October 21, 2022
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 INTEGRATED INSPECTION REPORT 05000498/2022003 AND 05000499/2022003
Dear G. T. Powell:
On September 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project Electric Generating Station, Units 1 and 2. On October 4, 2022, the NRC inspectors discussed the results of this inspection with Kym Harshaw, Executive Vice President and Chief Nuclear Officer and other members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low safety significance (Green) is documented in this report. This finding did not involve a violation of NRC requirements.
If you disagree with a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at South Texas Project Electric Generating Station, Units 1 and 2. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Patricia J. Vossmar, Chief Projects Branch A Division of Operating Reactor Safety Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000498 and 05000499
License Numbers:
Report Numbers:
05000498/2022003 and 05000499/2022003
Enterprise Identifier:
I-2022-003-0009
Licensee:
STP Nuclear Operating Company
Facility:
South Texas Project Electric Generating Station, Units 1 and 2
Location:
Wadsworth, TX 77483
Inspection Dates:
June 1, 2022, to September 30, 2022
Inspectors:
S. Hedger, Senior Emergency Preparedness Inspector
G. Kolcum, Senior Resident Inspector
J. O'Donnell, Senior Health Physicist
C. Stott, Resident Inspector
H. Strittmatter, Emergency Preparedness Inspector
W. Tejada, Physical Security Inspector
B. Tharakan, Technical Assistant
Approved By:
Patricia J. Vossmar, Chief
Projects Branch A
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
Failure to Provide Oversight Leads to Multiple Examples of Switchyard Insulator Flashovers Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000498,05000499/2022003-01 Open/Closed None (NPP)71152A A self-revealed Green finding was identified for the licensees failure to adequately implement requirements of procedure 0PGP03-XS-0001, Switchyard Management, revision 11, to ensure adequate oversight of switchyard component maintenance. Specifically, the licensee failed to ensure that coatings of switchyard insulators were maintained. This condition resulted in flashovers which caused a de-energization of the switchyard south electrical bus and starting of safety-related equipment.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000499/2022-001-00 Automatic Actuation of Emergency Diesel Generator due to Lockout of Switchyard Electrical Bus 71153 Closed
PLANT STATUS
Units 1 and 2 began the inspection period at rated thermal power and remained there for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1, train B emergency diesel generator when train C was inoperable for maintenance on July 19, 2022
- (2) Unit 2, train B emergency diesel generator when train C was inoperable for maintenance on July 19, 2022
- (3) Unit 2, auxiliary feedwater system when underground piping was inspected during the week of August 22, 2022
- (4) Unit 1, train A emergency diesel generator essential cooling water on August 23, 2022
- (5) Unit 2, train A emergency diesel generator essential cooling water on August 23, 2022
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2, train A 124VDC on September 15, 2022.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 2, train A power cable vault in the electrical auxiliary building on July 6, 2022
- (2) Unit 2, train A emergency diesel generator building on July 28, 2022
- (3) Unit 1, mechanical auxiliary building service areas and boron recycle system holdup tanks on August 11, 2022
- (4) Unit 1, train C isolation valve cubicle pump room on August 29, 2022
- (5) Unit 2, train D isolation valve cubicle pump room on September 1, 2022
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire brigade training and performance during a simulated fire at the Unit 1, train B emergency diesel generator local control panel on July 27, 2022.
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 1, train A emergency diesel generator the week of September 5, 2022
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed troubleshooting and maintenance on Unit 2, train B control room envelope heating, ventilation, and air conditioning on August 29, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed training and evaluated an operations crews response to various plant alarm scenarios on July 18, 2022.
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 2, planned entry into configuration risk management program for train A 125VDC battery surveillance testing on July 6, 2022
- (2) Unit 2, planned white risk due to maintenance during the week of July 12, 2022
- (3) Unit 1, planned white risk due to maintenance during the week of July 18, 2022
- (4) Unit 2, planned yellow risk due to maintenance during the week of August 1, 2022
- (5) Unit 2, planned yellow risk due to maintenance during the week of August 22, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 2, train C emergency diesel generator failed to complete cooldown circuit on July 18, 2022
- (2) Unit 1, train C emergency diesel generator fuel oil fitting leak on July 21, 2022
- (3) Unit 1, qualified display processing system communication board failure on July 25, 2022
- (4) Unit 2, qualified display processing systems digital processing unit C alarms on September 4, 2022
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 1, train A emergency diesel generator expansion joint replacement on August 23, 2022.
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (8 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
- (1) Unit 2, train C emergency diesel generator on July 18, 2022
- (2) Unit 2, train C emergency diesel generator on July 21, 2022
- (3) Unit 2, train C essential cooling water traveling screen on August 28, 2022
- (4) Unit 2, train C control room envelope heating, ventilation, and air conditioning following maintenance on August 28, 2022
- (5) Unit 2, train C emergency diesel generator following exhaust maintenance on August 28, 2022
- (6) Unit 1, stator coolant pressure control valve on August 29, 2022
- (7) Unit 2, train B essential chiller following maintenance on August 31, 2022
- (8) Unit 2, fuel handling building exhaust filter on September 10, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (4 Samples)
- (1) Unit 2, train A emergency diesel operability test on July 5, 2022
- (2) Unit 1, train B low head safety injection pump surveillance test on July 17, 2022
- (3) Unit 1, train B residual heat removal pump surveillance test on July 17, 2022
- (4) Unit 1, train D auxiliary feedwater pump surveillance on July 27, 2022
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Unit 1, train B high head safety injection pump in service test on July 17, 2022
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise conducted on July 20, 2022. The exercise scenario simulated high vibrations on the main turbine, a control rod ejection, degradation in fuel integrity, a large break loss of cooling accident, and a failure of electrical penetration seal to containment. This led to a monitored release to the environment.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the following Emergency Plan changes and risk significant implementing procedure changes:
STPEGS Emergency Plan, revision 0, based on standard NUREG-0654, revision 2 (effective April 2022)
Emergency Action Level Technical Basis Manual, revision 0 The inspectors also evaluated the 10 CFR 50.54(q) emergency plan change process and practices between July 1, 2021, and July 5, 2022. This involved review of a selection of additional licensee screening and evaluation documentation. These evaluations and reviews do not constitute NRC approval.
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
(1)the licensee's simulator-based licensed operator training evolution that involved a steam generator power operated relief valve failure, loss of feedwater, an anticipated transient without scram and an Alert notification on August 1,
RADIATION SAFETY
71124.05 - Radiation Monitoring Instrumentation
Walkdowns and Observations (IP Section 03.01) (10 Samples)
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
- (1) Unit 2, mechanical auxiliary building failed fuel radiation monitor
- (2) Unit 2, safety injection trains A, B, and C radiation monitors
- (3) Unit 2, fuel handling building personnel contamination friskers
- (4) Unit 2, spent fuel pool floor air sampler
- (5) Unit 2, personnel whole body contamination monitors at the egress of 41' radiologically controlled area access control point
- (6) Unit 2, small article monitors at the egress of 41' radiologically controlled area access control point
- (7) Unit 2, personnel gamma exit monitors at the egress of 41' radiologically controlled area access control point
- (8) Unit 1, portable ion chambers staged for use in the mechanical auxiliary building
- (9) Unit 1, reactor containment building personnel airlock area radiation monitor
- (10) Unit 1, fuel handling building, train A exhaust radiation monitor
Calibration and Testing Program (IP Section 03.02) (13 Samples)
The inspectors evaluated the calibration and testing of the following radiation detection instruments:
- (1) Ludlum Model 9-3 ion chamber, serial number (SN) 345262, February 22 2022
- (2) Thermo Electron Corp. small article monitor, SN 1212SAM12130, August 24, 2021
- (3) Eberline AMS-4, ID No. 400-00099-004, May 25, 2022
- (4) Ludlum Model 177 sample counter, ID No. 400-00012-046, August 17, 2022
- (5) Ludlum 78 digital stretch scope, SN267956, June 7, 2022
- (6) Bicron Microrem survey meter, SN 1252, February 9, 2022
- (7) Canberra ARGOS-5AB, SN 1306-150, October 7, 2021
- (8) Canberra GEM-5, SN 1306-155, August 2, 2022
- (9) Unit 1, chemical volume control system letdown radiation transmitter, N1RART8039, October 16, 2020
- (10) Unit 2, steam generator blowdown radiation transmitter, N2RART8043, January 27, 2021
- (11) Unit 2, reactor building high range area monitor calibration (RT-8051), October 29, 2019
- (12) Unit 2, reactor building atmosphere monitor calibration (RT-8011), July 8, 2021
- (13) Unit 2, chemical volume control system letdown radiation transmitter, N2RART8039, October 7, 2021 Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (3 Samples)
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
- (1) Unit 1, liquid waste processing system radiation monitor No. 1, RT-8038
- (2) Unit 2, main steam line 'A' radiation monitor, A2RA-RT-8046
- (3) Unit 2, mechanical auxiliary building unit vent wide range gas monitor, N2RA-RT-8010B
71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation
Radioactive Material Storage (IP Section 03.01)
The inspectors evaluated the licensees performance in controlling, labeling, and securing the following radioactive materials:
- (1) Unit 2, radioactive waste storage pad (2)old steam generator storage facility (3)warehouse 44
Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)
The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality:
- (1) Unit 2, filters and demineralizers, ALPS demineralizer system, and spent resin liner transfer/fill system
- (2) Unit 1, low activity spent resin system
Waste Characterization and Classification (IP Section 03.03) (3 Samples)
The inspectors evaluated the following characterization and classification of radioactive waste:
- (1) Units 1 and 2, process filters
- (2) Unit 1, high activity spent resin
- (3) Unit 2, low activity spent resin
Shipping Records (IP Section 03.05) (4 Samples)
The inspectors evaluated the following non-excepted radioactive material shipments through a record review:
- (1) LSA II, filters, STP-1-21-040, July 29, 2021
- (2) Type A, contaminated equipment, STP-0-20-045, September 29, 2020
- (3) Type B, dewatered bead resin, STP-2-22-008, April 13, 2022
- (4) Type B, dewatered bead resin, STP-1-21-023, June 9,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05)===
- (1) Unit 1 (July 1, 2021, through June 30, 2022)
- (2) Unit 2 (July 1, 2021, through June 30, 2022)
MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 (July 1, 2021, through June 30, 2022)
- (2) Unit 2 (July 1, 2021, through June 30, 2022)
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 (July 1, 2021, through June 30, 2022)
- (2) Unit 2 (July 1, 2021, through June 30, 2022)
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)
- (1) July 1, 2021, through June 30, 2022 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) July 1, 2021, through June 30, 2022 EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) July 1, 2021, through June 30, 2022 In April 2022, the ANS was changed such that it relies on Integrated Public Alert &
Warning System (IPAWS) as the primary means of public notification. Therefore, siren testing results will not be reported as part of this performance indicator in following quarters. ANS reliability will be assessed during normal baseline inspections.
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) switchyard insulator flashovers on January 6, and April 13, 2022.
71153 - Follow Up of Events and Notices of Enforcement Discretion Event Follow up (IP Section 03.01)
- (1) The inspectors evaluated LER 05000499/2022-001-00, Automatic Actuation of Emergency Diesel Generator due to Lockout of Switchyard Electrical Bus and licensees response on January 6,
INSPECTION RESULTS
Failure to Provide Oversight Leads to Multiple Examples of Switchyard Insulator Flashovers Cornerstone Significance Cross-Cutting Aspect Report Section Initiating Events Green FIN 05000498,05000499/2022003-01 Open/Closed None (NPP)71152A A self-revealed Green finding was identified for the licensees failure to adequately implement requirements of procedure 0PGP03-XS-0001, Switchyard Management, revision 11, to ensure adequate oversight of switchyard component maintenance. Specifically, the licensee failed to ensure that coatings of switchyard insulators were maintained. This condition resulted in flashovers which caused a de-energization of the switchyard south electrical bus and starting of safety-related equipment.
Description:
On January 6, 2022, the licensee experienced a de-energization of the switchyard south electrical bus due to leakage current discharging to ground, otherwise known as a flashover. The unexpected de-energization resulted in a loss of power to the Unit 2 train B engineered safety features (ESF) 4160V bus. This caused an automatic start of the Unit 2 train B emergency diesel generator due to the undervoltage condition on the ESF bus.
The licensee found the south bus had de-energized due to an electrical flashover event as a result of an insulator on the south bus. The event was reported in licensee event report 2022-001 on March 4, 2022.
On April 13, 2022, the licensee again experienced a de-energization of the switchyard south electrical bus due to a flashover. No automatic actuation of any emergency diesel generator occurred because the Unit 2 train B ESF 4160V bus was temporarily aligned to the Unit 1 standby transformer to support maintenance. The cause was determined to be two different insulators but of the same two-piece design as the first occurrence.
The insulators in the licensees electrical switchyard are owned and maintained by the transmission distribution service provider. This entity had the insulator from the first flashover event analyzed. A report was provided to the licensee that concluded the insulator had areas where the room-temperature-vulcanizing silicone rubber coating was degraded and that large sections of the insulator had lost its hydrophobicity, or its ability to repel moisture, and instead became hydrophilic, having an affinity to spread water across its surface to maximize water coverage. A combination of contamination of the surface of the insulator combined with wetting of a hydrophilic insulator surface was reported as the likely cause the flashover.
The licensee performed a cause evaluation which stated that the equipment that failed was a transmission distribution service provider owned piece of equipment and that the service provider also performed all maintenance. When the inspectors questioned when the last time the insulator had been recoated or replaced, the licensee stated that they did not have a record for the last time either activity had been performed and neither did the transmission distribution service provider.
The inspectors researched licensee switchyard procedures and found statements in 0PGP03-XS-0001, Switchyard Management, revision 11, which indicate that the licensee is responsible for performing switchyard PM [preventive maintenance] oversight. The inspectors determined that the licensee failed to provide adequate oversight over preventive maintenance of switchyard components as evidenced by the lack of records for previous insulator maintenance and lack of scheduled future maintenance activities.
Corrective Actions: The licensee ensured that the transmission distribution service provider replaced all switchyard insulators of similar build as the ones which caused the flashovers.
The licensee then washed and commenced recoating the remaining insulators in the switchyard. The licensee also began working with the transmission distribution service provider to establish a preventive maintenance schedule for tracking insulator coatings and a monitoring program to gauge when environmental conditions warrant washing the insulators.
Corrective Action References: condition reports (CR) 2022-235, CR 2022-3717, and CR 2022-9617
Performance Assessment:
Performance Deficiency: The licensees failure to adequately implement requirements in procedure 0PGP03-XS-0001, Switchyard Management, revision 11, to ensure adequate oversight of switchyard component maintenance was a performance deficiency. Specifically, the licensee failed to ensure that coatings of switchyard insulators were maintained. This degraded condition resulted in flashovers which caused a de-energization of the switchyard south electrical bus and starting of safety-related equipment.
Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Equipment Performance attribute of the Initiating Events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the licensee failed to oversee the preventive maintenance of switchyard component which caused flashovers of three different insulators.
Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power.
Specifically, in Exhibit 1, "Initiating Events Screening Questions," the inspectors determined that this finding is of very low safety significance (Green), because it did not cause a reactor trip and the loss of mitigating equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.
Cross-Cutting Aspect: Not Present Performance. No cross-cutting aspect was assigned to this finding because the inspectors determined the finding did not reflect present licensee performance. The licensee was in the process of planning and scheduling corrective actions for the first flashover when the second flashover occurred.
Enforcement:
Inspectors did not identify a violation of regulatory requirements associated with this finding.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On August 17, 2022, the inspectors presented the emergency preparedness exercise inspection results to G. T. Powell, President and Chief Executive Officer and other members of the licensee staff.
On August 19, 2022, the inspectors presented the public radiation safety inspection results to Kym Harshaw, Executive Vice President and Chief Nuclear Officer, and other members of the licensee staff.
On October 4, 2022, the inspectors presented the integrated inspection results to Kym Harshaw, Executive Vice President and Chief Nuclear Officer and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
Class 1E125V DC Battery Float & Equalize Voltage
Corrective Action
Documents
Resulting from
Inspection
CR-YYYY-NNNN
22-8
Drawings
0-E-AAAA-01, #1,
- 2
Main One Line Diagram
Drawings
9-E-DJAA-01, #1,
- 2
Single Line Diagram, 125V dc Class 1E Distributions
Switchboard, E1A11 (Channel I)
Drawings
9-E-DJAB-01, #1,
- 2
Single Line Diagram, 125V DC Class 1E Distribution
Switchboard, E1D11 (Channel II)
Drawings
9-E-DJAC-01, #1,
- 2
Single Line Diagram, 125V DC Class 1E Distribution
Switchboard, E1B11 (Channel III)
Drawings
9-E-DJAD-01, #1,
- 2
Single Line Diagram, 125V DC Class 1E Distribution
Switchboard, E1C11 (Channel IV)
Drawings
9-E-DJAE-01, #1,
- 2
Single Line Diagram 125V DC Class 1E Distribution Panels
Drawings
9-E-DJAF-01, #1,
- 2
Single Line Diagram 125V DC Class 1E Distribution Panels
Procedures
4E520EQ1006
Class 1E 125V DC Control Power System
Procedures
5N049EB111
Station Blackout
Procedures
Fire Preplan for Diesel Generator Building, Train B
Procedures
Fire Preplan for Diesel Generator Building Train A
Procedures
Fire Preplan Diesel Generator Building Stairwell, Train B
Procedures
Electrical Auxiliary Building, Power Cable Vault Train A
Procedures
Fire Preplan Isolation Valve Cubicle Pump Room Train C
Procedures
Fire Preplan Isolation Valve Cubicle, Pump Room Train D
Procedures
Fire Preplan Mechanical Auxiliary Building Service Areas
and BRS Recycle Holdup Tanks
Procedures
Procedures
STPEGS Fire Brigade
Corrective Action
CR-YYYY-NNNN
22-6870, 2022-6985, 2022-7145, 2022-6280, 2022-8692
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Documents
Corrective Action
Documents
CR-YYYY-NNNN
22-8274
Corrective Action
Documents
CR-YYYY-NNNN
22-6870, 2022-6985, 2021-8268, 2022-8857
Procedures
Auxiliary Feedwater Pump 14(23) Inservice Test
Procedures
Standby Diesel 11(21) Operability Test
Procedures
Residual Heat Removal Pump 1B(2B) Inservice Test
Procedures
Low Head Safety Injection Pump 1B(2B) Inservice Test
Procedures
High Head Safety Injection Pump 1B(2B) Inservice Test
Corrective Action
Documents
CR-YYYY-NNNN
20-2739, 2020-10201,20 20-11085, 2020-11781,
21-7790, 2021-8107, 2021-8130, 2021-9220,
22-1628, 2022-4566, 2022-4857, 2022-5470
Corrective Action
Documents
Resulting from
Inspection
CR-YYYY-NNNN
22-7049
Procedures
Drill & Exercise Conduct and Evaluation
Procedures
ERO Response
Procedures
Emergency Exposure Controls
Procedures
Operator Time Critical Action Program
Procedures
0018A
Emergency Operating Procedure Generic Guidance
Procedures
Plant Cooldown
Procedures
Reactor Trip or Safety Injection
Procedures
Loss Of Reactor Or Secondary Coolant
Procedures
ES11
SI Termination
Procedures
F0005
Containment Critical Safety Function Status Tree
Procedures
FR12
Response To Low Pressurizer Level
Procedures
FRZ1
Response To High Containment Pressure
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
FRZ3
Response To High Containment Radiation Level
Miscellaneous
R. 20
Effectiveness
Evaluation,
Evaluation CR
Tracking Number:
CR# 21-7790-1
Changes to STPEGS Emergency Action Level Technical
Basis Manual R3
09/07/2021
Miscellaneous
R. 20
Effectiveness
Evaluation,
Evaluation CR
Tracking Number:
CR# 21-7800-2
EP-0001.000, STPEGS Emergency Plan Change to Remove
Statement Regarding Field Use of an Single Channel
Analyzer
08/31/2021
Miscellaneous
R. 20 Screen
Evaluation,
Evaluation CR
Tracking Number:
CR# 20-2575-115
Changes Made to South Texas Project Electric Generating
Station (STPEGS) Emergency Plan
09/02/2021
Miscellaneous
Form 2,
Effectiveness
Evaluation Form,
Evaluation CR
Tracking Number
21-8130-2
Elimination of the Option to Downgrade or De-escalate from
an Emergency Classification Level (ECL)
2/07/2021
Miscellaneous
NOCXX:22035953
RE: Letter of Agreement with Luminant Power, Post
Accident Analysis, NUREG-0737
11/08/2021
Procedures
EAL Technical Basis Manual
Procedures
Reactor Trip or Safety Injection
Procedures
Faulted Steam Generator Isolation
Procedures
EAL Technical Basis Manual
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-YYYY-NNNN
20-10420, 2021-12141, 2021-689, 2022-512
20-10473, 2021-3317, 2022-1310, 2021-6965, 2022-4236
20-11789, 2021-5896, 2022-1708, 2021-8138, 2022-6636
20-12836, 2021-6644, 2022-2963, 2021-8878, 2022-6903,
21-12749, 2021-12986
Corrective Action
Documents
Resulting from
Inspection
CR-YYYY-NNNN
22-8033
Procedures
Radiation Monitoring System Alarm Response
Procedures
RCB Atmosphere Monitor Calibration (RT-8011)
Procedures
RCB High Range Area Monitor Calibration
Procedures
Measuring and Test Equipment / Radiological
Instrumentation Calibration Program
Procedures
Calibration of the Eberline 6112 (Series) and the Ludlum 78
Stretch Scope
Procedures
Calibration of Counting Instruments
Procedures
Calibration of Handheld Survey Meters - Ion Chambers
Procedures
Maintenance Calibration of SAM Series Small Article
Monitors
Procedures
Monitor Calibration of Canberra Argos-5AB Whole Body
Monitors
Procedures
Calibration of Ludlum 9-3 Ion Chambers
Procedures
FIN-0001
Fix It Now Team Guideline
Self-Assessments MN-20-0-108189
Quality Monitoring Report: Oversight to verify the Radiation
Protection Program is reviewed annually in accordance with
CFR 20
09/09/2020
Self-Assessments MN-21-1-108593
Quality Monitoring Report: Oversight of chemistry sampling
during shutdown activities
10/20/2021
Self-Assessments MN-21-1-108623
Quality Monitoring Report: Oversight activity during 1RE23
to ensure RP Technicians properly maintain radiological
instrumentation
10/19/2021
Self-Assessments MN-21-2-108408
Quality Monitoring Report: Monitored Health Physics
activities related to 2RE21
04/05/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
NC-5116
Old Steam Generator Storage Facility Isotopic
Characterization
03/04/2013
Corrective Action
Documents
CR-YYYY-NNNN
20-10248, 2020-10853, 2020-11210, 2020-11211,
20-11405, 2020-11501, 2020-11759, 2020-12434,
20-12436, 2020-12673, 2020-09976, 2021-12250,
21-01236, 2021-12636, 2021-12637, 2021-12638,
21-02188, 2021-03003, 2021-03311, 2021-03577,
21-03676, 2021-04540, 2021-00467, 2021-00509,
21-06514, 2021-07966, 2021-08509, 2021-08921,
21-09942, 2022-00158, 2022-04929
Corrective Action
Documents
Resulting from
Inspection
CR-YYYY-NNNN
22-8076
Miscellaneous
HP 5986
Unit 2, process filter waste stream update
08/02/2020
Miscellaneous
HP 8469
Unit 2, process filter waste stream update
06/24/2021
Miscellaneous
HP10087
Unit 1, process filter waste stream update
2/24/2022
Miscellaneous
HP8728
Unit 1, high activity spent resin waste stream update
03/02/2022
Procedures
Radioactive Waste Process Control Program
Procedures
Radioactive Material Control Program
Procedures
High Integrity Container (HIC) Dewatering for Shipment and
Burial
Procedures
Radioactive Waste Shipments
Procedures
10CFR61 Sampling and Analysis Program
Procedures
Sorting and Processing of Radioactive Material
Procedures
Shipment of Radioactive Material
Procedures
Processing, Tracking and Loading of Spent Radioactive
Filters
Procedures
Onsite Staging Facility Operations
Radiation
Surveys
115624
Technical Specification Inventory
07/07/2021
Radiation
Surveys
118169
Technical Specification Inventory
01/10/2022
Self-Assessments21-471
Snapshot Self-Assessment: STP's implementation of
2/15/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CFR Part 37 regulatory requirements
Self-Assessments CR 20-10243
Snapshot Self-Assessment: Radwaste Assessment
2/21/2021
Self-Assessments CR-22-3445
Snapshot Self-Assessment: Radwaste Assessment
07/11/2022
Self-Assessments MN-21-0-108276
Quality Monitoring Report: Radioactive Waste Equipment
and Systems
01/29/2021
Self-Assessments MN-21-0-108316
Quality Monitoring Report: 10 CFR Part 37 category 2
source movement
03/10/2021
Self-Assessments MN-21-0-108519
Quality Monitoring Report: Radioactive Source Controls
08/18/2021
Self-Assessments MN-21-0-108557
Quality Monitoring Report: Radiation Protection Program
09/28/2021
Self-Assessments MN-21-0-108664
Quality Monitoring Report: 10 CFR Part 37 Program Review
11/18/2021
Self-Assessments MN-21-1-108624
Quality Monitoring Report: Oversight of 1RE23 outage
radioactive waste shipment
10/21/2021
Self-Assessments MN-21-2-108448
Quality Monitoring Report: 2RE21 outage dry active waste
shipment
04/19/2021
71151
Corrective Action
Documents
Resulting from
Inspection
CR-YYYY-NNNN
22-7177
71151
Miscellaneous
Prompt Notification System Design Report
09/29/2021
71151
Procedures
Emergency Preparedness Program Administration
71151
Procedures
EP Performance Indicator Evaluation and Tracking
71151
Procedures
Performance Indicator Tracking Guide
10