05000336/LER-1980-016, Forwards LER 80-016/03L-0

From kanterella
(Redirected from ML19309H261)
Jump to navigation Jump to search
Forwards LER 80-016/03L-0
ML19309H261
Person / Time
Site: Millstone 
Issue date: 05/01/1980
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19309H262 List:
References
MP-2-4379, NUDOCS 8005090454
Download: ML19309H261 (1)


LER-1980-016, Forwards LER 80-016/03L-0
Event date:
Report date:
3361980016R00 - NRC Website

text

,

8 0 05090]}3tt mmrnu;nsr irrn.rruis i,w w r,. uii v.i.w n... r.

P.O BOX 270

[.'U.NNiCfe[iIcEw.

H AR1 f ORD. CONNECTICUT 06101

......,.nw......,

(203) 666-6911 j

k t t2 C':::;,0,3;"J;','l.!? l May 1, 1980 i

MP 4379 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. Iluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License flo. DPR-65 j

Docket tio. 50-336 i

Reportable Occurrence R0-50-336/80-16/3L-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 80-16/3L-0 required to be submitted within thirty days pursuant to Milistone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.a, reactor protection systen instrument settings which are found to be less conservative than those established by the technical specifications, but which do not prevent fulfillment of the functional requirements.

An additional three copies of the report are enclosed.

Yours truly, fiORTHEAST fiUCLEAR Ef1ERGY MPAflY

[/ /5/4 &c)

John F. Opeka Station Superintendent Millstone fluclear Power Station j

JF0/RWB:lls l

Attachment:

LER 80-16/3L-0 cc:

Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Infomation and Program Control, i

Washington, D.C. (3) l