Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter
ML23233A189
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/22/2023
From: Patricia Vossmar
NRC/RGN-IV/DORS/PBA
To: Gerry Powell
South Texas
References
IR 2023005
Download: ML23233A189 (1)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2023005 AND 05000499/2023005)

Dear G. T. Powell:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for the South Texas Project Electric Generating Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1144 with any questions you have regarding this letter.August 22, 2023

Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket Nos: 05000498 and 05000499 License Nos: NPF-76, NPF-80 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV Signed by Vossmar, Patricia on 08/22/23

ML23233A189 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/A BC:DORS/A NAME RBywater PVossmar DATE 8/22/23 8/22/23

Site Inspection Activity Plan South Texas Project

07/01/2023 - 06/30/2025

Unit Start End Activity CAC Title Staff Count

STP 2023 INITIAL EXAM 6

1,2 7/16/2023 7/22/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP 2023 Program Inspection - STP 1

1,2 7/24/2023 7/28/2023 IP 71114.02 000717 Alert and Notification System Testing

1,2 7/24/2023 7/28/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 7/24/2023 7/28/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 7/24/2023 7/28/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 7/24/2023 7/28/2023 IP 71151 001397 Performance Indicator Verification

MC&A - 1

1,2 9/18/2023 9/22/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

STP 2023 BRQ 3

1,2 10/22/2023 10/28/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Security FFD.08 1

1,2 11/13/2023 11/17/2023 IP 71130.08 000740 Fitness For Duty Program

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - STP 5

1,2 1/8/2024 1/12/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1,2 1/29/2024 2/2/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

Commercial Grade Dedication Inspection - South Texas 3

1,2 1/22/2024 1/26/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

1,2 2/5/2024 2/9/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

Cyber Security - STP 4

1,2 1/29/2024 2/2/2024 IP 71130.10 000741 Cybersecurity

Inservice Inspection - STP (U2) 1

1 4/1/2024 4/12/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI 2

1,2 4/1/2024 4/5/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 4/1/2024 4/5/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 4/1/2024 4/5/2024 IP 71151 000746 Performance Indicator Verification

Security Equipment (.04), Security Training (.07) 2

1,2 5/20/2024 5/24/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 5/20/2024 5/24/2024 IP 71130.07 000739 Security Training

STP 2024 PI&R Inspection 4

Prepared on 8/18/2023 10:19:30 AM 1 of 2 Site Inspection Activity Plan

1,2 6/10/2024 6/14/2024 IP 71152B 000747 Problem Identification and Resolution

1,2 6/24/2024 6/28/2024 IP 71152B 000747 Problem Identification and Resolution

EP Exercise & PI Inspection (2024) - STP 4

1,2 7/15/2024 7/19/2024 IP 71114.01 000716 Exercise Evaluation

1,2 7/15/2024 7/19/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

STP 2024 INITIAL EXAM 7

1,2 8/4/2024 8/10/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 9/1/2024 9/7/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP 5,8 2

1,2 9/9/2024 9/13/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 9/9/2024 9/13/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

RP 6,7 2

1,2 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

1,2 9/9/2024 9/13/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151) 1

1,2 9/16/2024 9/20/2024 IP 71130.02 000734 Access Control

1,2 9/16/2024 9/20/2024 IP 71130.09 001656 Security Plan Changes

1,2 9/16/2024 9/20/2024 IP 71151 001338 Performance Indicator Verification

License Renewal 71003 STP (Unit 1)/Phase 1) 2

1 10/28/2024 11/1/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal

Inservice Inspection (U1) 1

1 10/28/2024 11/8/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Security Protective Strategy (71130.05) and Target Sets (71130.14) 3

1,2 3/3/2025 3/7/2025 IP 71130.05 000737 Protective Strategy Evaluation

1,2 3/3/2025 3/7/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

EP 2025 Program Inspection - STP 1

1,2 4/14/2025 4/18/2025 IP 71114.02 000717 Alert and Notification System Testing

1,2 4/14/2025 4/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 4/14/2025 4/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 4/14/2025 4/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 4/14/2025 4/18/2025 IP 71151 001397 Performance Indicator Verification

STP 2025 INITIAL EXAM 6

1,2 6/22/2025 6/28/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

Prepared on 8/18/2023 10:19:30 AM 2 of 2