ML19309H261: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,  __      .
  .
_                                                                                            8 0 05090]}3tt mmrnu;nsr irrn.rruis i,w w r ,. uii v.i .w n .. . r. ...
P.O BOX 270 H AR1 f ORD. CONNECTICUT 06101
[.'U.NNiCfe[iIcEw.
j  ... ...,.nw......,                                                          (203) 666-6911
!
k  t t2  C':::;,0,3;"J;','l.!? l i                                                                          May 1, 1980 MP 4379
,
Mr. Boyce H. Grier
    ,
Director, Region I Office of Inspection and Enforcement U. S. Iluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
 
==Reference:==
Facility Operating License flo. DPR-65 j                                        Docket tio. 50-336 i                                        Reportable Occurrence R0-50-336/80-16/3L-0
 
==Dear Mr. Grier:==
 
This letter forwards Licensee Event Report 80-16/3L-0 required to be submitted within thirty days pursuant to Milistone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.a, reactor protection systen instrument settings which are found to be less conservative than those established by the technical specifications, but which do not prevent fulfillment of the functional requirements. An additional three copies of the report are enclosed.
Yours truly, fiORTHEAST fiUCLEAR Ef1ERGY          MPAflY
[/ /5/4 &c)
                                                                              &
John F. Opeka Station Superintendent Millstone fluclear Power Station j            JF0/RWB:lls l           
 
==Attachment:==
LER 80-16/3L-0 cc:  Director, Office of Inspection and Enforcement, Washington, D.C. (30)
:                  Director, Office of Management Infomation and Program Control, i                  Washington, D.C. (3) l
                              - .                    -    . _ _ - _
                                                                                        - , ...                  .. ..    -}}

Revision as of 01:52, 1 December 2019

Forwards LER 80-016/03L-0
ML19309H261
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/01/1980
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19309H262 List:
References
MP-2-4379, NUDOCS 8005090454
Download: ML19309H261 (1)


Text

, __ .

.

_ 8 0 05090]}3tt mmrnu;nsr irrn.rruis i,w w r ,. uii v.i .w n .. . r. ...

P.O BOX 270 H AR1 f ORD. CONNECTICUT 06101

[.'U.NNiCfe[iIcEw.

j ... ...,.nw......, (203) 666-6911

!

k t t2 C':::;,0,3;"J;','l.!? l i May 1, 1980 MP 4379

,

Mr. Boyce H. Grier

,

Director, Region I Office of Inspection and Enforcement U. S. Iluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License flo. DPR-65 j Docket tio. 50-336 i Reportable Occurrence R0-50-336/80-16/3L-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 80-16/3L-0 required to be submitted within thirty days pursuant to Milistone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.a, reactor protection systen instrument settings which are found to be less conservative than those established by the technical specifications, but which do not prevent fulfillment of the functional requirements. An additional three copies of the report are enclosed.

Yours truly, fiORTHEAST fiUCLEAR Ef1ERGY MPAflY

[/ /5/4 &c)

&

John F. Opeka Station Superintendent Millstone fluclear Power Station j JF0/RWB:lls l

Attachment:

LER 80-16/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Infomation and Program Control, i Washington, D.C. (3) l

- . - . _ _ - _

- , ... .. .. -