IR 05000498/2021402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000498/2021402 and 05000499/2021402
ML21224A016
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/16/2021
From: Ray Kellar
Plant Support Branch-1
To: Gerry Powell
South Texas
References
IR 2021402
Download: ML21224A016 (9)


Text

August 16, 2021

SUBJECT:

SOUTH TEXAS PROJECT - SECURITY BASELINE INSPECTION REPORT 05000498/2021402 AND 05000499/2021402

Dear Mr. Powell:

On July 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at South Texas Project. On July 29, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000498 and 05000499 License Nos. NPF-76 and NPF-80

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000498 and 05000499

License Numbers:

NPF-76 and NPF-80

Report Numbers:

05000498/2021402 and 05000499/2021402

Enterprise Identifier:

I-2021-402-0011

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project

Location:

Wadsworth, TX

Inspection Dates:

July 26, 2021 to July 30, 2021

Inspectors:

D. Hostetter, Sr Physical Security Inspector

A. Meyen, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at South Texas Project, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All requirements

Tier II: All requirements

Tier III: All requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations, Part 50.54(p)(2) since the last performance of this IP and Physical Security Plan Revision 24 remains current.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) Unit 1 (August 2020 through July 2021)

Unit 2 (August 2020 through July 2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 29, 2021, the inspectors presented the security baseline inspection results to G.T. Powell and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR-20-1127, CR-

20-11278, CR-20-

279, CR-20-

280, CR 20-

9099, CR-21-758,

CR-21-1055, CR-

21-2545, CR-21-

239, CR-21-

6013, CR-20-

7439

Multiple

AA-013

Psychological Assessment Process

Revision 3

AA-014

PADS Operation and Maintenance

Revision 3

AA-019

Day Access Review Report

Revision 1

AA-022

Transmittal of Access Records

Revision 0

Miscellaneous

AA-024

Finger Printing Process

Revision 5

OPGP-ZA-0006

PADS

Revision 11

OPGP09-ZA-

0001

Access Authorization Program

Revision 39

OPGP09-ZA-

0002

Fitness for Duty Program

Revision 35

OPGP09-ZA-

0003

Behavior Observation Program

Revision 18

OPGP09-ZA-

0007

Unescorted Access Evaluation Process

Revision 17

OPGP09-ZA-

0008

Access Authorization Processing Procedure

Revision 8

Procedures

OPGP09-ZA-

0009

Critical Group Screening Process

Revision 5

71130.01

Self-Assessments

Audit

Pinnacle Investigations, Background Investigation Program

07/10/20

71130.02

Corrective Action

Documents

CR-20-9859, CR-

20-11901, CR-20-

2779, CR-21-

Multiple

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1187, CR-21-

2786, CR-21-

5568, CR-21-

27, CR-21-

7054

Security Event

Logs

Multiple

Security

Instruction 1014

General Purpose Log Form 1, Revision 2

Revision 8

Security

Instruction 1014

Access Control Log, Form 15, Revision 1

Revision 8

Miscellaneous

Security

Technical

Instruction

Hazardous Materials - Armed Security Event

2/14/2018

OP0PO4-ZO-SEL

Response to Credible Threat of Sabotage or Tampering

Guidelines

Revision 14

OPGP03-ZA-

0108

Safeguards Information Program

Revision 26

OPGP03-ZS-

0001

Vehicle, Material, and Personnel Access Control

Revision 54

OPGP03-ZS-

0005

Control of Keys, Locks, Cores, Keycards and Passwords

Revision 24

Security

Instruction 2101

Access Control

Revision 35

Security

Instruction 3502

Entry Scan 4 Explosive Detector Testing

Revision 1

Security

Instruction 3702

Explosive Detector Operability Test

Revision 5

Security

Instructions 3503

Walk Through Metal Detector Performance Test

Revision 3

Security

Instructions 3701

Security Operability Tests

Revision 41

Procedures

Security

Instructions 3704

Hand Geometry Unit Test

Revision 4

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Self-Assessments

South Texas

Project Operating

Company

Physical/Cyber Security Quality Audit Report 20-06

09/24/2020

71130.09

Procedures

Physical Security

Plan

South Texas Project Physical Security Plan, Training and

Qualification, and Safeguards Contingency Plan and

Independent Spent Fuel Storage Installation

Revision 24

71151

Procedures

Security

Instructions 1006

Security Performance Indicator Calculator

Revision 12