Category:Inspection Report
MONTHYEARIR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 IR 05000498/20234022023-07-14014 July 2023 Security Baseline Inspection Report 05000498/2023402 and 05000499/2023402 (Cover Letter Only) IR 05000498/20230012023-05-0303 May 2023 Integrated Inspection Report 05000498/2023001 and 05000499/2023001 - April 26, 2023 ML23114A3412023-04-24024 April 2023 RE22 Inspection Summary Report for Steam Generator Tubing IR 05000498/20224012023-04-20020 April 2023 Cybersecurity Inspection Report 05000498/2022401 and 05000499/2022401 IR 05000498/20230102023-03-27027 March 2023 Fire Protection Inspection Report 05000498/2023010 and 05000499/2023010 IR 05000498/20220062023-03-0101 March 2023 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2022006 and 05000499/2022006) IR 05000498/20220042023-02-0202 February 2023 Integrated Inspection Report 05000498/2022004 and 05000499/2022004 IR 05000498/20220032022-10-21021 October 2022 Integrated Inspection Report 05000498/2022003 and 05000499/2022003 ML22250A4862022-09-0909 September 2022 Security Baseline Inspection Report 05000498/2022403 and 05000499/2022403 ML22251A3842022-09-0808 September 2022 Security Baseline Inspection Report 05000498/2022403 and 05000499/2022403 (4) IR 05000498/20224032022-09-0808 September 2022 Security Baseline Inspection Report 05000498/2022403 and 05000499/2022403 IR 05000498/20224042022-08-31031 August 2022 Operating Company NRC Security Inspection Report 05000498/2022404, 05000499/2022404 (Cover Letter) IR 05000498/20220122022-08-31031 August 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000498/2022012 and 05000499/2022012 IR 05000498/20220022022-08-11011 August 2022 Integrated Inspection Report 05000498/2022002 & 05000499/2022002 & Independent Spent Fuel Storage Installation Inspection Report 07201041/2022002 and Exercise of Enforcement Discretion ML22220A0452022-08-0808 August 2022 STP Nuclear Operating Company Biennial Problem Identification and Resolution Inspection Report (Cover and Enclosure 1) IR 05000498/20220012022-05-0909 May 2022 Integrated Inspection Report 05000498/2022001 and 05000499/2022001 IR 05000498/20224022022-03-21021 March 2022 Security Baseline Inspection Report 05000498/2022402 and 05000499/2022402 IR 05000498/20210062022-03-0202 March 2022 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2021006 and 05000499/2021006) IR 05000498/20220112022-03-0101 March 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000498/2022011 and 05000499/2022011 IR 05000498/20210042022-01-30030 January 2022 Integrated Inspection Report 05000498/2021004 and 05000499/2021004 IR 05000498/20223012021-11-0303 November 2021 Notification of NRC Initial Operator Licensing Examination 05000498/2022301 and 05000499/2022301 IR 05000498/20210032021-11-0303 November 2021 Integrated Inspection Report 05000498/2021003 and 05000499/2021003 ML21260A0222021-09-22022 September 2021 STP Inspection Report 2021 FOF (IP92707) IR 05000498/20213012021-09-15015 September 2021 NRC Examination Report 05000498/2021301; 05000499/2021301 IR 05000498/20214022021-08-16016 August 2021 Security Baseline Inspection Report 05000498/2021402 and 05000499/2021402 IR 05000498/20210022021-08-0404 August 2021 Integrated Inspection Report 05000498/2021002 and 05000499/2021002 IR 05000498/20210902021-05-24024 May 2021 Notice of Violation, NRC Inspection Report 05000498/2021090 and 05000499/2021090 IR 05000498/20210012021-05-0707 May 2021 Integrated Inspection Report 05000498/2021001 and 05000499/2021001 ML21104A3962021-04-15015 April 2021 Review of the Spring 2020 Steam Generator Tube Inspection Report IR 05000498/20200062021-03-0303 March 2021 Annual Assessment Letter (Report 05000498/2020006 and 05000499/2020006) IR 05000498/20214012021-02-23023 February 2021 Security Baseline Inspection Report 05000498/2021401 and 05000499/2021401 IR 05000498/20200912021-02-23023 February 2021 EA-19-054, South Texas Project Electric Generating Station, Units 1 and 2, Notice of Violation, NRC Inspection Report 05000498/2020091; 05000499/2020091 and NRC Investigation Report 4-2017-034 IR 05000498/20200032021-02-17017 February 2021 STP2020003-RP-GK (Revised 2), Reissued Integrated Inspection Report 5000498/2020003 and 05000499/2020003 IR 05000498/20200042021-01-26026 January 2021 Integrated Inspection Report 05000498/2020004 and 05000499/2020004 IR 05000498/20204012021-01-0707 January 2021 NRC Inspection Report 05000498/2020401 and 05000499/2020401 IR 05000498/20200102020-12-14014 December 2020 Biennial Problem Identification and Resolution Inspection Report 05000498/2020010 and 05000499/2020010 IR 05000498/20204032020-11-0202 November 2020 (Public) Security Baseline Inspection Report 05000498/2020403 and 05000499/2020403 ML20300A5912020-10-27027 October 2020 Integrated Inspection Report 05000498/2020003 and 05000499/2020003 IR 05000498/20203012020-10-19019 October 2020 NRC Initial Operator Licensing Examination Report 05000498/2020301 and 05000499/2020301 2024-01-29
[Table view] Category:Letter
MONTHYEARML24029A2752024-01-29029 January 2024 Request to Reschedule Evaluated Force-on-Force Drill IR 05000498/20230042024-01-29029 January 2024 Integrated Inspection Report 05000498/2023004 and 05000499/2023004 ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information IR 05000498/20244042024-01-18018 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000498/2024404; 05000499/2024404 IR 05000498/20230032023-12-28028 December 2023 Acknowledgment of Reply to a Notice of Violation (NRC Inspection Report 05000498/2023003 and 05000499/2023003) ML23360A1692023-12-26026 December 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the South Texas Project Medical Services Drill Evaluated on August 31, 2023 NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 ML23326A2592023-12-0505 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20234012023-12-0404 December 2023 Security Baseline Inspection Report 05000498/2023401 and 05000499/2023401 ML23324A0102023-11-16016 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A2282023-11-13013 November 2023 Integrated Inspection Report 05000498/2023003 and 05000499/2023003, and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23298A0002023-11-0101 November 2023 the Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 226 and 211 Related to Order Approving Indirect Transfer of Licenses and Conforming License Amendments ML23303A0782023-10-30030 October 2023 Submittal of Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) IR 05000498/20234032023-10-26026 October 2023 Material Control and Accounting Program Inspection Report 05000498/2023403 and 05000499/2023403 (Cover Letter) ML23317A1262023-10-12012 October 2023 South. Texas Project Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 26 ML23279A1382023-10-0505 October 2023 Responses to Requests for Additional Information Related to Application for Order Approving Indirect Transfer of Control of Licenses ML23271A1942023-10-0303 October 2023 Notification of Commercial Grade Dedication Inspection (05000498/2024013 and 05000499/2024013) and Request for Information ML23270B2592023-09-27027 September 2023 Update Foreign Ownership, Control, or Influence ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 IR 05000498/20243012023-09-0707 September 2023 Notification of NRC Initial Operator Licensing Examination 05000498/2024301; 05000499/2024301 IR 05000498/20233012023-09-0101 September 2023 NRC Examination Report 05000498/2023301 and 05000499/2023301 ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23236A6042023-08-24024 August 2023 Annual Dose Report for 2022 IR 05000498/20230052023-08-22022 August 2023 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023005 and 05000499/2023005) - Mid Cycle Letter ML23229A5262023-08-17017 August 2023 Inservice Inspection Summary Report - 1 RE24, ML23229A5892023-08-17017 August 2023 Voluntary Response to Regulatory Issue Summary (RIS) 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23228A2102023-08-15015 August 2023 Closure of Investigation (OI 4-22-19) ML23222A0322023-08-10010 August 2023 Report of Changes Made to Quality Assurance Program for Radioactive Material Packages ML23221A3002023-08-0909 August 2023 RE22 Inspection Summary Report for Steam Generator Tubinq, Rev. 1 (Epld L-2023-LRO-0029) ML23222A2792023-08-0909 August 2023 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) IR 05000498/20230022023-07-28028 July 2023 Integrated Inspection Report 05000498/2023002 and 05000499/2023002 ML23198A0532023-07-24024 July 2023 Request for Withholding Information from Public Disclosure ML23188A1612023-07-14014 July 2023 the Associated ISFSI - Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing (EPID L-2023-LLM-0004) - Letter ML23193A9932023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23192A0482023-07-11011 July 2023 NRC Initial Operator Licensing Examination Approval 05000498/2023301; 05000499/2023301 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML23177A2522023-06-26026 June 2023 Units 1, 2 & Independent Spent Fuel Storage Installation - Biennial Submittal of Technical Specification Bases Changes, Commitment Changes, 10 CFR 50.59 Evaluation Summary, and 10 CFR 72.48 Evaluation Summary ML23166B0802023-06-14014 June 2023 Update Foreign Ownership, Control, or Influence (FOCI) ML23163A1762023-06-12012 June 2023 Application for Order Approving Indirect Transfer of Control of Licenses 2024-01-29
[Table view] |
Text
March 24, 2023
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - FIRE PROTECTION INSPECTION REPORT 05000498/2023010 AND 05000499/2023010
Dear G. T. Powell:
On February 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project Electric Generating Station. On February 16, 2023, the NRC inspectors discussed the results of this inspection with K. Harshaw and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Taylor, Nicholas on 03/24/23 Nicholas H. Taylor, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000498, 05000499 License Nos. NPF-76, NPF-80
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000498 and 05000499 License Numbers: NPF-76 and NPF-80 Report Numbers: 05000498/2023010 and 05000499/2023010 Enterprise Identifier: I-2023-010-0007 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station Location: Wadsworth, TX Inspection Dates: January 30, 2023 to February 17, 2023 Inspectors: M. Chisolm, Reactor Inspector S. Makor, Reactor Inspector J. Drake, Senior Reactor Inspector Approved By: Nicholas H. Taylor, Chief Engineering Branch 2 Division of Operating Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection inspection at South Texas Project Electric Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
Main article: IP 71111.21
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Cable spreading room, train A
- (2) Auxiliary shutdown area
- (3) Relay cabinet area of control room
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected controls are implemented in accordance with the licensees current licensing basis and have adequate implementing procedures.
- (1) Fire brigade training program and qualifications Observed a fire brigade drill on February 28, 2023
- (2) Administrative controls for control of fire impairments and compensatory measures
Fire Protection Program Changes/Modifications (IP Section 03.03) (3 Samples)
The inspectors evaluated the licensee's procedures controlling modifications and procedure revisions for adequacy in reviewing potential impacts to the fire protection program.
- (1) Procedure revisions to Procedure 0PTP03-FP-0103, Fire Protection System Flush, revision 11
- (2) Condition report engineering evaluation (CREE) 21-12326-4, supplement 1, deviation to NFPA 20-1974/1976 and NFPA 22-1976 regarding the requirement of frost-proof casings for suction piping for the fire water storage tanks within South Texas Project Fire Hazard Analysis Report
- (3) Procedure revisions to procedure 0PGP03-ZF-0018, Fire Protection System Functionality Requirements, revision
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 16, 2023, the inspectors presented the fire protection team inspection results to K. Harshaw, Executive Vice President and Chief Nuclear Officer and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.05 Corrective Action Condition 2016-1381, 2018-1230, 2020-1243, 2020-2006, 2020-
Documents Reports 6916, 2020-7172, 2020-10868, 2020-10874, 2020-10892,
20-10933, 2020-10939, 2020-10940, 20-10945, 2020-
11608, 2021-5234, 2021-12326, 2022-477, 2022-3169,
22-5568, 2022-5730, 2022-6644, 2021-9005, 2022-
9108, 2022-9644, 2022-10077, 2022-10098, 2022-10513,
22-10748, 2022-10966, 2022-11450, 2022-12749,23-288, 2023-786, 2023-592, 2023-1133, 2023-12326
71111.21N.05 Corrective Action Condition 2023-413, 2023-414, 2023-427, 2023-1089, 2023-1090,
Documents Reports 2023-1094, 2023-1098, 2023-1100, 2023-1102, 2023-
Resulting from 1103, 2023-1136, 2023-1151, 2023-1153, 2023-1158,
Inspection 2023-1161, 2023-1162, 2023-1198, 2023-1204, 2023-
26, 2023-1230, 2023-1231, 2023-1297, 2023-1305,
23-1310, 2023-1326, 2023-1328, 2023-1329, 2023-
1330, 2023-1332, 2023-1333, 2023-1334, 2023-1335,
23-1337, 2023-1338, 2023-1339, 2023-1341, 2023-
1343, 2023-1346, 2023-1349, 2023-1350, 2023-1494,
23-1646, 2023-1661
71111.21N.05 Engineering Condition Report Gap Analysis Of OPGP03-ZF-0018 And DRAFT Revision 08/14/2018
Evaluations Engineering 5 NUREG-0452
Evaluation 2017-
24176
71111.21N.05 Engineering Condition Report Change To Compensatory Actions Required For Fire 02/19/2019
Evaluations Engineering detector Functionality Exceptions
Evaluation 2018-
201
71111.21N.05 Engineering Condition Report STP is proposing a deviation from NFPA 20-1974 (Diesel 05/12/2022
Evaluations Engineering Fire Pump 1), NFPA 20-1976 (Diesel Fire Pump 2 &3),
Evaluation 21- and NFPA 22-1976
2326-4 Supp. 2
71111.21N.05 Engineering Condition Report Seismic evaluation of tables in relay rooms 02/11/2016
Evaluations Engineering
Inspection Type Designation Description or Title Revision or
Procedure Date
Evaluation
34303270
71111.21N.05 Miscellaneous South Texas Project Nuclear Operating Company Active 01/30/2023
Fire Protection Impairment Permits
71111.21N.05 Miscellaneous FP-0-17000180 Fire Protection System Flush 04/26/2022
71111.21N.05 Miscellaneous NOC-AE- Attachment 1, STP Fire Hazards Analysis Report 03/30/2021
21003792 Amendment 26 Summary of Changes
71111.21N.05 Miscellaneous PRA-NB-03 South Texas Project Electric Generating Station 10
Probabilistic Risk Assessment Initiating Events
71111.21N.05 Miscellaneous PRA-NB-23 South Texas Project Electric Generating Station 10
Probabilistic Risk Assessment Fire Protection System
71111.21N.05 Procedures 0PGP03-ZA- Controlled System or Barrier Impairment 20
0514
71111.21N.05 Procedures 0PGP03-ZF-0016 Fire Protection Alternative Compensatory Measures 0
71111.21N.05 Procedures 0PGP03-ZO- Operator Time Critical Action Program 5
0057
71111.21N.05 Procedures 0PGP05-ZN- Change to Licensing Basis Documents and Amendments 31
0004 to the Operating License
71111.21N.05 Procedures 0POP02-FA- Fire Detection System 16
0001
71111.21N.05 Procedures 0POP04-ZO- Control Room Evacuation 50
0001
71111.21N.05 Procedures 0POP04-ZO- Fire/Explosion 30
0008
71111.21N.05 Procedures 0POP11-CW- Condenser Waterbox Online Isolation and Restoration Rev 30
0001
71111.21N.05 Procedures 0PTP03-FP-0103 Fire Protection System Flush 11
71111.21N.05 Procedures 0PTP03-FP-0120 Fire Hose Hydrostatic Test 13
71111.21N.05 Procedures OPGP04-ZA- Engineering and Vendor Document Processing 16
28
71111.21N.05 Work Orders 583296 WAN# 682, Diesel Fire Pump tripped on water temp 01/26/2023
above safe level
71111.21N.05 Work Orders PMWO WAN Sequential start of diesel fire pumps 1,2,3 02/04/2020
617838
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.05 Work Orders PMWO WAN Sequential start of diesel fire pumps 1,2,3 09/17/2021
24865
7