IR 05000498/2022003

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000498/2022003 and 05000499/2022003
ML22286A176
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/21/2022
From: Patricia Vossmar
NRC/RGN-IV/DORS
To: Gerry Powell
South Texas
Powell G
References
IR 2022003
Download: ML22286A176 (21)


Text

October 21, 2022

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 INTEGRATED INSPECTION REPORT 05000498/2022003 AND 05000499/2022003

Dear G. T. Powell:

On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project Electric Generating Station, Units 1 and 2. On October 4, 2022, the NRC inspectors discussed the results of this inspection with Kym Harshaw, Executive Vice President and Chief Nuclear Officer and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding did not involve a violation of NRC requirements.

If you disagree with a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at South Texas Project Electric Generating Station, Units 1 and 2. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Vossmar, Patricia on 10/21/22 Patricia J. Vossmar, Chief Projects Branch A Division of Operating Reactor Safety Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000498 and 05000499 License Numbers: NPF-76 and NPF-80 Report Numbers: 05000498/2022003 and 05000499/2022003 Enterprise Identifier: I-2022-003-0009 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, TX 77483 Inspection Dates: June 1, 2022, to September 30, 2022 Inspectors: S. Hedger, Senior Emergency Preparedness Inspector G. Kolcum, Senior Resident Inspector J. O'Donnell, Senior Health Physicist C. Stott, Resident Inspector H. Strittmatter, Emergency Preparedness Inspector W. Tejada, Physical Security Inspector B. Tharakan, Technical Assistant Approved By: Patricia J. Vossmar, Chief Projects Branch A Division of Operating Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Provide Oversight Leads to Multiple Examples of Switchyard Insulator Flashovers Cornerstone Significance Cross-Cutting Report Aspect Section Initiating Events Green None (NPP) 71152A FIN 05000498,05000499/2022003-01 Open/Closed A self-revealed Green finding was identified for the licensees failure to adequately implement requirements of procedure 0PGP03-XS-0001, Switchyard Management, revision 11, to ensure adequate oversight of switchyard component maintenance. Specifically, the licensee failed to ensure that coatings of switchyard insulators were maintained. This condition resulted in flashovers which caused a de-energization of the switchyard south electrical bus and starting of safety-related equipment.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000499/2022-001-00 Automatic Actuation of 71153 Closed Emergency Diesel Generator due to Lockout of Switchyard Electrical Bus

PLANT STATUS

Units 1 and 2 began the inspection period at rated thermal power and remained there for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, train B emergency diesel generator when train C was inoperable for maintenance on July 19, 2022
(2) Unit 2, train B emergency diesel generator when train C was inoperable for maintenance on July 19, 2022
(3) Unit 2, auxiliary feedwater system when underground piping was inspected during the week of August 22, 2022
(4) Unit 1, train A emergency diesel generator essential cooling water on August 23, 2022
(5) Unit 2, train A emergency diesel generator essential cooling water on August 23, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2, train A 124VDC on September 15, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 2, train A power cable vault in the electrical auxiliary building on July 6, 2022
(2) Unit 2, train A emergency diesel generator building on July 28, 2022
(3) Unit 1, mechanical auxiliary building service areas and boron recycle system holdup tanks on August 11, 2022
(4) Unit 1, train C isolation valve cubicle pump room on August 29, 2022
(5) Unit 2, train D isolation valve cubicle pump room on September 1, 2022

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during a simulated fire at the Unit 1, train B emergency diesel generator local control panel on July 27, 2022.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 1, train A emergency diesel generator the week of September 5, 2022

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

(1 Sample)

(1) The inspectors observed troubleshooting and maintenance on Unit 2, train B control room envelope heating, ventilation, and air conditioning on August 29, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed training and evaluated an operations crews response to various plant alarm scenarios on July 18, 2022.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 2, planned entry into configuration risk management program for train A 125VDC battery surveillance testing on July 6, 2022
(2) Unit 2, planned white risk due to maintenance during the week of July 12, 2022
(3) Unit 1, planned white risk due to maintenance during the week of July 18, 2022
(4) Unit 2, planned yellow risk due to maintenance during the week of August 1, 2022
(5) Unit 2, planned yellow risk due to maintenance during the week of August 22, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 2, train C emergency diesel generator failed to complete cooldown circuit on July 18, 2022
(2) Unit 1, train C emergency diesel generator fuel oil fitting leak on July 21, 2022
(3) Unit 1, qualified display processing system communication board failure on July 25, 2022
(4) Unit 2, qualified display processing systems digital processing unit C alarms on September 4, 2022

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

(1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 1, train A emergency diesel generator expansion joint replacement on August 23, 2022.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (8 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) Unit 2, train C emergency diesel generator on July 18, 2022
(2) Unit 2, train C emergency diesel generator on July 21, 2022
(3) Unit 2, train C essential cooling water traveling screen on August 28, 2022
(4) Unit 2, train C control room envelope heating, ventilation, and air conditioning following maintenance on August 28, 2022
(5) Unit 2, train C emergency diesel generator following exhaust maintenance on August 28, 2022
(6) Unit 1, stator coolant pressure control valve on August 29, 2022
(7) Unit 2, train B essential chiller following maintenance on August 31, 2022
(8) Unit 2, fuel handling building exhaust filter on September 10, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (4 Samples)

(1) Unit 2, train A emergency diesel operability test on July 5, 2022
(2) Unit 1, train B low head safety injection pump surveillance test on July 17, 2022
(3) Unit 1, train B residual heat removal pump surveillance test on July 17, 2022
(4) Unit 1, train D auxiliary feedwater pump surveillance on July 27, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 1, train B high head safety injection pump in service test on July 17, 2022

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise conducted on July 20, 2022. The exercise scenario simulated high vibrations on the main turbine, a control rod ejection, degradation in fuel integrity, a large break loss of cooling accident, and a failure of electrical penetration seal to containment. This led to a monitored release to the environment.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following Emergency Plan changes and risk significant implementing procedure changes:

STPEGS Emergency Plan, revision 0, based on standard NUREG-0654, revision 2 (effective April 2022)

Emergency Action Level Technical Basis Manual, revision 0 The inspectors also evaluated the 10 CFR 50.54(q) emergency plan change process and practices between July 1, 2021, and July 5, 2022. This involved review of a selection of additional licensee screening and evaluation documentation. These evaluations and reviews do not constitute NRC approval.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) the licensee's simulator-based licensed operator training evolution that involved a steam generator power operated relief valve failure, loss of feedwater, an anticipated transient without scram and an Alert notification on August 1,

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (10 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1) Unit 2, mechanical auxiliary building failed fuel radiation monitor
(2) Unit 2, safety injection trains A, B, and C radiation monitors
(3) Unit 2, fuel handling building personnel contamination friskers
(4) Unit 2, spent fuel pool floor air sampler
(5) Unit 2, personnel whole body contamination monitors at the egress of 41' radiologically controlled area access control point
(6) Unit 2, small article monitors at the egress of 41' radiologically controlled area access control point
(7) Unit 2, personnel gamma exit monitors at the egress of 41' radiologically controlled area access control point
(8) Unit 1, portable ion chambers staged for use in the mechanical auxiliary building
(9) Unit 1, reactor containment building personnel airlock area radiation monitor
(10) Unit 1, fuel handling building, train A exhaust radiation monitor

Calibration and Testing Program (IP Section 03.02) (13 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) Ludlum Model 9-3 ion chamber, serial number (SN) 345262, February 22 2022
(2) Thermo Electron Corp. small article monitor, SN 1212SAM12130, August 24, 2021
(3) Eberline AMS-4, ID No. 400-00099-004, May 25, 2022
(4) Ludlum Model 177 sample counter, ID No. 400-00012-046, August 17, 2022
(5) Ludlum 78 digital stretch scope, SN267956, June 7, 2022
(6) Bicron Microrem survey meter, SN 1252, February 9, 2022
(7) Canberra ARGOS-5AB, SN 1306-150, October 7, 2021
(8) Canberra GEM-5, SN 1306-155, August 2, 2022
(9) Unit 1, chemical volume control system letdown radiation transmitter, N1RART8039, October 16, 2020
(10) Unit 2, steam generator blowdown radiation transmitter, N2RART8043, January 27, 2021
(11) Unit 2, reactor building high range area monitor calibration (RT-8051), October 29, 2019
(12) Unit 2, reactor building atmosphere monitor calibration (RT-8011), July 8, 2021
(13) Unit 2, chemical volume control system letdown radiation transmitter, N2RART8039, October 7, 2021 Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (3 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Unit 1, liquid waste processing system radiation monitor No. 1, RT-8038
(2) Unit 2, main steam line 'A' radiation monitor, A2RA-RT-8046
(3) Unit 2, mechanical auxiliary building unit vent wide range gas monitor, N2RA-RT-8010B

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage (IP Section 03.01)

The inspectors evaluated the licensees performance in controlling, labeling, and securing the following radioactive materials:

(1) Unit 2, radioactive waste storage pad
(2) old steam generator storage facility
(3) warehouse 44

Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)

The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality:

(1) Unit 2, filters and demineralizers, ALPS demineralizer system, and spent resin liner transfer/fill system
(2) Unit 1, low activity spent resin system

Waste Characterization and Classification (IP Section 03.03) (3 Samples)

The inspectors evaluated the following characterization and classification of radioactive waste:

(1) Units 1 and 2, process filters
(2) Unit 1, high activity spent resin
(3) Unit 2, low activity spent resin

Shipping Records (IP Section 03.05) (4 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1) LSA II, filters, STP-1-21-040, July 29, 2021
(2) Type A, contaminated equipment, STP-0-20-045, September 29, 2020
(3) Type B, dewatered bead resin, STP-2-22-008, April 13, 2022
(4) Type B, dewatered bead resin, STP-1-21-023, June 9,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05) ===

(1) Unit 1 (July 1, 2021, through June 30, 2022)
(2) Unit 2 (July 1, 2021, through June 30, 2022)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2021, through June 30, 2022)
(2) Unit 2 (July 1, 2021, through June 30, 2022)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2021, through June 30, 2022)
(2) Unit 2 (July 1, 2021, through June 30, 2022)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) July 1, 2021, through June 30, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13)

(1 Sample)

(1) July 1, 2021, through June 30, 2022 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) July 1, 2021, through June 30, 2022 In April 2022, the ANS was changed such that it relies on Integrated Public Alert &

Warning System (IPAWS) as the primary means of public notification. Therefore, siren testing results will not be reported as part of this performance indicator in following quarters. ANS reliability will be assessed during normal baseline inspections.

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) switchyard insulator flashovers on January 6, and April 13, 2022.

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Follow up (IP Section 03.01)

(1) The inspectors evaluated LER 05000499/2022-001-00, Automatic Actuation of Emergency Diesel Generator due to Lockout of Switchyard Electrical Bus and licensees response on January 6,

INSPECTION RESULTS

Failure to Provide Oversight Leads to Multiple Examples of Switchyard Insulator Flashovers Cornerstone Significance Cross-Cutting Report Aspect Section Initiating Events Green None (NPP) 71152A FIN 05000498,05000499/2022003-01 Open/Closed A self-revealed Green finding was identified for the licensees failure to adequately implement requirements of procedure 0PGP03-XS-0001, Switchyard Management, revision 11, to ensure adequate oversight of switchyard component maintenance. Specifically, the licensee failed to ensure that coatings of switchyard insulators were maintained. This condition resulted in flashovers which caused a de-energization of the switchyard south electrical bus and starting of safety-related equipment.

Description:

On January 6, 2022, the licensee experienced a de-energization of the switchyard south electrical bus due to leakage current discharging to ground, otherwise known as a flashover. The unexpected de-energization resulted in a loss of power to the Unit 2 train B engineered safety features (ESF) 4160V bus. This caused an automatic start of the Unit 2 train B emergency diesel generator due to the undervoltage condition on the ESF bus.

The licensee found the south bus had de-energized due to an electrical flashover event as a result of an insulator on the south bus. The event was reported in licensee event report 2022-001 on March 4, 2022.

On April 13, 2022, the licensee again experienced a de-energization of the switchyard south electrical bus due to a flashover. No automatic actuation of any emergency diesel generator occurred because the Unit 2 train B ESF 4160V bus was temporarily aligned to the Unit 1 standby transformer to support maintenance. The cause was determined to be two different insulators but of the same two-piece design as the first occurrence.

The insulators in the licensees electrical switchyard are owned and maintained by the transmission distribution service provider. This entity had the insulator from the first flashover event analyzed. A report was provided to the licensee that concluded the insulator had areas where the room-temperature-vulcanizing silicone rubber coating was degraded and that large sections of the insulator had lost its hydrophobicity, or its ability to repel moisture, and instead became hydrophilic, having an affinity to spread water across its surface to maximize water coverage. A combination of contamination of the surface of the insulator combined with wetting of a hydrophilic insulator surface was reported as the likely cause the flashover.

The licensee performed a cause evaluation which stated that the equipment that failed was a transmission distribution service provider owned piece of equipment and that the service provider also performed all maintenance. When the inspectors questioned when the last time the insulator had been recoated or replaced, the licensee stated that they did not have a record for the last time either activity had been performed and neither did the transmission distribution service provider.

The inspectors researched licensee switchyard procedures and found statements in 0PGP03-XS-0001, Switchyard Management, revision 11, which indicate that the licensee is responsible for performing switchyard PM [preventive maintenance] oversight. The inspectors determined that the licensee failed to provide adequate oversight over preventive maintenance of switchyard components as evidenced by the lack of records for previous insulator maintenance and lack of scheduled future maintenance activities.

Corrective Actions: The licensee ensured that the transmission distribution service provider replaced all switchyard insulators of similar build as the ones which caused the flashovers.

The licensee then washed and commenced recoating the remaining insulators in the switchyard. The licensee also began working with the transmission distribution service provider to establish a preventive maintenance schedule for tracking insulator coatings and a monitoring program to gauge when environmental conditions warrant washing the insulators.

Corrective Action References: condition reports (CR) 2022-235, CR 2022-3717, and CR 2022-9617

Performance Assessment:

Performance Deficiency: The licensees failure to adequately implement requirements in procedure 0PGP03-XS-0001, Switchyard Management, revision 11, to ensure adequate oversight of switchyard component maintenance was a performance deficiency. Specifically, the licensee failed to ensure that coatings of switchyard insulators were maintained. This degraded condition resulted in flashovers which caused a de-energization of the switchyard south electrical bus and starting of safety-related equipment.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Initiating Events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the licensee failed to oversee the preventive maintenance of switchyard component which caused flashovers of three different insulators.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power.

Specifically, in Exhibit 1, "Initiating Events Screening Questions," the inspectors determined that this finding is of very low safety significance (Green), because it did not cause a reactor trip and the loss of mitigating equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.

Cross-Cutting Aspect: Not Present Performance. No cross-cutting aspect was assigned to this finding because the inspectors determined the finding did not reflect present licensee performance. The licensee was in the process of planning and scheduling corrective actions for the first flashover when the second flashover occurred.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 17, 2022, the inspectors presented the emergency preparedness exercise inspection results to G. T. Powell, President and Chief Executive Officer and other members of the licensee staff.

On August 19, 2022, the inspectors presented the public radiation safety inspection results to Kym Harshaw, Executive Vice President and Chief Nuclear Officer, and other members of the licensee staff.

On October 4, 2022, the inspectors presented the integrated inspection results to Kym Harshaw, Executive Vice President and Chief Nuclear Officer and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.04 Calculations EC6066 Class 1E125V DC Battery Float & Equalize Voltage

71111.04 Corrective Action CR-YYYY-NNNN 2022-8

Documents

Resulting from

Inspection

71111.04 Drawings 0-E-AAAA-01, #1, Main One Line Diagram

  1. 2

71111.04 Drawings 9-E-DJAA-01, #1, Single Line Diagram, 125V dc Class 1E Distributions

  1. 2 Switchboard, E1A11 (Channel I)

71111.04 Drawings 9-E-DJAB-01, #1, Single Line Diagram, 125V DC Class 1E Distribution

  1. 2 Switchboard, E1D11 (Channel II)

71111.04 Drawings 9-E-DJAC-01, #1, Single Line Diagram, 125V DC Class 1E Distribution

  1. 2 Switchboard, E1B11 (Channel III)

71111.04 Drawings 9-E-DJAD-01, #1, Single Line Diagram, 125V DC Class 1E Distribution

  1. 2 Switchboard, E1C11 (Channel IV)

71111.04 Drawings 9-E-DJAE-01, #1, Single Line Diagram 125V DC Class 1E Distribution Panels

  1. 2

71111.04 Drawings 9-E-DJAF-01, #1, Single Line Diagram 125V DC Class 1E Distribution Panels

  1. 2

71111.04 Procedures 4E520EQ1006 Class 1E 125V DC Control Power System

71111.04 Procedures 5N049EB111 Station Blackout

71111.05 Procedures 0DGB38-FP-0501 Fire Preplan for Diesel Generator Building, Train B 4

71111.05 Procedures 0DGB38-FP-0502 Fire Preplan for Diesel Generator Building Train A 4

71111.05 Procedures 0DGB43-FP-0507 Fire Preplan Diesel Generator Building Stairwell, Train B 4

71111.05 Procedures 0EAB02-FP-0010 Electrical Auxiliary Building, Power Cable Vault Train A 3

71111.05 Procedures 0IVC48-FP-0403 Fire Preplan Isolation Valve Cubicle Pump Room Train C 4

71111.05 Procedures 0IVC51-FP-0400 Fire Preplan Isolation Valve Cubicle, Pump Room Train D 2

71111.05 Procedures 0MAB03-FP-0130 Fire Preplan Mechanical Auxiliary Building Service Areas 6

and BRS Recycle Holdup Tanks

71111.05 Procedures 0PGP03-ZF-0001 Fire Protection Program 37

71111.05 Procedures 0PGP03-ZF-0011 STPEGS Fire Brigade 20

71111.15 Corrective Action CR-YYYY-NNNN 2022-6870, 2022-6985, 2022-7145, 2022-6280, 2022-8692

Inspection Type Designation Description or Title Revision or

Procedure Date

Documents

71111.18 Corrective Action CR-YYYY-NNNN 2022-8274

Documents

71111.19 Corrective Action CR-YYYY-NNNN 2022-6870, 2022-6985, 2021-8268, 2022-8857

Documents

71111.22 Procedures 0PSP03-AF-0007 Auxiliary Feedwater Pump 14(23) Inservice Test 61

71111.22 Procedures 0PSP03-DG-0001 Standby Diesel 11(21) Operability Test 62

71111.22 Procedures 0PSP03-RH-0002 Residual Heat Removal Pump 1B(2B) Inservice Test 21

71111.22 Procedures 0PSP03-SI-0002 Low Head Safety Injection Pump 1B(2B) Inservice Test 19

71111.22 Procedures 0PSP03-SI-0005 High Head Safety Injection Pump 1B(2B) Inservice Test 23

71114.01 Corrective Action CR-YYYY-NNNN 2020-2739, 2020-10201,20 20-11085, 2020-11781,

Documents 2021-7790, 2021-8107, 2021-8130, 2021-9220,

22-1628, 2022-4566, 2022-4857, 2022-5470

71114.01 Corrective Action CR-YYYY-NNNN 2022-7049

Documents

Resulting from

Inspection

71114.01 Procedures 0EPM04-UA-0011 Drill & Exercise Conduct and Evaluation 1

71114.01 Procedures 0EPR01-IP-0001 ERO Response 0

71114.01 Procedures 0EPR01-IP-0004 Emergency Exposure Controls 0

71114.01 Procedures 0PGP03-ZO-0057 Operator Time Critical Action Program 5

71114.01 Procedures 0POP01-ZA- Emergency Operating Procedure Generic Guidance 8

0018A

71114.01 Procedures 0POP03-ZG-0007 Plant Cooldown 97

71114.01 Procedures 0POP05-EO-E000 Reactor Trip or Safety Injection 27

71114.01 Procedures 0POP05-EO-E010 Loss Of Reactor Or Secondary Coolant 24

71114.01 Procedures 0POP05-EO- SI Termination 16

ES11

71114.01 Procedures 0POP05-EO- Containment Critical Safety Function Status Tree 4

F0005

71114.01 Procedures 0POP05-EO- Response To Low Pressurizer Level 6

FR12

71114.01 Procedures 0POP05-EO- Response To High Containment Pressure 12

FRZ1

Inspection Type Designation Description or Title Revision or

Procedure Date

71114.01 Procedures 0POP05-EO- Response To High Containment Radiation Level 3

FRZ3

71114.04 Miscellaneous 0PGP05-ZV-0010, Changes to STPEGS Emergency Action Level Technical 09/07/2021

R. 20 Basis Manual R3

Effectiveness

Evaluation,

Evaluation CR

Tracking Number:

CR# 21-7790-1

71114.04 Miscellaneous 0PGP05-ZV-0010, EP-0001.000, STPEGS Emergency Plan Change to Remove 08/31/2021

R. 20 Statement Regarding Field Use of an Single Channel

Effectiveness Analyzer

Evaluation,

Evaluation CR

Tracking Number:

CR# 21-7800-2

71114.04 Miscellaneous 0PGP05-ZV-0010, Changes Made to South Texas Project Electric Generating 09/02/2021

R. 20 Screen Station (STPEGS) Emergency Plan

Evaluation,

Evaluation CR

Tracking Number:

CR# 20-2575-115

71114.04 Miscellaneous Form 2, Elimination of the Option to Downgrade or De-escalate from 12/07/2021

Effectiveness an Emergency Classification Level (ECL)

Evaluation Form,

Evaluation CR

Tracking Number

21-8130-2

71114.04 Miscellaneous NOCXX:22035953 RE: Letter of Agreement with Luminant Power, Post 11/08/2021

Accident Analysis, NUREG-0737

71114.04 Procedures EP-0003.000 EAL Technical Basis Manual 0

71114.06 Procedures 0POP05-EO-E000 Reactor Trip or Safety Injection 27

71114.06 Procedures 0POP05-EO-E020 Faulted Steam Generator Isolation 12

71114.06 Procedures EP-0003.000 EAL Technical Basis Manual 0

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.05 Corrective Action CR-YYYY-NNNN 2020-10420, 2021-12141, 2021-689, 2022-512

Documents 2020-10473, 2021-3317, 2022-1310, 2021-6965, 2022-4236

20-11789, 2021-5896, 2022-1708, 2021-8138, 2022-6636

20-12836, 2021-6644, 2022-2963, 2021-8878, 2022-6903,

21-12749, 2021-12986

71124.05 Corrective Action CR-YYYY-NNNN 2022-8033

Documents

Resulting from

Inspection

71124.05 Procedures 0PRP05-RA-0002 Radiation Monitoring System Alarm Response 24

71124.05 Procedures 0PSP05-RA-8011 RCB Atmosphere Monitor Calibration (RT-8011) 21

71124.05 Procedures 0PSP05-RA-8050 RCB High Range Area Monitor Calibration 17

71124.05 Procedures 0PTP03-ZC-0001 Measuring and Test Equipment / Radiological 18

Instrumentation Calibration Program

71124.05 Procedures 0PTP04-ZC-0002 Calibration of the Eberline 6112 (Series) and the Ludlum 78 6

Stretch Scope

71124.05 Procedures 0PTP04-ZC-0044 Calibration of Counting Instruments 9

71124.05 Procedures 0PTP04-ZC-0052 Calibration of Handheld Survey Meters - Ion Chambers 1

71124.05 Procedures 0PTP04-ZC-0062 Maintenance Calibration of SAM Series Small Article 1

Monitors

71124.05 Procedures 0PTP04-ZC-0064 Monitor Calibration of Canberra Argos-5AB Whole Body 2

Monitors

71124.05 Procedures 0PTP04-ZC-0072 Calibration of Ludlum 9-3 Ion Chambers 0

71124.05 Procedures FIN-0001 Fix It Now Team Guideline 0

71124.05 Self-Assessments MN-20-0-108189 Quality Monitoring Report: Oversight to verify the Radiation 09/09/2020

Protection Program is reviewed annually in accordance with

CFR 20

71124.05 Self-Assessments MN-21-1-108593 Quality Monitoring Report: Oversight of chemistry sampling 10/20/2021

during shutdown activities

71124.05 Self-Assessments MN-21-1-108623 Quality Monitoring Report: Oversight activity during 1RE23 10/19/2021

to ensure RP Technicians properly maintain radiological

instrumentation

71124.05 Self-Assessments MN-21-2-108408 Quality Monitoring Report: Monitored Health Physics 04/05/2021

activities related to 2RE21

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.08 Calculations NC-5116 Old Steam Generator Storage Facility Isotopic 03/04/2013

Characterization

71124.08 Corrective Action CR-YYYY-NNNN 2020-10248, 2020-10853, 2020-11210, 2020-11211,

Documents 2020-11405, 2020-11501, 2020-11759, 2020-12434,

20-12436, 2020-12673, 2020-09976, 2021-12250,

21-01236, 2021-12636, 2021-12637, 2021-12638,

21-02188, 2021-03003, 2021-03311, 2021-03577,

21-03676, 2021-04540, 2021-00467, 2021-00509,

21-06514, 2021-07966, 2021-08509, 2021-08921,

21-09942, 2022-00158, 2022-04929

71124.08 Corrective Action CR-YYYY-NNNN 2022-8076

Documents

Resulting from

Inspection

71124.08 Miscellaneous HP 5986 Unit 2, process filter waste stream update 08/02/2020

71124.08 Miscellaneous HP 8469 Unit 2, process filter waste stream update 06/24/2021

71124.08 Miscellaneous HP10087 Unit 1, process filter waste stream update 02/24/2022

71124.08 Miscellaneous HP8728 Unit 1, high activity spent resin waste stream update 03/02/2022

71124.08 Procedures 0PGP03-ZO-0017 Radioactive Waste Process Control Program 9

71124.08 Procedures 0PGP03-ZR-0053 Radioactive Material Control Program 21

71124.08 Procedures 0POP02-WS-0002 High Integrity Container (HIC) Dewatering for Shipment and 16

Burial

71124.08 Procedures 0PRP03-ZR-0002 Radioactive Waste Shipments 28

71124.08 Procedures 0PRP03-ZR-0009 10CFR61 Sampling and Analysis Program 9

71124.08 Procedures 0PRP03-ZR-0010 Sorting and Processing of Radioactive Material 17

71124.08 Procedures 0PRP03-ZR-0011 Shipment of Radioactive Material 22

71124.08 Procedures 0PRP03-ZR-0012 Processing, Tracking and Loading of Spent Radioactive 9

Filters

71124.08 Procedures 0PRP03-ZR-0014 Onsite Staging Facility Operations 11

71124.08 Radiation 115624 Technical Specification Inventory 07/07/2021

Surveys

71124.08 Radiation 118169 Technical Specification Inventory 01/10/2022

Surveys

71124.08 Self-Assessments21-471 Snapshot Self-Assessment: STP's implementation of 02/15/2021

Inspection Type Designation Description or Title Revision or

Procedure Date

CFR Part 37 regulatory requirements

71124.08 Self-Assessments CR 20-10243 Snapshot Self-Assessment: Radwaste Assessment 12/21/2021

71124.08 Self-Assessments CR-22-3445 Snapshot Self-Assessment: Radwaste Assessment 07/11/2022

71124.08 Self-Assessments MN-21-0-108276 Quality Monitoring Report: Radioactive Waste Equipment 01/29/2021

and Systems

71124.08 Self-Assessments MN-21-0-108316 Quality Monitoring Report: 10 CFR Part 37 category 2 03/10/2021

source movement

71124.08 Self-Assessments MN-21-0-108519 Quality Monitoring Report: Radioactive Source Controls 08/18/2021

71124.08 Self-Assessments MN-21-0-108557 Quality Monitoring Report: Radiation Protection Program 09/28/2021

71124.08 Self-Assessments MN-21-0-108664 Quality Monitoring Report: 10 CFR Part 37 Program Review 11/18/2021

71124.08 Self-Assessments MN-21-1-108624 Quality Monitoring Report: Oversight of 1RE23 outage 10/21/2021

radioactive waste shipment

71124.08 Self-Assessments MN-21-2-108448 Quality Monitoring Report: 2RE21 outage dry active waste 04/19/2021

shipment

71151 Corrective Action CR-YYYY-NNNN 2022-7177

Documents

Resulting from

Inspection

71151 Miscellaneous EP-0006.000 Prompt Notification System Design Report 09/29/2021

71151 Procedures 0EPM01-IP-0001 Emergency Preparedness Program Administration 0

71151 Procedures 0EPM04-UA-0003 EP Performance Indicator Evaluation and Tracking 0

71151 Procedures 0PGP05-ZV-0013 Performance Indicator Tracking Guide 10

18