP07-AF-0003      Dynamic Stroke Testing of Train A Auxiliary Feed Motor        3
Operated Feed Regulating Valve
0PSP03-DG-0003      Standby Diesel 13(23) Operability Test                        63
0PMP07-DG-0001      Standby Diesel Recording M&TE Installation                    5
0PSP03-DG-0002      Standby Diesel 12(22) Operability Test                        64
0PSP03-EW-0018      Essential Cooling Water System Train B Testing                55
71124.02 - Occupational ALARA Planning and Controls
Condition Reports
CR-2018-3840          CR-2018-3991              CR-2018-4050            CR-2018-4125
CR-2018-4555          CR-2018-4860              CR-2018-5849            CR-2018-6071
CR-2018-8097          CR-2018-9179              CR-2018-9284            CR-2018-11217
CR-2018-12339        CR-2018-13572              CR-2019-234              CR-2018-1066
Procedures
Number              Title                                                          Revision
0PGP03-ZR-0050      Radiation Protection Program                                  14
0PGP03-ZR-0052      ALARA Program                                                  18
0PRP07-ZR-0001      ALARA Engineering and Procedure Review                        4
0PRP07-ZR-0010      Radiation Work Permits/Radiological Work ALARA Reviews 38
Procedures
Number                  Title                                                        Revision
0PRP07-ZR-0033          Radiological Briefings                                      7
0PRP07-ZR-0034          Radiological Risk Management                                5
Conduct of Operations for Radiation Protection, Chapter 18: 4
ALARA Planning
Audits and Self-Assessments
Number                      Title                                                  Date
18-15289-1                  Snapshot Self-Assessment using NRC 71124, Att. 2      02/28/2019
MN-19-0-107465              Radiation Protection Department Annual Evaluation      02/26/2019
SOER 85-3/ SOER 01-1        Excessive Personnel Radiation Exposures; Unplanned    12/05/2018
Radiation Exposures
Radiation Work Permits
Number        Title                                                                  Revision
2018-1-296    1RE21 - Transfer Cart Repair in the FHB / RCB Fuel Transfer Canals 0
including RP Surveys and Decontamination
2018-1-296    1RE21 - Transfer Cart Repair in the FHB / RCB Fuel Transfer Canals 1
including RP Surveys and Decontamination
2018-2-129    2RE19 - Steam Generator-Primary Side Support and Equipment              0
Setup/Tear Down (HRA) - Medium Radiological Risk
2018-2-130    2RE19 - Steam Generator-Primary Side Manway/Inserts Removal            0
              (LHRA) - High Radiological Risk
2018-2-131    2RE19 - Steam Generator-Primary Side Nozzle Dams (LHRA) - High 0
Radiological Risk
2018-2-131    2RE19 - Steam Generator-Primary Side Nozzle Dams (LHRA) - High 1
Radiological Risk
2018-2-132    2RE19 - Steam Generator-Eddy Current Testing (LHRA) - High              0
Radiological Risk
2018-2-133    2RE19 - Steam Generator-Re-Install Primary Side Manway (HRA) -          0
Medium Radiological Risk
2018-2-135    2RE19 - Steam Generator-Secondary Side Inspections (HRA)                0
ALARA In-Progress Reviews
Review
Number    Title                                                                  Date
249        Stud Detensioning                                                      10/11/2018
250        HP Job Coverage                                                        10/12/2018
ALARA In-Progress Reviews
Review
Number    Title                                                              Date
254        HP Job Coverage in High Radiation Areas                            10/21/2018
255        Request PMPI to provide craft support for the removal and          10/22/2018
installation of mechanical snubbers per 0PMP04-SN-0001 in support
of snubber testing
257        Contingency for Repairs to Unit 1 Fuel Handling Building Side Fuel  10/25/2018
Transfer System
259        Fuel Movement/Reactor Containment Building (RCB)                    10/28/2018
ALARA Reviews
Number        Title                                                          Date
18-276-4      ALARA Review: 2RE19 Snubber Inspections                          03/02/2018
18-276-4      ALARA Close Out Review: 2RE19 Snubber Inspections                05/24/2018
18-276-8      ALARA Review: 2RE19 Steam Generator Inspections, Revision 1 04/04/2018
18-276-8      ALARA Close Out Review: 2RE19 Steam Generator Inspections        05/24/2018
18-7926-4    ALARA Review: 1RE21 Non-Rapid Refuel                            10/02/2018
18-7926-5    ALARA Review: 1RE21 Flow Accelerated Corrosion Inspections - 09/12/2018
In Service Inspections
18-7926-6    ALARA Review: 1RE21 Room 003 Activities                          09/26/218
19-234        ALARA Review: Dry Cask Storage                                    01/16/2019
19-234        ALARA Review: Initial DCS Campaign - Dry Cask Storage            01/25/2019
Supplement 1
Miscellaneous
Documents
Number                Title                                                      Date
Refuel Outage 1RE20: ALARA Report                          09/06/2017
Refuel Outage 2RE18: ALARA Report                          05/18/2017
Refuel Outage 2RE19: ALARA Report                          07/18/2018
71124.04Occupational Dose Assessment
Condition Reports
CR-2017-21141        CR-2018-2745      CR-2018-3052      CR-2018-4574      CR-2018-6875
CR-2018-8097        CR-2018-8247      CR-2018-10111    CR-2018-10591      CR-2018-10771
CR-2018-14460        CR-2018-14735    CR-2018-15144    CR-2019-1215      CR-2019-1254
Procedures
Number                  Title                                                      Revision
0PGP03-ZR-0048          Personnel Dosimetry Program                                20
0PGP03-ZR-0050          Radiation Protection Program                              14
0PRP02-ZR-0007          Evaluation of Intakes                                      15
0PRP02-ZR-0010          Personnel Exposure Investigation                          11
0PRP02-ZR-0013          Determination of Skin Dose                                10
0PRP02-ZR-0017          Dose to the Embryo/Fetus                                  3
0PRP02-ZX-0022          Non-Routine Dosimetry Issue and Control                    12
0PTP04-ZC-0047          Calibration of the Siemens Environmental Systems Limited / 15
Thermo Electron Corporation Electronic Personal Dosimeter
Audits and Self-Assessments
Number      Title                                                              Date
100555-0    Mirion Technologies (GDS), Inc. Onsite NVLAP Assessment Report    01/09/2018
Snapshot Assessment: Dosimetry Program 2018                        12/04/2018
Snapshot Self-Assessment using NRC Inspection                      02/19/2019
Procedure 71124.04 Occupational Dose Assessment Criteria
Personnel Exposure Records
2017-07            2017-28            2017-29          2017-30          2017-49
2018-08            2018-09            2018-10          2018-11          2018-23
2018-24            2018-35            2018-40          2018-41          2018-42
2018-43            2018-44            2018-45
71152-Issue Follow-up
Condition Reports
CR-2008-9639            CR-2019-893              CR-2019-1762        CR-2019-1954
CR-2019-2357
Work Authorization Numbers
335148                  572175                    576480              604273
606453                  607307
Procedures
Number                Title                                                    Revision
0PMP04-EW-0001A      Essential Cooling Water Pump Maintenance (Product-        7
Lubricated Bearing Design)
0POP02-EW-0001        Essential Cooling Water Operations                        79
Miscellaneous
Documents                                                                      Revision
Number                Title                                                    or Date
VTD-H127-0006        24 VSN Centrifugal Pump Installation and Operation      6
Manual
DCP 06-15147-45      Replace Essential Cooling Water Pump 2B                  02/26/2009
4OA5.1 Other Activities (IP 60854, IP 60855, IP 60857)
Condition Reports
CR-2018-14418          CR-2018-14718            CR-201814770        CR-2019-540
CR-2019-630            CR-2019-631              CR-2019-665          CR-2019-706
CR-2019-816
Procedures
Number                Title                                                    Revision
0PEP02-ZM-0012        Fuel Selection for Dry Cask Storage                      0
0DCS03-ZO-0002        HI-STORM and MPC Pre-Use Inspections                      1
0DCS03-ZO-0003        MPC Loading Operations                                    4
0DCS03-ZO-0004        MPC Closure Operations                                    1
0DCS03-ZO-0005        MPC Transfer Operations                                  2
0DCS03-ZO-0007        MPC Unloading Operations                                  1
0DCS03-ZO-0001        HI-STORM Transport Operations                            2
0DCS03-ZO-0008        DCS Abnormal Response                                    1
PI-OP-HLTC-H-01      PCI Closure Welding of MPC Procedure                      3
GQP - 9.2            PCI Liquid Penetrant Procedure                            10
GQP - 9.6            PCI Visual Examination of Welds Procedure                18
0PGP03-ZX-0002        Condition Reporting Process                              52
0PQP01-ZA-0003        Vendor Overview Activities (numerous)                    9
0PRP07-ZR-0036        Radiological Controls for Dry Cask Storage                0
N/A                  ALARA Review Package                                      0
0DCS01-ZA-0001        Dry Cask Storage Program Implementation                  0
Procedures
Number        Title                                                        Revision
0DCS02-ZN-0002 10CFR72.48 Screening and Evaluations                        0
WPS 8 MN-GTAW  ASME Section XI Welding Procedure Specification              7
WPS 8 MC-GTAW  ASME Section XI Welding Procedure Specification              16
PI-CNSTER-OP-  Closure Welding of Holtec Multi-Purpose Canisters            3
HLTC-H-01
0PEP02-ZM-012  Fuel Selection for Dry Cask Storage                          0
Design Basis
Documents
Number        Title                                                        Revision
HI-2114830    Final Safety Analysis Report on the HI-STORM FW MPC          5
Storage System
N/A            Certificate of Compliance No. 1032                          2
2.212        STP ISFSI 10 CFR 72.212 Report                              0
Miscellaneous
Documents                                                                Revision
Number        Title                                                      or Date
2.48 Screen  Initial Issue of STP ISFSI 10 CFR 72.212 Report            0
2.48 Eval    Initial Issue of STP ISFSI 10 CFR 72.212 Report            0
2.48 Eval    Non-Mechanistic Tipover Analysis for STP                  0
VTI B056404    Design Report Stainless Steel Gate Cask Channel            0
58171-14-107  Whiting Corp Seismic Analysis Derived Values for 150 ton  04/13/2015
Crane
5817-14-050    Seismic Analysis for STP 150 ton Crane                    0
CC09978        FHB Crane Seismic Analysis Decoupling Evaluation          0
B05315-0005    Seismic Stability HI-STORM/HI-TRAC Stack-up at STP        8
B05315-0003    STP Low Profile Transporter Analysis                      4
B05315-00062  Time History Generation for STP                            5
B05315-00066  Dynamic Analysis of HI-TRAC in Cask Wash-down area        3
B05315-00068  Dynamic Analysis of HI-TRAC in Cask Loading Pool          2
B05315-00069  Structural evaluation of Cask Loading and wash-down        1
areas
B05315-00071  Structural evaluation of Cask Loading Pool Pedestal        3
B05315-00073  Structural analysis of FHB Truck Bay Slab                  1
B05315-00076  Safety Analysis of VCT Stability and Structural Evaluation 0
Miscellaneous
Documents                                                              Revision
Number              Title                                              or Date
N/A                CK0001 - Fuel Selection for Dry Cask Storage      08/30/2018
N/A                CK0002 - Fuel Selection for Dry Cask Storage      08/30/2018
N/A                CK0003 - Fuel Selection for Dry Cask Storage      08/30/2018
N/A                CK0004 - Fuel Selection for Dry Cask Storage      08/30/2018
N/A                CK0005 - Fuel Selection for Dry Cask Storage      08/30/2018
RRTI 2319-11R0      Response to Request for Technical Information      02/12/2019
50.59 Screen 13-    Fuel Handling Building Cask Loading Pool (CLP) and 02/27/2018
6991-1 Supp 5 & 13- Cask Connecting Channel (CCC) Gate and Liner
6991-2 Supp 6      Modification
DCP 13-6991-1      Design Report Stainless Steel Gate Cask Connecting 10/08/2015
Supp. 0            Channel
WO No. 96009469    HI Storm Overpack #6                              01/15/2019
G. Powell                                        1
The following items are requested for the
Occupational Radiation Safety Inspection
at South Texas Project
Dates of Inspection: 03/18/2019 to 03/22/2019
Integrated Report 2019001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before Monday, March 04, 2019.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.02 should be in a file/folder titled
2-A, applicable organization charts in file/folder 2-B, etc.
The information should be provided in electronic format or a secure document management
service. If information is placed on a secured document management system, please ensure
the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the
inspectors will have access to the information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Bernadette Baca at 817-200-1235 or via
e-mail at Bernadette.Baca@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:          March 26, 2018
: [[contact::A. List of contacts and telephone numbers for ALARA program personnel]], as well as the
Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell
numbers are appropriate, then please include them as well.
B. Applicable organization charts including position or job titles. Please include as
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], self-assessments, LARs, and LERs, written since the date of last
inspection, focusing on ALARA
D. Procedure index for ALARA Program procedures and other related disciplines.
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
2. ALARA Planning
3. ALARA Reviews
4. ALARA Committee
5. Radiation Work Permit Preparation
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of last inspection, related to the ALARA
program, including exceeding RWP Dose Estimates.
NOTE: These lists should include a description of the condition that provides
sufficient detail that the inspectors can ascertain the regulatory impact, the
significance level assigned to the condition, the status of the action (e.g., open,
working, closed, etc.) and the search criteria used. Please provide in document
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
: [[contact::H. List of work activities (RWPs) greater than 1 rem]], since date of last inspection,
including the original dose estimates and actual doses accrued. (Excel format
preferred). Please provide all revisions/changes, as well as any related RWPs that
support the work activity.
 
ML19128A334
SUNSI Review            ADAMS:            Non-Publicly Available      Non-Sensitive  Keyword:
By: NTaylor              Yes  No        Publicly Available            Sensitive      NRC-002
OFFICE            SRI:DRP/B        RI:DRP/B      C:DRS/OB        C:DRS/IPAT    C:DRS/EB1    C:DRS/EB2
NAME                ASanchez        JChoate        GWerner          RKellar        VGaddy      JDrake
SIGNATURE              AAS            JMC            GEW            RLK            VGG          JFD
DATE                05/08/19      05/03/2019    04/30/2019      04/30/2019    04/30/2019    04/29/2019
OFFICE            C:DNMS/CHP      C:DRS/RCB      BC:DRP/B
NAME                GWarnick        NMakris        NTaylor
SIGNATURE            GXW              NJM            NHT
DATE              05/06/2019        4/29/19        5/8/19
}}
}}

Latest revision as of 11:58, 18 December 2019

NRC Integrated Inspection Report 05000498/2019001; 05000499/2019001, and Independent Spent Fuel Storage Inspection 07201041/2019001
ML19128A334
Person / Time
Site: South Texas, 07201041  STP Nuclear Operating Company icon.png
Issue date: 05/08/2019
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Gerry Powell
South Texas
References
IR 2019001
Download: ML19128A334 (33)


Text

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000498/2019001; 05000499/2019001, AND INDEPENDENT SPENT FUEL STORAGE INSPECTION 07201041/2019001

Dear Mr. Powell:

On March 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your South Texas Project Electric Generating Station, Units 1 and 2. On April 11, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

One of these findings involved a violation of NRC requirements.

The inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at South Texas Project Electric Generating Station, Units 1 and 2.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at South Texas Project. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket Nos. 05000498; 05000499 and 07201041 License Nos. NPF-76 and NPF-80 Enclosure:

Inspection Report 05000498/2019001; 05000499/2019001 and 07201041/2019001 w/attachment: NRC Request for Information

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s): 05000498; 05000499 and 07201041 License Number(s): NPF-76 and NPF-80 Report Number(s): 05000498/2019001; 05000499/2019001, and 07201041/2019001 Enterprise Identifier: I-2019-001-0004 and 1-2019-001-0082 Licensee: STP Nuclear Operating Co.

Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, TX 77483 Inspection Dates: January 1, 2019, to March 31, 2019 Inspectors: B. Baca, Health Physicist J. Choate, Resident Inspector A. Sanchez, Senior Resident Inspector L. Brookhart, Senior ISFSI Inspector, FCDB C. Smith, Reactor Inspector, DRS, EB1 O. Masnyk Bailey, Health Physicist, RI, DIRHB M. Learn, Reactor Engineer, RIII, MCID R. Edwards, Senior Health Physicist, RIII, MCID Approved By: Nicholas H. Taylor Chief, Project Branch B Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a quarterly inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in report sections:

71153.

List of Findings and Violations Failure to Implement the Procedure for Equipment Failures Cornerstone Significance Cross-cutting Report Aspect Section Initiating Events Green [H.12] - Avoid 71152 FIN 05000499/2019-01 Complacency Problem Closed Identification and Resolution The inspectors identified a Green finding for the licensees failure to implement the procedure for the failure of a plant generation risk high risk component. Specifically, the licensee failed to implement and follow Procedure WCG-0008, Preventing Recurring Equipment Problems (PREP), Revision 7, following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve, FCV-553.

Failure to Provide Adequate Procedural Guidance for a Surveillance Test Cornerstone Significance Cross-cutting Report Aspect Section Initiating Events Green [H.12] - Avoid 71152 NCV 05000499/2019-02 Complacency Problem Closed Identification and Resolution The inspectors documented a Green self-revealed NCV for the failure to provide an adequate procedure for a Unit 2 qualified display processing system (QDPS) surveillance procedure that resulted in unnecessary troubleshooting, unnecessary replacement of properly operating circuit cards, and placing the loop 2 over-temperature delta-T, over-pressure delta-T, and low Tavg feedwater isolation bistables into a TRIPPED condition, a half-trip condition for the reactor. Following an investigation, the licensee discovered that incorrect biases were inputted into the QDPS surveillance procedure.

Additional Tracking Items Type Issue number Title Inspection Status Procedure LER 05000498/2017-002-00 Unit 1 Condition Prohibited by 71153 Closed Technical Specifications due to Follow-up Inoperable Control Room of Events Envelope Makeup Filtration System Heating Coil LER 05000498/2018-001-00 Unit 1 Main Steam Safety Valve 71153 Closed As Left Settings Outside of Follow-up Required Range Contrary to of Events Technical Specifications due to Inadequate Procedure

PLANT STATUS

Unit 1 operated at rated thermal power for the entire inspection period.

Unit 2 began the inspection period at rated thermal power. On March 2, 2019, while performing main turbine governor valve testing at 90 percent power, a procedural error resulted in an unexpected decrease in reactor power to 86 percent power. The reactor was returned back to rated thermal power on March 3, 2019, and remained there for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment Partial Walkdown (IP Section 02.01)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, train B chemical and volume control system during train A centrifugal charging pump maintenance on January 2, 2019
(2) Unit 2, turbine driven auxiliary feedwater system with elevated unit trip risk during north bus outage on March 1, 2019
(3) Unit 2, train C emergency core cooling system during train B emergency diesel generator maintenance on March 13, 2019
(4) Unit 2, train A essential chilled water system during train B essential chilled water system maintenance on March 16, 2019
(5) Unit 2, train A essential cooling water system during train C essential cooling water maintenance on March 22, 2019

71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 2, safety injection pump cubicles, Fire Area 35 on February 2, 2019
(2) Units 1 and 2, balance of plant diesel generator rooms and turbine generator building switchgear rooms, Fire Areas 78 and 90 on February 26, 2019
(3) Unit 1, auxiliary feedwater pump cubicles, Fire Areas 48, 49, 50, and 51 on February 27, 2019
(4) Unit 1, train C essential cooling water intake structure, Fire Area 55 on March 22, 2019
(5) Unit 1, train C vital switchgear room, battery room, 125 vdc distribution room, and motor generator room, Fire Areas 52 through 54 on March 26, 2019

71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)

The inspectors evaluated internal flooding mitigation protections in the Unit 1, train B essential cooling water pump room on March 26, 2019.

71111.07A - Heat Sink Performance Annual Review (IP Section 02.01)

The inspectors evaluated readiness and performance of:

(1) Unit 1, train C emergency diesel generator jacket water and lube oil heat exchangers the week of January 14, 2019
(2) Unit 2, train B essential chilled water cooler the week of March 12, 2019

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

The inspectors observed and evaluated licensed operator performance in the Unit 1 control room during a secondary side electro-hydraulic leak which resulted in the closure of the 13 west reheat stop valve to the low pressure turbine on January 9, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated Unit 1 operations in the simulator during a loss of coolant accident followed by a loss of offsite power on February 27, 2019.

71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Unit 1, turbine driven auxiliary feedwater pump low governor oil level that resulted in inoperability of the train on January 3, 2019
(2) Unit 1, electro-hydraulic control system leak that resulted in the closure of reheat stop valve 13 on January 9, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Units 1 and 2, planned north bus outage that resulted in entering the Configuration Risk Management Program on February 26, 2019
(2) Unit 2, planned turbine driven auxiliary feedwater pump extent of condition maintenance for connecting rod engagement on January 31, 2019
(3) Unit 1, train B essential cooling water unplanned pump replacement February 13 through 19, 2019
(4) Unit 1, elevated risk due to unplanned entry into the Configuration Risk Management Program for exceeding the train B essential chilled water system 7 day limiting condition for operation due to maintenance activities on March 10, 2019

71111.15 - Operability Determinations and Functionality Assessments Sample Selection (IP Section 02.01)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 1, turbine driven auxiliary feedwater pump following the identification of a degraded conduit for the remote trip solenoid on January 16, 2019
(2) Unit 1, train B control room envelope heating, ventilation, and air conditioning damper controller on February 6, 2019
(3) Unit 2, cask loading pool leakage on February 12, 2019
(4) Unit 1, train B emergency diesel generator shutdown when taken out of emergency mode on March 11, 2019
(5) Unit 2, turbine driven auxiliary feedwater pump experiencing high main oil pump discharge pressure on March 15, 2019

71111.19 - Post Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)

The inspectors evaluated the following post maintenance tests:

(1) Unit 1, train C emergency diesel generator following fuel oil storage tank level transmitter replacement on January 31, 2019
(2) Unit 2, turbine driven auxiliary feedwater pump following failure of connecting rod on January 31, 2019
(3) Unit 1, train B essential cooling water pump following pump replacement on March 4, 2019
(4) Unit 1, train B emergency diesel generator following replacement of shutdown air solenoid valve on March 13, 2019
(5) Units 1 and 2, diesel fire pump number 3 following replacement of the pump impeller, diesel starter solenoid, and pump packing on March 18, 2019
(6) Unit 2, train C residual heat removal pump following control room handswitch replacement on March 19, 2019

71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: In Service Testing (IST) (IP Section 03.01)

(1) Unit 1, turbine driven auxiliary feedwater pump surveillance test on January 24, 2019
(2) Unit 1, train B essential cooling water system surveillance test on February 14, 2019

Surveillance Testing (IP Section 03.01) (4 Samples)

(1) Unit 2, train B emergency diesel generator surveillance test on February 12, 2019
(2) Unit 2, train A auxiliary feedwater regulating valve dynamic pressure test on March 4, 2019
(3) Unit 1, train B emergency diesel generator fast start surveillance on March 13, 2019
(4) Unit 1, train C emergency diesel generator fast start surveillance on March 15,

RADIATION SAFETY

71124.02 - Occupational ALARA Planning and Controls Radiological Work Planning (IP Section 02.01)

The inspectors evaluated the licensees radiological work planning by reviewing the following activities:

  • 1RE21 - Reactor Cavity and Head Activities
  • 1RE21 - Fuel Transfer Canal Activities
  • 2RE19 - Reactor Cavity and Head Activities
  • 2RE19 - Steam Generator Activities Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02)

(1 Sample)

The inspectors evaluated dose estimates and exposure tracking. The inspectors reviewed the following ALARA planning documents:

  • 18-276-7 ALARA Review Package: 2RE19 Non-Rapid Refuel, Revision 1
  • 18-7926-4 ALARA Review Package: 1RE21 Non-Rapid Refuel Additionally, the inspectors reviewed the following radiological outcome evaluations:
  • 18-276-7 ALARA Close Out Review Package: 2RE19 Non-Rapid Refuel, Revision 1
  • 18-7926-4 ALARA Close Out Review Package: 1RE21 Non-Rapid Refuel
  • 18-7926-4 ALARA Close Out Review Package Supplement 1: 1RE21 Non-Rapid Refuel

71124.04 - Occupational Dose Assessment External Dosimetry (IP Section 02.02)

The inspectors evaluated the external dosimetry program implementation.

Internal Dosimetry (IP Section 02.03) (1 Sample)

The inspectors evaluated the internal dosimetry program implementation.

Three contaminated workers' whole body counts were reviewed for potential uptakes. The licensee had no positive whole body counts indicating an internal uptake of radioactive material.

The licensee had no occurrences to observe or review in-vitro internal monitoring or dose assessments performed using air sampling and DAC-hr. monitoring.

Source Term Categorization (IP Section 02.01) (1 Sample)

The inspectors evaluated the licensees characterization of the source term and use of scaling factors for the use of hard-to-detect radionuclide activity.

Special Dosimetric Situations (IP Section 02.04) (1 Sample)

The inspectors evaluated special dosimetric situations, as detailed below.

  • The inspectors reviewed approximately five declared pregnant workers' documentation from January 1, 2017, to March 21, 2019.
  • The licensee did not perform any EDEX assessments from July 31, 2017, to March 21, 2019.
  • The inspectors reviewed one shallow dose equivalent assessment (Condition Report 2019-1215).
  • The inspectors reviewed the licensee's use of Mirion neutron thermoluminescent dosimetry and electronic alarming dose meters (Model EPDN2) for neutron dosimetry. The inspector compared radiological surveys, RWP and WAN assignments, and worker exposures to confirm the licensee is appropriately assigning neutron dose to occupational workers.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below.

=

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (Units 1 and 2, January -

December 2018

(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (Units 1 and 2, January - December 2018
(3) IE04: Unplanned Scrams with Complications Sample (Units 1 and 2, January -

December 2018)

71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 2, pressurizer master controller card failure, Condition Report 2017-658.

Inspectors reviewed the plant response to the event, operator actions, corrective actions, and interviewed licensee personnel.

(2) Unit 1, low head safety injection breaker failure, Condition Report 2017-20444.

Inspectors reviewed the apparent cause investigation, operability evaluation, and corrective actions.

(3) Unit 2, train C steam generator main control valve failed low in automatic mode, Condition Report 2017-17659. Inspectors reviewed the plant response to the event, operator actions, maintenance and engineering troubleshooting repair of the issue, interviewed licensee personnel and corrective actions.
(4) Unit 2, train D qualified display processing system calibration procedure that resulted in exceeding the Technical Specification allowed outage time and placed the bistables into a trip condition, Condition Reports 2016-11346 and 2016-11257. The inspectors reviewed the prompt investigation, interviewed maintenance and engineering personnel, and evaluated the corrective actions.

71153 - Follow-up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports which can be accessed at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) LER 05000498/2017-002-00, "Unit 1 Condition Prohibited by Technical Specifications due to Inoperable Control Room Envelope Makeup Filtration System Heating Coil,"

on January 22, 2018:

(2) LER 05000498/2018-001-00, "Unit 1 Main Steam Safety Valve As Left Settings Outside of Required Range Contrary to Technical Specifications due to Inadequate Procedure," on December 4, 2018:

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 60854 - Preoperational Testing of an Independent Spent Fuel Storage Inspection (ISFSI)60855 - Operation of an ISFSI at Operating Plants 60857 - Review of 10 CFR 72.48 Evaluations Inspections of dry cask storage operations were conducted at STP on January 21-25 and on January 28 through February 2, 2019, by inspectors from NRC Regions I, III, and IV. The STP ISFSI was licensed as a general 10 CFR Part 72 license and utilized the Holtec HI-STORM FW Certificate of Compliance (COC) 1032 Amendment 2 and HI-STORM FW Final Safety Analysis Report (FSAR) Revision 5.

In prior NRC ISFSI inspections at STP (ADAMS Accession Nos. ML18221A385 and ML19032A079), the NRC staff documented the observations and evaluations of many of the required pre-operational demonstrations from License Condition No. 9 of the COC performed by STP. Those inspections included an in-depth review of the licensees dry cask storage program implementation into existing 10 CFR Part 50 programs to support ISFSI operations at the site. The purpose of the NRC inspections in January and February 2019 were to:

(1) observe and evaluate the remaining pre-operational demonstrations and training exercises which STP was required to complete prior to commencing loading operations, and
(2) observe and evaluate the licensees first loading operations. On January 21-25, 2019, the NRC staff observed STP complete the remaining demonstrations listed in License Condition No. 9 of the COC to allow use of the Holtec HI-STORM FW storage system. South Texas Project had successfully completed all the required pre-operations activities and fully demonstrated that the procedures, programs, and training related to those dry cask storage operations had been successfully integrated into its site operations. The subsequent week, from January 28 to February 2, 2019, NRC staff observed the licensees first canister loading operations.

The ISFSI activities specifically reviewed during the on-site inspections and during in-office review included:

1. Evaluated and observed dry run demonstrations from License Condition No. 9 of the

COC, which included: preparation of the canister storage system for fuel loading; loading a dummy fuel assembly into the canister with appropriate independent verification; selection and verification of the specific fuel assemblies to ensure type conformance; remote installation of the canister lid; removal of the canister from the spent fuel pool; and unloading operations that included remotely removing a lid from the canister to support fuel unloading.

2. Reviewed the licensees structural and seismic calculations for dry cask storage

operations which included: over-head spent fuel building crane with loaded Transfer Cask (TC); loaded TC in the spent fuel pools loading area; loaded TC in the canister wash-down area for processing operations; loaded TC in the stack-up configuration to support downloading of a canister into the concrete over-pack; loaded over-pack on low-profile transporter; and loaded over-pack being carried by the vertical cask transporter to the ISFSI pad.

3. Reviewed two 10 CFR 72.48 safety evaluations performed by the licensee for changes

made to the ISFSI program since the previous NRC ISFSI inspection per Inspection Procedure 60857.

4. Reviewed spent fuel documentation for the first canister to verify the fuel met all

Appendix B Technical Specifications requirements for storage.

5. Evaluated and observed fuel selection and fuel loading operations associated with dry

fuel storage canister No. 1.

6. Evaluated and observed welding of the canister, non-destructive testing of the welds,

forced helium drying, helium backfill, and heavy load movements from the spent fuel pool to the sites vertical cask transporter.

7. Reviewed the licensee's loading, processing, and heavy load procedures associated

with their current dry fuel storage campaign.

8. Reviewed the licensees corrective action programs condition reports of issues identified

for resolution since the previous NRC ISFSI inspection performed in November 2018.

9. Evaluated and observed the licensees radiation protection implementation during the

dry run and loading operations.

10. Evaluated and observed the licensees implementation of foreign material exclusion process during the dry run and loading operations.

The inspectors did not identify any issues of concerns requiring documentation.

INSPECTION RESULTS

Failure to Implement the Procedure for Equipment Failures Cornerstone Significance Cross-cutting Report Aspect Section Initiating Events Green [H.12] - Avoid 71152 FIN 05000499/2019-01 Complacency Problem Closed Identification and Resolution The inspectors identified a Green finding for the licensees failure to implement the procedure for the failure of a plant generation risk (PGR) high risk component. Specifically, the licensee failed to implement and follow Procedure WCG-0008, Preventing Recurring Equipment Problems (PREP), Revision 7, following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve FCV-553.

Description:

On June 19, 2017, Unit 2 reactor operators responded to control room alarms and indications for steam flow/ feed flow mismatch for steam generator 2C. Operators identified that the steam generator 2C main feedwater regulating valve had failed closed and that steam generator level was decreasing for that steam generator. Operators entered the appropriate off-normal procedure and within 28 seconds regained control of steam generator levels by manually controlling feedwater flow through the main feedwater regulating valve. As a result of the failure, reactor power lowered to approximately 97 percent, average reactor coolant system temperature (Tavg) reached a maximum valve of 592.9 degrees F (normally Tavg is 592.0), and steam generator 2C narrow range level lowered to 52.8 percent (normally 70 percent).

Following the failure, engineering and maintenance discussed and implemented changing out a suspected nuclear tracker-driver (NTD) circuit card. This type of activity in the 7300 control cabinets is a high risk evolution and required a work activity risk review to help ensure no mistakes were made and that operations prepared for the worst case outcome. South Texas Project (STP) has site specific operating experience where card calibration and card replacement activities have resulted in reactor trips. Engineering was confident that the NTD circuit card was the problem. Maintenance personnel suggested measuring voltage readings at various locations inside the panel to ensure the faulty card was identified, however these measurements were not taken due to engineerings position that the NTD card was faulty.

The inspectors attended the pre-job brief and observed the field work. Maintenance performed the card replacement successfully, but the issue remained. Maintenance and engineering regrouped and decided to take voltage measurements to identify the circuit card failure. Maintenance identified the nuclear control board (NCB) as the problem and replaced the NCB without issue. STP performed the high-risk evolution twice due to inadequate troubleshooting and over-reliance on engineering assumptions.

The licensee evaluated the operators response to the main feedwater regulating valve failure and engineering and maintenances response to troubleshooting and repair of the failed circuit card. The inspectors interviewed engineering and maintenance and determined that the licensee should have entered and implemented Procedure WCG-0008 following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve, FCV-553.

The procedure would have ensured the appropriate degree of rigor was applied when pursuing resolution of high risk equipment issues. Specifically, Step 1.3 states, in part, The PREP process entry criteria are: Loss of Key Equipment function/ Critical Attribute.

The failure of the main feedwater regulating valve was a loss of key equipment function. The PREP process would have engaged more management oversight, directed the gathering of facts through Addendum 3, Preventing Recurring Equipment Problems (PREP) checklist, and may have led to the development of a troubleshooting plan.

Corrective Actions: The licensee replaced the failed card and developed a lessons-learned presentation for engineering to use human performance tools, validate assumptions, and challenge recommendations (use technical conscience).

Corrective Action References: Condition Reports 2017-17659 and 2019-4368

Performance Assessment:

Performance Deficiency: The failure to enter and use station Procedure WCG-0008, Preventing Recurring Equipment Problems (PREP), Revision 7, following the failure of the Unit 2 steam generator 2C normal feedwater regulating control valve, FCV-553, was a performance deficiency. Specifically, the licensee failed to enter WCG-0008 upon the failure of the main feedwater regulating valve, a loss of key equipment function due to the component being classified as a high PGR. The result of not implementing this procedure was an increased probability of tripping the reactor due to possible human error while in the 7300 control cabinet.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the human performance attribute and adversely affected the Initiating Events Cornerstone objective to limit the likelihood of events that can upset plant stability during power operations and is therefore a finding. Specifically, engineering relied on past experience and did not consider entering and implementing the PREP process procedure, which would have applied more rigor to troubleshooting and resolving the issue.

Significance: The inspectors used IMC 0609, Appendix A, Exhibit 1, Initiating Events Screening Questions, issued June 19, 2012, to determine the finding was of very low safety significance, Green. Specifically, one finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.

Cross-cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

Failure to Provide Adequate Procedural Guidance for a Surveillance Test Cornerstone Significance Cross-cutting Report Aspect Section Initiating Events Green [H.12] - Avoid 71152 NCV 05000499/2019-02 Complacency Problem Closed Identification and Resolution The inspectors documented a Green self-revealed NCV for the failure to provide an adequate procedure for a Unit 2 qualified display processing system (QDPS) surveillance procedure that resulted in unnecessary troubleshooting, unnecessary replacement of properly operating circuit cards, and placing the loop 2 over-temperature delta-T (OTDT), over-pressure delta-T (OPDT), and low Tavg feedwater isolation bistables into a TRIPPED condition, a half-trip condition for the reactor. Following an investigation, the licensee discovered that incorrect biases were inputted into the QDPS surveillance procedure.

Description:

On September 15, 2016, operations declared the loop 2 OTDT, OPDT, and the low Tavg feedwater isolation inoperable for loop calibration surveillance testing and bypassed the channel per Technical Specifications 3.3.1, items 8 and 9, action 6, and 3.3.2, item 5F, action 20. If not restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the channel must be placed into a TRIPPED condition. During the performance of Surveillance Procedure 0PSP05-RC-0420, Delta T and T average loop 2 Set Calibration (T-0420), Revision 53, maintenance identified an out-of-tolerance condition. Engineering recommended maintenance perform a QDPS output calibration using Procedure 0PMP08-AM-APCD2, QDPS Train D SGWLCS/TAS Input/Output Calibration, Revision 10. During this calibration, the licensee again identified an out-of-tolerance condition which could not be resolved. The licensee performed troubleshooting and began to replace circuit boards in the train D QDPS cabinet without success. On September 18, 2016, the bistables for the OTDT, OPDT, and Low Tavg feedwater isolation were placed into a TRIPPED condition as required by technical specifications.

The licensee subsequently discovered that an engineering error resulted in incorrect biases being placed into the Calibration Procedures 0PSP05-RC-0420 and 0PMP08-AM-APCD2.

The two procedures were corrected with the proper biases and completed satisfactorily. The manual substitution of the resistance temperature detector (RTD) biases in the two calibration procedures had never been performed before and, due to the complex nature of the QDPS system, only three people on site could perform and peer check these biases. The licensee performed a prompt investigation and a review for organizational learnings. The licensee determined that the engineer made changes to the procedure to account for the two RTD operation, but failed to get the values peer checked for accuracy. This failure led to excessive out-of-service time, unnecessary QDPS maintenance, and having to place the loop 2 protection bistables into a TRIPPED condition, i.e. half reactor trip.

Corrective Actions: The licensee immediately corrected the procedures and re-performed the calibrations and satisfactorily performed analog channel operational testing. The licensee also developed a lessons-learned document and has an outstanding action to develop an engineering guideline when either unit is in two RTD operation.

Corrective Action References: Condition Reports 2016-11346, 2016-11257, 2019-4367

Performance Assessment:

Performance Deficiency: The failure to provide adequate procedures for maintenance on safety-related equipment was a performance deficiency. Specifically, engineering supplied inaccurate information to calibration procedures for the Unit 2 loop 2 and train D QDPS that resulted in unnecessary maintenance in QDPS and TRIPPED bistables associated with OTDT, OPDT, and low Tavg feedwater isolation which caused Unit 2 to be in a half reactor trip.

Screening: The inspectors determined the performance deficiency was more than minor because it is associated with the Procedure Quality attribute and adversely affected the Initiating Event Cornerstone objective to limit the likelihood of events that can upset plant stability during power operations and is therefore a finding. Specifically, the loop 2 bistables associated with OTDT, OPDT, and low Tavg were placed into a TRIPPED condition which placed Unit 2 one spurious reactor trip signal away from a true reactor trip due to the performance deficiency.

Significance: The inspectors used IMC 0609, Appendix A, Exhibit 1, Initiating Events Screening Questions, issued June 19, 2012, to determine the finding was of very low safety significance, Green. Specifically, one finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.

Cross-cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools. The inspectors determined that the finding had a crosscutting aspect in the area of human performance associated with avoiding complacency. Specifically, engineering provided inaccurate biases for the procedure changes without utilizing appropriate error reduction tools [H.12].

Enforcement:

Violation: Technical Specification 6.8.1.a requires, in part, that written procedures shall be established, implemented, and maintained in accordance with Appendix A of Regulatory Guide 1.33, Revision 2, February 1978, Section 8.b.(L) reactor protection system tests and calibrations. The licensee established Procedure 0PSP05-RC-0420, Delta T and T average loop 2 Set Calibration (T-0420), Revision 53 to meet the Regulatory Guide 1.33 requirement.

The Unit 2 data package loop 2 set 2 (T-0420) provides appropriate biases to be used to test and calibrate the loop.

Contrary to the above, on September 15, 2016, the licensee failed to ensure that the Unit 2 data package loop 2 set 2 (T-0420) provided the appropriate biases to be used to test and calibrate the loop. Specifically, engineering failed to provide accurate biases for procedures used for surveillance and calibration of the OTDT, OPDT, and low Tavg feedwater isolation trip setpoints.

Enforcement Action: This violation is being treated as a Non-Cited Violation, consistent with Section 2.3.2 of the Enforcement Policy.

Minor Violation 71153 Follow-up of Events Minor Violation: Technical Specification 3.7.7, Control Room Makeup and Cleanup Filtration System, states, in part, that if one Control Room Makeup and Cleanup Filtration System is inoperable, it must be restored to operable in Modes 1, 2, 3, and 4 within 7 days, or be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Contrary to the above, between September 27 and November 24, 2017, the licensee failed to restore one control room makeup and cleanup filtration system to operable. Specifically, the licensee failed to properly jumper a circuit board for the control room makeup and cleanup filtration system heating coil.

Screening: The inspectors determined the performance deficiency was minor. The inspectors found this violation to be minor in accordance with IMC 0612 Appendix B, Issue Screening, issued December 13, 2017, because the violation did not satisfy any of the four More-than-Minor screening questions.

Enforcement:

This failure to comply with Technical Specification 3.7.7 constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

Licensee-Identified Non-Cited Violation 71153 Follow-up of Events This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a Non-Cited Violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification 3.7.1.1, Safety Valves, states, in part, that if one or more main steam line code safety valves are inoperable, they must be restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or reduce the Power Range Neutron Flux High Trip Setpoint or be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Contrary to the above, between October 2 and 6, 2018, the licensee failed to restore two of the Unit 1 steam generator B main steam safety valves to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, failed to reduce the Power Range Neutron Flux High Trip Setpoint, and failed to be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Specifically, the licensee failed to identify that two of the Unit 1 Steam Generator B main steam safety valves were left outside of their Technical Specification required lift settings following testing.

Significance: Green.

The inspectors determined the performance deficiency was more than minor because it adversely affected the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The inspectors assessed the significance of the finding using Exhibit 2, Mitigating Systems Screening Questions, of IMC 0609, Appendix A, Significance Determination Process (SDP) for Findings At-Power, issued June 19, 2012, and determined this finding did not represent an actual loss of function. Therefore, the inspectors determined the finding was of very low safety significance (Green).

Corrective Action References: Condition Reports 2018-11811 and 2019-4374

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 11, 2019, the inspector presented the quarterly resident inspector inspection results to Mr. G. T. Powell, President and Chief Executive Officer, and other members of the licensee staff.
  • On March 21, 2019, the inspector presented the baseline radiation safety inspection to Mr. J. Connolly, Executive Vice President and Chief Nuclear Officer, and other members of the licensee staff.
  • On March 21, 2019, the inspector presented the pre-operational dry run and first loading inspection to Mr. J. Connolly, Executive Vice President and Chief Nuclear Officer, and members of the licensee staff.

DOCUMENTS REVIEWED

71111.01-Adverse Weather

Procedures

Number Title Revision

0PGP03-ZV-0001 Severe Weather Plan 21

71111.04-Partial Equipment Alignment

Condition Reports

CR-2018-2825

Procedures

Number Title Revision

0POP02-AF-0001 Auxiliary Feedwater 52

0POP02-SI-0002 Safety Injection System Initial Lineup 45

0PSP03-CH-0001 Essential Chilled Water Pump 11A(21A) Inservice Test 22

0POP02-EW-0001 Essential Cooling Water Operations 80

Drawings

Number Title Revision

5R179F05007#1 Chemical and Volume Control System 52

5S142F00024#1 Auxiliary Feedwater 13

5N129F05015#2 Safety Injection System 21

5V119V10001#2 HVAC Essential Chilled Water System 33

5R289F05038#2 Essential Cooling Water System Train 2B 20

71111.05-Fire Protection

Procedures

Number Title Revision

0FHB35-FP-0306 Fire Preplan Fuel Handling Building Train B SI/CSS Cubicle 2

0FHB35-FP-0307 Fire Preplan Fuel Handling Building Train A SI/CSS Cubicle 2

0PGP03-ZF-0011 STPEGS Fire Brigade 18

0DMB99-FP-0920 Fire Preplan for Make-Up Demineralizer Building 2

0TGB78-FP-0703 Fire Preplan Turbine Generator Building BOP Diesel 3

Generator Building

0TGB90-FP-0702 Fire Preplan for Turbine Generator Building 4.16 KV and 3

Electrical Equipment Rooms

Procedures

Number Title Revision

0TGB90-FP-0710 Fire Preplan Turbine Generator Building 13.8 KV Switchgear 3

Room and Cable Vault

0IVC48-FP-0403 Fire Preplan Isolation Valve Cubicle Pump Room Train C 3

0IVC49-FP-0402 Fire Preplan Isolation Valve Cubicle Pump Room Train B 3

0IVC50-FP-0401 Fire Preplan Isolation Valve Cubicle, Pump Room Train A 2

0IVC51-FP-0400 Fire Preplan Isolation Valve Cubicle, Pump Room Train D 2

0EAB-FP-0052 Fire Preplan Electrical Auxiliary Building ESF Switchgear 4

Room Train C

0EAB-FP-0053 Fire Preplan Electrical Auxiliary Building, Channel IV Battery 3

and Distribution Room

0EAB-FP-0054 Fire Preplan Electrical Auxiliary Building, Motor Generator 3

Room

1ECW55-FP-0602 Fire Preplan Essential Cooling Water Intake Structure Pump 5

Room Train C

71111.07A - Annual Heat Sink

Procedures

Number Title Revision

0PMP05-CH-0003 York Chiller Inspection & Maintenance 300 Tons 13

0PGP03-ZE-0080 Essential Cooling Water System Reliability Program 2

Work Authorization Numbers

443062

71111.11-Simulator/Control Room Observation

Condition Reports

CR-2019-364 CR-2019-423

Procedures

Number Title Revision

0POP02-EH-0001 Main Turbine EHCS 77

0POP07-MS-0003 Main Turbine Steam Inlet Valve Test 29

P&ID

Number Title Revision

6S109F00017#1 P&ID Main Steam 28

P&ID

Number Title Revision

7T089F10001#1 P&ID EH Fluid System 57

71111.12-Maintenance Effectiveness

Condition Reports

CR-2015-18885 CR-2017-15182 CR-2017-23544 CR-2018-995

CR-2018-8533 CR-2018-1108 CR-2018-12813 CR-2018-15270

CR-2018-15273

Work Authorization Numbers

499003 519391 521829 532330

540499 548908 568084 603714

Procedures

Number Title Revision

0PMP04-AF-0002 Auxiliary Feedwater Pump Turbine Maintenance 41

0PMP04-AF-0003 Auxiliary Feedwater Turbine Trip Throttle Valve Maintenance 36

0PSP03-AF-0007 Auxiliary Feedwater Pump 14(24) Inservice Test 5

Drawings

Number Title Revision

6S109F00017#1 Piping and Instrumentation Diagram Main Steam 28

7T089F10001#1 Piping and Instrumentation Diagram Electro Hydraulic Fluid 51

System

71111.13-Maintenance Risk and Emergent Work

Procedures

Number Title Revision

0PGP03-ZA-0091 Configuration Risk Management Program 14

0POP01-ZO-0006 Risk Management Actions (RMAs) 27

Work Activity Risk (WAR)

2804

RasCal Sequences

3331 3336 3337

71111.15-Operability Determinations and Functionality Assessments

Condition Reports

CR-2019-47 CR-2019-347 CR-2019-1377 19-2777

19-637

Drawings

STI. Number Title Date

31390502 Cabinet-Control (Assembly Engine Control) 02/27/1978

298485 Control Schematic (Starting Sequence Control) 09/29/1977

71111.19-Post Maintenance Testing

Condition Reports

CR-2018-7676 CR-2018-9443 CR-2018-14727 CR-2019-111

CR-2019-893 CR-2019-1762 CR-2019-2357 CR-2019-2435

CR-2019-2777 CR-2019-1020

Work Authorization Numbers

545649 565703 571744 571827

2175 576480 602665 604208

604273 606453 573948 605423

Procedures

Number Title Revision

0PSP04-DG-0004 Standby Diesel Generator Fuel Oil Storage Tank Inspection 9

0PMP08-DO-9109 ESF Diesel Generator Fuel Oil Storage Tank Level 3

Calibration

0PSP03-EW-0011 Essential Cooling Water Pump 1B(2B) Reference Values 27

Measurement

0PSP03-AF-0007 Auxiliary Feedwater Pump 14(24) Inservice Test 51

0POP07-FP-0001 Diesel Fire Pump Test 18

0PTP03-FP-0106 Fire Protection Water System Functional Test 20

0PSP03-DG-0002 Standby Diesel 12(22) Operability Test 64

Miscellaneous

Documents

Number Title Revision

VTD-T343-0001 Installation and Service Instructions for Tuthill Cartridge 1

Pumps

VTD-P104-0011 Patterson Operation and Maintenance Manual for Double 0

Suction Split Case Pumps

71111.22-Surveillances

Condition Reports

CR-2019-975 CR-2019-1762

Procedures

Number Title Revision

0POP02-AF-0001 Auxiliary Feedwater 52

0PSP03-AF-0007 Auxiliary Feedwater Pump 14(24) Inservice Test 51

0PMP05-ZE-0425 MOV Diagnostic Testing (VOTES) - Rising Stem Valves 2

0PEP07-AF-0003 Dynamic Stroke Testing of Train A Auxiliary Feed Motor 3

Operated Feed Regulating Valve

0PSP03-DG-0003 Standby Diesel 13(23) Operability Test 63

0PMP07-DG-0001 Standby Diesel Recording M&TE Installation 5

0PSP03-DG-0002 Standby Diesel 12(22) Operability Test 64

0PSP03-EW-0018 Essential Cooling Water System Train B Testing 55

71124.02 - Occupational ALARA Planning and Controls

Condition Reports

CR-2018-3840 CR-2018-3991 CR-2018-4050 CR-2018-4125

CR-2018-4555 CR-2018-4860 CR-2018-5849 CR-2018-6071

CR-2018-8097 CR-2018-9179 CR-2018-9284 CR-2018-11217

CR-2018-12339 CR-2018-13572 CR-2019-234 CR-2018-1066

Procedures

Number Title Revision

0PGP03-ZR-0050 Radiation Protection Program 14

0PGP03-ZR-0052 ALARA Program 18

0PRP07-ZR-0001 ALARA Engineering and Procedure Review 4

0PRP07-ZR-0010 Radiation Work Permits/Radiological Work ALARA Reviews 38

Procedures

Number Title Revision

0PRP07-ZR-0033 Radiological Briefings 7

0PRP07-ZR-0034 Radiological Risk Management 5

Conduct of Operations for Radiation Protection, Chapter 18: 4

ALARA Planning

Audits and Self-Assessments

Number Title Date

18-15289-1 Snapshot Self-Assessment using NRC 71124, Att. 2 02/28/2019

MN-19-0-107465 Radiation Protection Department Annual Evaluation 02/26/2019

SOER 85-3/ SOER 01-1 Excessive Personnel Radiation Exposures; Unplanned 12/05/2018

Radiation Exposures

Radiation Work Permits

Number Title Revision

2018-1-296 1RE21 - Transfer Cart Repair in the FHB / RCB Fuel Transfer Canals 0

including RP Surveys and Decontamination

2018-1-296 1RE21 - Transfer Cart Repair in the FHB / RCB Fuel Transfer Canals 1

including RP Surveys and Decontamination

2018-2-129 2RE19 - Steam Generator-Primary Side Support and Equipment 0

Setup/Tear Down (HRA) - Medium Radiological Risk

2018-2-130 2RE19 - Steam Generator-Primary Side Manway/Inserts Removal 0

(LHRA) - High Radiological Risk

2018-2-131 2RE19 - Steam Generator-Primary Side Nozzle Dams (LHRA) - High 0

Radiological Risk

2018-2-131 2RE19 - Steam Generator-Primary Side Nozzle Dams (LHRA) - High 1

Radiological Risk

2018-2-132 2RE19 - Steam Generator-Eddy Current Testing (LHRA) - High 0

Radiological Risk

2018-2-133 2RE19 - Steam Generator-Re-Install Primary Side Manway (HRA) - 0

Medium Radiological Risk

2018-2-135 2RE19 - Steam Generator-Secondary Side Inspections (HRA) 0

ALARA In-Progress Reviews

Review

Number Title Date

249 Stud Detensioning 10/11/2018

250 HP Job Coverage 10/12/2018

ALARA In-Progress Reviews

Review

Number Title Date

254 HP Job Coverage in High Radiation Areas 10/21/2018

255 Request PMPI to provide craft support for the removal and 10/22/2018

installation of mechanical snubbers per 0PMP04-SN-0001 in support

of snubber testing

257 Contingency for Repairs to Unit 1 Fuel Handling Building Side Fuel 10/25/2018

Transfer System

259 Fuel Movement/Reactor Containment Building (RCB) 10/28/2018

ALARA Reviews

Number Title Date

18-276-4 ALARA Review: 2RE19 Snubber Inspections 03/02/2018

18-276-4 ALARA Close Out Review: 2RE19 Snubber Inspections 05/24/2018

18-276-8 ALARA Review: 2RE19 Steam Generator Inspections, Revision 1 04/04/2018

18-276-8 ALARA Close Out Review: 2RE19 Steam Generator Inspections 05/24/2018

18-7926-4 ALARA Review: 1RE21 Non-Rapid Refuel 10/02/2018

18-7926-5 ALARA Review: 1RE21 Flow Accelerated Corrosion Inspections - 09/12/2018

In Service Inspections

18-7926-6 ALARA Review: 1RE21 Room 003 Activities 09/26/218

19-234 ALARA Review: Dry Cask Storage 01/16/2019

19-234 ALARA Review: Initial DCS Campaign - Dry Cask Storage 01/25/2019

Supplement 1

Miscellaneous

Documents

Number Title Date

Refuel Outage 1RE20: ALARA Report 09/06/2017

Refuel Outage 2RE18: ALARA Report 05/18/2017

Refuel Outage 2RE19: ALARA Report 07/18/2018

71124.04Occupational Dose Assessment

Condition Reports

CR-2017-21141 CR-2018-2745 CR-2018-3052 CR-2018-4574 CR-2018-6875

CR-2018-8097 CR-2018-8247 CR-2018-10111 CR-2018-10591 CR-2018-10771

CR-2018-14460 CR-2018-14735 CR-2018-15144 CR-2019-1215 CR-2019-1254

Procedures

Number Title Revision

0PGP03-ZR-0048 Personnel Dosimetry Program 20

0PGP03-ZR-0050 Radiation Protection Program 14

0PRP02-ZR-0007 Evaluation of Intakes 15

0PRP02-ZR-0010 Personnel Exposure Investigation 11

0PRP02-ZR-0013 Determination of Skin Dose 10

0PRP02-ZR-0017 Dose to the Embryo/Fetus 3

0PRP02-ZX-0022 Non-Routine Dosimetry Issue and Control 12

0PTP04-ZC-0047 Calibration of the Siemens Environmental Systems Limited / 15

Thermo Electron Corporation Electronic Personal Dosimeter

Audits and Self-Assessments

Number Title Date

100555-0 Mirion Technologies (GDS), Inc. Onsite NVLAP Assessment Report 01/09/2018

Snapshot Assessment: Dosimetry Program 2018 12/04/2018

Snapshot Self-Assessment using NRC Inspection 02/19/2019

Procedure 71124.04 Occupational Dose Assessment Criteria

Personnel Exposure Records

2017-07 2017-28 2017-29 2017-30 2017-49

2018-08 2018-09 2018-10 2018-11 2018-23

2018-24 2018-35 2018-40 2018-41 2018-42

2018-43 2018-44 2018-45

71152-Issue Follow-up

Condition Reports

CR-2008-9639 CR-2019-893 CR-2019-1762 CR-2019-1954

CR-2019-2357

Work Authorization Numbers

335148 572175 576480 604273

606453 607307

Procedures

Number Title Revision

0PMP04-EW-0001A Essential Cooling Water Pump Maintenance (Product- 7

Lubricated Bearing Design)

0POP02-EW-0001 Essential Cooling Water Operations 79

Miscellaneous

Documents Revision

Number Title or Date

VTD-H127-0006 24 VSN Centrifugal Pump Installation and Operation 6

Manual

DCP 06-15147-45 Replace Essential Cooling Water Pump 2B 02/26/2009

4OA5.1 Other Activities (IP 60854, IP 60855, IP 60857)

Condition Reports

CR-2018-14418 CR-2018-14718 CR-201814770 CR-2019-540

CR-2019-630 CR-2019-631 CR-2019-665 CR-2019-706

CR-2019-816

Procedures

Number Title Revision

0PEP02-ZM-0012 Fuel Selection for Dry Cask Storage 0

0DCS03-ZO-0002 HI-STORM and MPC Pre-Use Inspections 1

0DCS03-ZO-0003 MPC Loading Operations 4

0DCS03-ZO-0004 MPC Closure Operations 1

0DCS03-ZO-0005 MPC Transfer Operations 2

0DCS03-ZO-0007 MPC Unloading Operations 1

0DCS03-ZO-0001 HI-STORM Transport Operations 2

0DCS03-ZO-0008 DCS Abnormal Response 1

PI-OP-HLTC-H-01 PCI Closure Welding of MPC Procedure 3

GQP - 9.2 PCI Liquid Penetrant Procedure 10

GQP - 9.6 PCI Visual Examination of Welds Procedure 18

0PGP03-ZX-0002 Condition Reporting Process 52

0PQP01-ZA-0003 Vendor Overview Activities (numerous) 9

0PRP07-ZR-0036 Radiological Controls for Dry Cask Storage 0

N/A ALARA Review Package 0

0DCS01-ZA-0001 Dry Cask Storage Program Implementation 0

Procedures

Number Title Revision

0DCS02-ZN-0002 10CFR72.48 Screening and Evaluations 0

WPS 8 MN-GTAW ASME Section XI Welding Procedure Specification 7

WPS 8 MC-GTAW ASME Section XI Welding Procedure Specification 16

PI-CNSTER-OP- Closure Welding of Holtec Multi-Purpose Canisters 3

HLTC-H-01

0PEP02-ZM-012 Fuel Selection for Dry Cask Storage 0

Design Basis

Documents

Number Title Revision

HI-2114830 Final Safety Analysis Report on the HI-STORM FW MPC 5

Storage System

N/A Certificate of Compliance No. 1032 2

2.212 STP ISFSI 10 CFR 72.212 Report 0

Miscellaneous

Documents Revision

Number Title or Date

2.48 Screen Initial Issue of STP ISFSI 10 CFR 72.212 Report 0

2.48 Eval Initial Issue of STP ISFSI 10 CFR 72.212 Report 0

2.48 Eval Non-Mechanistic Tipover Analysis for STP 0

VTI B056404 Design Report Stainless Steel Gate Cask Channel 0

58171-14-107 Whiting Corp Seismic Analysis Derived Values for 150 ton 04/13/2015

Crane

5817-14-050 Seismic Analysis for STP 150 ton Crane 0

CC09978 FHB Crane Seismic Analysis Decoupling Evaluation 0

B05315-0005 Seismic Stability HI-STORM/HI-TRAC Stack-up at STP 8

B05315-0003 STP Low Profile Transporter Analysis 4

B05315-00062 Time History Generation for STP 5

B05315-00066 Dynamic Analysis of HI-TRAC in Cask Wash-down area 3

B05315-00068 Dynamic Analysis of HI-TRAC in Cask Loading Pool 2

B05315-00069 Structural evaluation of Cask Loading and wash-down 1

areas

B05315-00071 Structural evaluation of Cask Loading Pool Pedestal 3

B05315-00073 Structural analysis of FHB Truck Bay Slab 1

B05315-00076 Safety Analysis of VCT Stability and Structural Evaluation 0

Miscellaneous

Documents Revision

Number Title or Date

N/A CK0001 - Fuel Selection for Dry Cask Storage 08/30/2018

N/A CK0002 - Fuel Selection for Dry Cask Storage 08/30/2018

N/A CK0003 - Fuel Selection for Dry Cask Storage 08/30/2018

N/A CK0004 - Fuel Selection for Dry Cask Storage 08/30/2018

N/A CK0005 - Fuel Selection for Dry Cask Storage 08/30/2018

RRTI 2319-11R0 Response to Request for Technical Information 02/12/2019

50.59 Screen 13- Fuel Handling Building Cask Loading Pool (CLP) and 02/27/2018

6991-1 Supp 5 & 13- Cask Connecting Channel (CCC) Gate and Liner

6991-2 Supp 6 Modification

DCP 13-6991-1 Design Report Stainless Steel Gate Cask Connecting 10/08/2015

Supp. 0 Channel

WO No. 96009469 HI Storm Overpack #6 01/15/2019

G. Powell 1

The following items are requested for the

Occupational Radiation Safety Inspection

at South Texas Project

Dates of Inspection: 03/18/2019 to 03/22/2019

Integrated Report 2019001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Monday, March 04, 2019.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.02 should be in a file/folder titled

2-A, applicable organization charts in file/folder 2-B, etc.

The information should be provided in electronic format or a secure document management

service. If information is placed on a secured document management system, please ensure

the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the

inspectors will have access to the information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Bernadette Baca at 817-200-1235 or via

e-mail at Bernadette.Baca@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: March 26, 2018

A. List of contacts and telephone numbers for ALARA program personnel, as well as the

Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell

numbers are appropriate, then please include them as well.

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, LARs, and LERs, written since the date of last

inspection, focusing on ALARA

D. Procedure index for ALARA Program procedures and other related disciplines.

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Planning

3. ALARA Reviews

4. ALARA Committee

5. Radiation Work Permit Preparation

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of last inspection, related to the ALARA

program, including exceeding RWP Dose Estimates.

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. List of work activities (RWPs) greater than 1 rem, since date of last inspection,

including the original dose estimates and actual doses accrued. (Excel format

preferred). Please provide all revisions/changes, as well as any related RWPs that

support the work activity.

ML19128A334

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NTaylor Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:DRP/B RI:DRP/B C:DRS/OB C:DRS/IPAT C:DRS/EB1 C:DRS/EB2

NAME ASanchez JChoate GWerner RKellar VGaddy JDrake

SIGNATURE AAS JMC GEW RLK VGG JFD

DATE 05/08/19 05/03/2019 04/30/2019 04/30/2019 04/30/2019 04/29/2019

OFFICE C:DNMS/CHP C:DRS/RCB BC:DRP/B

NAME GWarnick NMakris NTaylor

SIGNATURE GXW NJM NHT

DATE 05/06/2019 4/29/19 5/8/19