MONTHYEARIR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter IR 05000498/20220062023-03-0101 March 2023 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2022006 and 05000499/2022006) ML24235A5102023-01-0909 January 2023 Inservice Inspection Request for Information ML22343A1172022-12-12012 December 2022 Notification of an NRC Protection South Texas Project - Baseline Inspection (NRC Inspection Report) 05000498/2023010 and 05000499/2023010) and Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22230C9442022-08-23023 August 2022 Mid-Cycle Planning Letter- Final ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information IR 05000498/20210062022-03-0202 March 2022 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2021006 and 05000499/2021006) ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21230A3932021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21172A2852021-06-21021 June 2021 Information Request, Security IR 2021402 ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21161A1552021-06-0909 June 2021 Notification of Inspection and Request for Information South Texas Project Unit 1 ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety IR 05000498/20200062021-03-0303 March 2021 Annual Assessment Letter (Report 05000498/2020006 and 05000499/2020006) IR 05000498/20200052020-09-0101 September 2020 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2020005 and 05000499/2020005) ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20055E1112020-03-0303 March 2020 STP 2019006 Annual Assessment Letter ML20056D6952020-02-25025 February 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2020002 and 05000499/2020002) and Request for Information ML19295C4822019-10-21021 October 2019 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000498/2020011 and 05000499/2020011) and Request for Information ML19266A5972019-09-23023 September 2019 Notification of Inspection (NRC Inspection Report 05000498/2019004 and 05000499/2019004) and Request for Information IR 05000498/20190052019-08-30030 August 2019 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2, Report 05000498/2019005 and 05000499/2019005 IR 05000498/20180062019-03-0404 March 2019 Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2018006 and 05000499/2018006) ML18344A5772018-12-10010 December 2018 Notification of NRC Design Bases Assurance Inspection (05000498/2019010 and 05000499/2019010) and Initial Request for Information IR 05000498/20180052018-09-10010 September 2018 Errata - Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005) ML18234A4182018-08-31031 August 2018 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Reports 05000498/2018005 and 05000499/2018005) IR 05000498/20170062018-03-0101 March 2018 Annual Assessment Letter for South Texas Project Electric Generating Station Units 1 and 2 (Report 05000498/2017006 and 05000499/2017006) IR 05000498/20170052017-08-28028 August 2017 Updated Inspection Plan (Reports 05000498/2017005 and 05000499/2017005) IR 05000498/20160062017-03-0101 March 2017 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (05000498/2016006 and 05000499/2016006) IR 05000498/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2016401 and 05000499/2016401) ML16237A0602016-08-31031 August 2016 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005) IR 05000498/20150062016-03-0202 March 2016 Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015006 and 05000499/2015006) ML16007A7372016-01-0707 January 2016 Notification of Design Bases Inspection (Programs) (Inspection Report 05000498/2016008 and 05000499/2016008) and Initial Request for Information IR 05000498/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2015401 and 05000499/2015401) IR 05000498/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015005 and 05000499/2015005) ML15196A5472015-07-15015 July 2015 Notification of Inspection (IR 05000498/2015004 and 2015004/05000499/2015004) and Request for Information ML15160A4112015-06-0808 June 2015 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2015003 and 05000499/2015003) and Request for Information ML15098A2842015-04-0707 April 2015 Notification of Evaluations of Changes, Tests and Experiments and Permanent Plant Modification (05000498/2015007 and 05000499/2015007) and Request for Information IR 05000498/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2014402 and 05000499/2014402) IR 05000498/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2014006 and 05000499/2014006) ML14098A1722014-04-0808 April 2014 IR 05000498-14-008 and 05000499-14-008, South Texas Project Nuclear Power Plant, Units 1 & 2, Notification of an NRC Triennial Fire Protection Baseline and Request for Information IR 05000498/20130012014-03-0404 March 2014 Annual Assessment Letter for South Texas Project Electric Generating Station Units 1 and 2 (Report 05000498/2013001 and 05000499/2013001) IR 05000498/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2013006 and 05000499/2013006) ML13127A1662013-05-0707 May 2013 IR 05000498-13-405, 05000499-13-405, on 07/09 to 07/10/2013, South Texas Project Electric Generating Station - Notification of TI-186 Inspection IR 05000498/20128012013-03-0404 March 2013 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 & 2 (IR 05000498-12-801 and 05000499-12-801) IR 05000498/20120062012-09-0404 September 2012 Mid-Cycle 2012 Report (IR 05000498-12-006 and 05000499-12-006) ML1124306422011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - South Texas Project Electric Generating Station - Unit 1 and 2 2024-08-22
[Table view] Category:Letter
MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 the Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24184C0832024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24183A1742024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump ML24179A3412024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24171A0112024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24116A3172024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-04
[Table view] |
Text
August 22, 2023
SUBJECT:
UPDATED INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2023005 AND 05000499/2023005)
Dear G. T. Powell:
The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for the South Texas Project Electric Generating Station, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (817) 200-1144 with any questions you have regarding this letter.
Sincerely, Signed by Vossmar, Patricia on 08/22/23 Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket Nos: 05000498 and 05000499 License Nos: NPF-76, NPF-80 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV
ML23233A189 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/A BC:DORS/A NAME RBywater PVossmar DATE 8/22/23 8/22/23
Site Inspection Activity Plan South Texas Project 07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count STP 2023 INITIAL EXAM 6 1,2 7/16/2023 7/22/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
EP 2023 Program Inspection - STP 1 1,2 7/24/2023 7/28/2023 IP 71114.02 000717 Alert and Notification System Testing 1,2 7/24/2023 7/28/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 7/24/2023 7/28/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/24/2023 7/28/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 7/24/2023 7/28/2023 IP 71151 001397 Performance Indicator Verification MC&A - 1 1,2 9/18/2023 9/22/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)
STP 2023 BRQ 3 1,2 10/22/2023 10/28/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security FFD .08 1 1,2 11/13/2023 11/17/2023 IP 71130.08 000740 Fitness For Duty Program FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - STP 5 1,2 1/8/2024 1/12/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 1/29/2024 2/2/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Commercial Grade Dedication Inspection - South Texas 3 1,2 1/22/2024 1/26/2024 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 2/5/2024 2/9/2024 IP 71111.21N.03 001808 Commercial Grade Dedication Cyber Security - STP 4 1,2 1/29/2024 2/2/2024 IP 71130.10 000741 Cybersecurity Inservice Inspection - STP (U2) 1 1 4/1/2024 4/12/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP 1,3,PI 2 1,2 4/1/2024 4/5/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/1/2024 4/5/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 4/1/2024 4/5/2024 IP 71151 000746 Performance Indicator Verification Security Equipment (.04), Security Training (.07) 2 1,2 5/20/2024 5/24/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 5/20/2024 5/24/2024 IP 71130.07 000739 Security Training STP 2024 PI&R Inspection 4 Prepared on 8/18/2023 10:19:30 AM 1 of 2
Site Inspection Activity Plan 1,2 6/10/2024 6/14/2024 IP 71152B 000747 Problem Identification and Resolution 1,2 6/24/2024 6/28/2024 IP 71152B 000747 Problem Identification and Resolution EP Exercise & PI Inspection (2024) - STP 4 1,2 7/15/2024 7/19/2024 IP 71114.01 000716 Exercise Evaluation 1,2 7/15/2024 7/19/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes STP 2024 INITIAL EXAM 7 1,2 8/4/2024 8/10/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 9/1/2024 9/7/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
RP 5,8 2 1,2 9/9/2024 9/13/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/9/2024 9/13/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation RP 6,7 2 1,2 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 9/9/2024 9/13/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151) 1 1,2 9/16/2024 9/20/2024 IP 71130.02 000734 Access Control 1,2 9/16/2024 9/20/2024 IP 71130.09 001656 Security Plan Changes 1,2 9/16/2024 9/20/2024 IP 71151 001338 Performance Indicator Verification License Renewal 71003 STP (Unit 1)/Phase 1) 2 1 10/28/2024 11/1/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection (U1) 1 1 10/28/2024 11/8/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Security Protective Strategy (71130.05) and Target Sets (71130.14) 3 1,2 3/3/2025 3/7/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 3/3/2025 3/7/2025 IP 71130.14 000743 Review of Power Reactor Target Sets EP 2025 Program Inspection - STP 1 1,2 4/14/2025 4/18/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 4/14/2025 4/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 4/14/2025 4/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 4/14/2025 4/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 4/14/2025 4/18/2025 IP 71151 001397 Performance Indicator Verification STP 2025 INITIAL EXAM 6 1,2 6/22/2025 6/28/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
Prepared on 8/18/2023 10:19:30 AM 2 of 2