February 27, 2024

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) -

COMMERICAL GRADE DEDICATION INSPECTION REPORT 05000498/2024013 AND 05000499/2024013

Dear G. T. Powell:

On February 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project Electric Generating Station, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000498, 05000499 License Nos. NPF-76, NPF-80

Enclosure:

As stated

Inspection Report

Docket Nos.

05000498 and 05000499

License Nos.

NPF-76 and NPF-80

Report Nos.

05000498/2024013 and 05000499/2024013

Enterprise Identifier:

I-2024-013-0004

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project Electric Generating Station, Units 1 and 2

Location:

Wadsworth, TX 77483

Inspection Dates:

January 22, 2024, to February 09, 2024

Inspectors:

D. Bryen, Reactor Inspector

W. Cullum, Senior Reactor Inspector

R. Kumana, Senior Reactor Inspector

Approved By:

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) - commercial grade dedication inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.03 - Commercial Grade Dedication Commercial Grade Dedication

(1) Stock No. 501-296, Procurement of a safety-related solenoid valve
(2) Stock No. 501-51648, Procurement of a safety-related emergency diesel generator cylinder head
(3) Stock No. 501-53597, Procurement and commercial-grade dedication of a fuse
(4) Stock No. 501-56854, Procurement and commercial-grade dedication of a motor-operated-valve compression spring
(5) Stock No. 501-65810, Procurement of a non-safety-related communication module under exemption from special treatment
(6) Stock No. 501-66628, Procurement and commercial-grade dedication of a safety-related relay
(7) Stock No. 501-72109, Procurement of a non-safety-related relief valve under exemption from special treatment
(8) Stock No. 501-89314, Procurement and third party dedication of a safety-related breaker
(9) Stock No. 583-777, Procurement and commercial-grade dedication of a bearing
(10) Stock No. 584-625, Procurement and commercial-grade dedication of a safety-related switch
(11) Stock No. 584-684, Procurement and commercial-grade dedication of a mechanical seal
(12) Stock No. 587-326, Procurement and commercial-grade dedication of a traveling screen basket assembly
(13) Stock No. 601-92039, Procurement and commercial-grade dedication of concrete sand
(14) Procurement and commercial-grade dedication of diesel fuel oil
(15) Procurement and commercial-grade dedication of calibration services

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 8, 2024, the inspectors presented the Design Basis Assurance Inspection (Programs) - Commercial Grade Dedication inspection results to G. T. Powell and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Condition

Reports (CR-)

01-19410,02-324, 04-12881, 10-1209, 17-24505,20-820,

20-1381, 20-1474, 20-1490, 20-1588, 20-2084, 20-3596,

20-6185, 20-7996, 23-10538, 23-7982

Corrective Action

Documents

Resulting from

Inspection

Condition

Reports (CR-)24-123, 24-803,24-858, 24-898, 24-1220, 24-1250, 24-

290, 24-1331, 24-1332, 24-1337, 24-1352

DCP 03-11137-9

Alternate Basket Assembly for the ECW Traveling Screen

DCP 03-1705-1

Special Treatment Requirement Exemption for 1-1/2 IN X

2-1/2 IN ECW Relief Valves

DCP 04-6988-2

Revision to the ECW Traveling Water Screen Alternate

Basket Assembly Drawing

DCP 10-1209-12

Vendor Changes to Replacement ECW Traveling Screen

1B

DCP 11-104-207

Approve Changes to MicroMod Controller Design for FHB

Exhaust Fan Air Flow Controllers

DCP 14-16485-4

Essential Cooling Water (ECW) Traveling Screen Spare

Engineering

Changes

DCP 20-7996-1

Vendor Changes to Replacement ECW Travelling Screen

2C

Calibration Services Technical Evaluation

6/2/2022

Integrated Working Group Meeting minutes

6/19/2002

5Y069YS0043

Specification for Structural Excavation and Backfill

5/15/1987

Commercial

Grade Dedication

Plan

587-326, Basket Assembly

Commercial

Grade Dedication

Plan

601-65959, Basket Assembly

Commercial

Grade Dedication

Plan

501-53597, Fuse, 10 Amp

71111.21N.03

Miscellaneous

Commercial

501-66628, Control Relay

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Grade Dedication

Plan

Commercial

Grade Dedication

Plan

584-625, Temperature Switch

Commercial

Grade Dedication

Plan

583-777 Bearing Radial Single Row

Commercial

Grade Dedication

Plan

501-56854, Spring, Compression

Commercial

Grade Dedication

Plan

584-684, Seal Assembly, Mechanical, Oil Pump

Third Party

Dedication Plan

Dedication Plan No. PR030203DP15-1

0PGP03-ZA-0095

Procurement Using Risk-Informed Exemption from

Special Treatment Requirements

0PGP03-ZA-0098

Station Housekeeping

0PGP03-ZC-

0004

Measuring and Test Equipment Control Program

0PGP03-ZE-0046

Excavation and Installation of Backfill

0PGP03-ZO-

0043

Fuel Oil Monitoring Program

0PGP03-ZP-0011

Procurement of Material

0PGP03-ZP-0012

Procurement of Services

0PGP03-ZP-0014

Commercial Grade Item Dedication / Technical Evaluation

0PNP01-ZP-0026

Receiving Material

0PNP01-ZP-0031

Inventory Issue Controls

0PNP01-ZP-0033

Marking, Handling, Storing, Maintenance of Materials and

Access Control

0PQP02-ZA-0001

Receipt Inspection

0PQP02-ZA-0010

Soil Testing

Procedures

0PQP02-ZA-0018

Receipt Inspection Deficiency Reporting

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0PSP07-ZC-0002

Diesel Fuel Oil Receipt Testing

Shipping Records Purchase Order

(PO)

178815, 221106, 225759, 256645, 268423, 272812,

277318, 278409, 280063

Work Orders

Work

Authorization

Number (WAN)

506244, 586079, 609878, 633807, 652614