IR 05000498/2023006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006)
ML24047A216
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/28/2024
From: Patricia Vossmar
NRC/RGN-IV/DORS/PBA
To: Gerry Powell
South Texas
References
IR 2023006
Download: ML24047A216 (7)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2023006 AND 05000499/2023006)

Dear G T Powell:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of South Texas Project Electric Generating Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. For 2024, the Regional Administrator has authorized completing inspection procedure 71003, Post-Approval Site Inspection for License Renewal. In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS link is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely, Patricia J. Vossmar, Chief Projects Branch A Division of Operating Reactor Safety Docket Nos. 05000498, 05000499 License Nos. NPF-76, NPF-80 Enclosure:

Inspection Plan Signed by Vossmar, Patricia on 02/28/24

ML24047A216 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/PBA BC:DORS/PBA NAME RBywater RLB PVossmar DATE 02/20/24 02/28/24

Site Inspection Activity Plan 07201041 - South Texas Project (ISFSI)

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

STP Triennial ISFSI Inspection (one-week during loading campaign) (Part 72) 2

3/1/2025 3/31/2025 IP 60855 001001 Operation Of An ISFSI

Prepared on 2/20/2024 10:52:44 AM 1 of 4 Site Inspection Activity Plan South Texas Project

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - STP 5

1,2 1/8/2024 1/12/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1,2 11/18/2024 11/22/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

Commercial Grade Dedication Inspection - South Texas 3

1,2 1/22/2024 1/26/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

1,2 2/5/2024 2/9/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

Inservice Inspection-STP (U2) 1

2 4/1/2024 4/12/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI 2

1,2 4/1/2024 4/5/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 4/1/2024 4/5/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 4/1/2024 4/5/2024 IP 71151 000746 Performance Indicator Verification

Cyber Security - STP 4

1,2 5/19/2024 5/25/2024 IP 71130.10 000741 Cybersecurity

Security Equipment (.04), Security Training (.07) 2

1,2 5/20/2024 5/24/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 5/20/2024 5/24/2024 IP 71130.07 000739 Security Training

STP 2024 PI&R Inspection 4

1,2 6/10/2024 6/14/2024 IP 71152B 000747 Problem Identification and Resolution

1,2 6/24/2024 6/28/2024 IP 71152B 000747 Problem Identification and Resolution

EP Exercise & PI Inspection (2024) - STP 4

1,2 7/15/2024 7/19/2024 IP 71114.01 000716 Exercise Evaluation

1,2 7/15/2024 7/19/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 7/15/2024 7/19/2024 IP 71151 001397 Performance Indicator Verification

STP 2024 INITIAL EXAM 4

1,2 8/4/2024 8/10/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 9/1/2024 9/7/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP 5,6,7,8 4

1,2 9/9/2024 9/13/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

1,2 9/9/2024 9/13/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

1,2 9/9/2024 9/13/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

Prepared on 2/20/2024 10:52:44 AM 2 of 4 Site Inspection Activity Plan

Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151) 1

1,2 9/16/2024 9/20/2024 IP 71130.02 000734 Access Control

1,2 9/16/2024 9/20/2024 IP 71130.09 001656 Security Plan Changes

1,2 9/16/2024 9/20/2024 IP 71151 001338 Performance Indicator Verification

License Renewal 71003-STP Unit 1(Phase 1) 2

1 10/28/2024 11/1/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal

Inservice Inspection STP (U1) 1

1 10/28/2024 11/8/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Security Protective Strategy (71130.05) and Target Sets (71130.14) 3

1,2 2/24/2025 2/28/2025 IP 71130.05 000737 Protective Strategy Evaluation

1,2 2/24/2025 2/28/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

EP 2025 Program Inspection - STP 1

1,2 4/14/2025 4/18/2025 IP 71114.02 000717 Alert and Notification System Testing

1,2 4/14/2025 4/18/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 4/14/2025 4/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 4/14/2025 4/18/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 4/14/2025 4/18/2025 IP 71151 001397 Performance Indicator Verification

Comprehensive Engineering Team Inspection - South Texas 7

1,2 7/14/2025 7/18/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

1,2 7/28/2025 8/1/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

STP 2025 BRQ 2

1,2 8/3/2025 8/9/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151) 1

1,2 9/8/2025 9/12/2025 IP 71130.02 000734 Access Control

1,2 9/8/2025 9/12/2025 IP 71130.09 001656 Security Plan Changes

1,2 9/8/2025 9/12/2025 IP 71151 001338 Performance Indicator Verification

STP 2025 INITIAL EXAM 6

1,2 8/24/2025 8/30/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 9/28/2025 10/11/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP 1,4,PI - STP 2

1,2 10/13/2025 10/17/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 10/13/2025 10/17/2025 IP 71124.04 000728 Occupational Dose Assessment

1,2 10/13/2025 10/17/2025 IP 71151 000746 Performance Indicator Verification

License Renewal Inspection 71003 - STP Unit 2 (Phase 1) 2

2 10/19/2025 10/25/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

Inservice Inspection-STP (U2) 1

Prepared on 2/20/2024 10:52:44 AM 3 of 4 Site Inspection Activity Plan

2 10/20/202510/31/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Prepared on 2/20/2024 10:52:44 AM 4 of 4