IR 05000498/2024402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402
ML24296A029
Person / Time
Site: South Texas  
(NPF-076, NPF-080)
Issue date: 10/23/2024
From: Douglas Dodson
NRC/RGN-IV/DRSS/PSB
To: Harshaw K
South Texas
References
IR 2024402
Download: ML24296A029 (1)


Text

October 23, 2024

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000498/2024402 AND 05000499/2024402

Dear Kimberly A. Harshaw:

On September 19, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project Electric Generating Station, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Douglas E. Dodson, II, Acting Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2024402 and 05000499/2024402

Enterprise Identifier:

I-2024-402-0010

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project Electric Generating Station, Units 1 and 2

Location:

Wadsworth, TX 77483

Inspection Dates:

September 16, 2024, to September 19, 2024

Inspectors:

T. Weir, Physical Security Inspector

Approved By:

Douglas E. Dodson, II, Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC baseline inspection of this program area, Security Plan, revisions 26 to 27 were implemented. Based on the licensees evaluation and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) June 13 through August 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 19, 2024, the inspector presented the security baseline inspection results to Kimberly A. Harshaw, Acting President, Chief Executive Officer, and Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

CR-YYYY-NNNN

23-5941, 2023-7736, 2023-8232, 2023-8827, 2023-9047,

23-9170, 2024-1041, 2024-2544, 2024-3084, 2024-3080,

24-3085, 2024-4754, 2024-5395, 2024-5733, 2024-6015

71130.02

Corrective Action

Documents

Resulting from

Inspection

CR-YYYY-NNNN

24-8869, 2024-9047

71130.02

Procedures

0PGP03-ZA-0108

Safeguards Information Program

71130.02

Procedures

0PGP03-ZS-0001

Vehicle, Material and Personnel Access Control

71130.02

Procedures

0PGP03-ZS-0005

Control of Keys, Locks, Cores, Keycards and Passwords

71130.02

Procedures

Security

Instruction 2101

Access Control

71130.02

Procedures

Security

Instruction 2201

Patrol and Alarm Response

71130.02

Procedures

Security

Instruction 3701

Security Equipment Operability Tests

71130.02

Procedures

Security

Instruction 3702

Explosive Detector Operability Tests

71130.02

Procedures

Security

Instruction 3704

Hand Geometry Unit Test

71130.02

Self-Assessments

24 71130.02

Self Assessment Access Control

09/05/2024

71130.02

Self-Assessments

AUDIT REPORT

NUMBER 23-05

(SE)

STP NUCLEAR OPERATING COMPANY PHYSICAL

SECURITY QUALITY AUDIT REPORT

09/27/2023

71130.09

Miscellaneous

Physical Security Plan/Safeguards Contingency Plan

71130.09

Miscellaneous

Physical Security Plan/Safeguards Contingency Plan

71130.09

Miscellaneous

Physical Security Plan/Safeguards Contingency Plan

71151

Procedures

1006

Security Performance Indicator Calculation

14