February 23, 2021

SUBJECT:

SOUTH TEXAS PROJECT - SECURITY BASELINE INSPECTION REPORT 05000498/2021401 AND 05000499/2021401

Dear Mr. Powell:

On January 28, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project and discussed the results of this inspection with Mr. Aldo Capristo, Executive Vice President & Chief Administration Officer and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1

Division of Reactor Safety

Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2021401 and 05000499/2021401

Enterprise Identifier: I-2021-401-0013

Licensee:

South Texas Project Nuclear Operating Company

Facility:

South Texas Project

Location:

Wadsworth, TX

Inspection Dates:

January 25, 2021 to January 28, 2021

Inspectors:

R. Lanfear, Physical Security Specialist

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at South Texas Project, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

===elements:

Fitness For Duty Program===

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements (Except 02.11)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 28, 2021, the inspectors presented the security baseline inspection results to Mr. Aldo Capristo, Executive Vice President & Chief Administration Officer and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.08

Corrective Action

Documents

Resulting from

Inspection

21-956

1/28/21

Miscellaneous

Audit Report

Number 18-04

(AA)

STP Nuclear Operation Company Access Authorization

Quality Audit Report

07/05/2018

Audit Report

Number 20-04

(AA)

STP Nuclear Operating Company Access Authorization

Quality Audit Report

2/10/2020

NANTel

Generic Fitness or Duty and Behavior Observation

06/08/2017

STP-9592

STP Fitness For Duty Administrative Policy

Procedures

0PGP03-ZA-0112

Fatigue Rule Waiver

0PGP03-ZA-0114

Fatigue Rule Program

0PGP09-ZA-0001

Plant Access Authorization Program

0PGP09-ZA-0002

Fitness for Duty Program

0PGP09-ZA-0003

Behavior Observation Program

0PGP09-ZA-0004

Employee Assistance Program

0PGP09-ZA-0007

Unescorted Access Evaluation Process

FFD-001

Fitness for Duty - Data Entry

FFD-002

Fitness for Duty - Collection Process

FFD-003

Fitness for Duty-For Cause / Post event Process

3