March 21, 2022

SUBJECT:

SOUTH TEXAS PROJECT - SECURITY BASELINE INSPECTION REPORT 05000498/2022402 AND 05000499/2022402

Dear Mr. Powell:

On February 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project and discussed the results of this inspection with Ms. Kimberly Harshaw, Executive Vice President and Chief Nuclear Officer, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E. Chief Physical Security Branch Division of Radiological Safety and Security

Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2022402 and 05000499/2022402

Enterprise Identifier: I-2022-402-0010

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project

Location:

Wadsworth, TX

Inspection Dates:

February 7, 2022 to February 10, 2022

Inspector:

J. Rollins, Sr Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Div of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at South Texas Project, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a Physical Security Plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2) since the last performance of this IP. Revision 24 of the licensee's Physical Security Plan was finalized on June 26, 2019 and remains current.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) February 1, 2021, through January 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 10, 2022, the inspectors presented the security baseline inspection results to Ms. Kimberly Harshaw and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

21-8176, 21-8188, 21-8438, 21-9342, 21-9609, 21-11300,

21-12148, 21-12372, 21-12396

Miscellaneous

South Texas Project Physical Security Plan

NOC-NOC-

2035924

SGI Repository Custodians List

February 2,

22

RSS POL-1317

Remote Search and Seal Policy and Procedure

11/14/2022

Procedures

0PGP03-ZS-0001

Vehicle, Material, and Personnel Access Control

0PGP03-ZS-0005

Control of Keys, Locks, Cores, Keycards and Passwords

0POP04-ZO-

SEC2

Response to a Credible Threat of Sabotage or Tampering

Guideline

AA-010

Security Badging

Security

Instruction 2101

Access Control

Security

Instruction 2402

Alarm Station Operator

Security

Instruction 3302

Turnstile Electrical Test

Security

Instruction 3701

Security Equipment Operability Tests

Self-Assessments 21-08

Physical/Cyber Security Quality Audit Report

Work Orders

PIDAS Illuminator Testing, Maintenance, and Calibration

Instructions

71151

Miscellaneous

Security Performance Indicator Records from February 2021

to January 2022

Procedures

Security

Instruction 1006

Security Performance Indicator Calculation

2