ML062130142: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:James Davis -Re: Comments on Pilgrim AMP document Page 1 I James Davis -Re: Comments on Pilgrim AMP document Page 1!1 From: James Davis To: Joe Zabel Date: 07/07/2006 11:03:18 AM  
{{#Wiki_filter:Page 1 I Davis - Re:
James Davis -       Comments on Re: Comments     on Pilgrim AMP document Pilgrim AMP  document                                                              Page 1!1 From:               James Davis To:                 Joe Zabel Date:               07/07/2006 11:03:18 AM


==Subject:==
==Subject:==
Re: Comments on Pilgrim AMP document>>> "Zabel, Joe" <JZabel@atlintl.com>
Re: Comments on Pilgrim AMP document
07/07/2006 10:48 AM >>>Hi Jim: In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion
              >>> "Zabel, Joe" <JZabel@atlintl.com> 07/07/2006 10:48 AM >>>
(...): From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays)piping as a result of internal corrosion.
Hi Jim:
The original piping material was rubber-lined carbon steel wrapped with reinforced fiberglass wrapping and coal tar saturated felt and heavy Kraft paper. The leaks were determined to be the result of the degraded rubber lining being in contact with sea water. These pipes have since been replaced with the same external coating as the original pipe. The pipe replacement occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion.
In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion (...):
These spools were replaced with carbon steel coated internally and externally with an epoxy coating. The piping that was removed was examined after its wrapping was removed and its external surface was found to be in good condition.
From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays) piping as a result of internal corrosion. The original piping material was rubber-lined carbon steel wrapped with reinforced fiberglass wrapping and coal tar saturated felt and heavy Kraft paper. The leaks were determined to be the result of the degraded rubber lining being in contact with sea water. These pipes have since been replaced with the same external coating as the original pipe. The pipe replacement occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion. These spools were replaced with carbon steel coated internally and externally with an epoxy coating. The piping that was removed was examined after its wrapping was removed and its external surface was found to be in good condition. Since that time, the entire length of both SSW buried discharge loops have been lined internally with cured-in-place pipe linings-"B" Loop in 2001 and "A"Loop in 2003.
Since that time, the entire length of both SSW buried discharge loops have been lined internally with cured-in-place pipe linings-"B" Loop in 2001 and "A" Loop in 2003.Please look this over and send me the missing words to complete your comment.Thanks, Joe Joe Zabel James Davis -Re: Comments on Pilgrim AMP document Page 2 I James Davis -Re: Comments, on Pilgrim AMP document..............
Please look this over and send me the missing words to complete your comment.
I]ge&#xfd;2 Senior Writer/Outreach Manager Advanced Technologies  
Thanks, Joe Joe Zabel
& Laboratories International, Inc.20010 Century Boulevard, Suite 500 Germantown, MD 20874 Tel: (301) 515-6783 Fax: (301) 972-6904 CC: Mark Orr c:temp\GW}OOOO1TMP
 
... ....... ..... ... ... ....... ..........  
                                                      .............. Page 2 II AMP document
..... ... .. ... .... .. .... ...... ....P a gea e 1 Mail Envelope Properties (44AE77B6.D08:
                                                                                ]
22: 35346)
Comments on James Davis - Re: Comments,
            -                    Pilgrim AMP on Pilgrim    document                    ge&#xfd;2 Senior Writer/Outreach Manager Advanced Technologies & Laboratories International, Inc.
20010 Century Boulevard, Suite 500 Germantown, MD 20874 Tel: (301) 515-6783 Fax: (301) 972-6904 CC:               Mark Orr
 
c:temp\GW}OOOO1TMP                       ..........
                                                . ..........
                                                    ...... . . . .. . .. . . ...... ... .. ............. . .....     ..   . .P     agea e 1 Mail Envelope Properties   (44AE77B6.D08: 22: 35346)


==Subject:==
==Subject:==
Creation Date From: Created By: Re: Comments on Pilgrim AMP document 07/07/2006 11:03:18 AM James Davis JAD@nrc.gov Recipients atlintl.com AM JZabel (Joe Zabel)MPOrr CC (Mark Orr)Action Transferred Date & Time 07/07/2006 11:04:09 Post Office Delivered Route atlintl.com Files MESSAGE Options Auto Delete: Expiration Date: Notify Recipients:
Re: Comments on Pilgrim AMP document Creation Date        07/07/2006 11:03:18 AM From:                James Davis Created By:          JAD@nrc.gov Recipients                                                     Action                                Date & Time atlintl.com                                                     Transferred                          07/07/2006 11:04:09 AM JZabel (Joe Zabel)
Priority: ReplyRequested:
MPOrr CC (Mark Orr)
Return Notification:
Post Office                                                      Delivered                          Route atlintl.com Files                        Size                                    Date & Time MESSAGE                      3853                                  07/07/2006 11:03:18 AM Options Auto Delete:                 No Expiration Date:             None Notify Recipients:           Yes Priority:                   Standard ReplyRequested:             No Return Notification:         None Concealed  
Concealed  


==Subject:==
==Subject:==
Security: To Be Delivered:
No Security:                   Standard To Be Delivered:             Immediate Status Tracking:             Delivered & Opened}}
Status Tracking: Size 3853 Date & Time 07/07/2006 11:03:18 AM No None Yes Standard No None No Standard Immediate Delivered  
& Opened}}

Revision as of 16:42, 23 November 2019

Email: (PA) Comments on Pilgrim AMP Document
ML062130142
Person / Time
Site: Pilgrim
Issue date: 07/07/2006
From: Jennifer Davis
Division of Regulatory Improvement Programs
To: Joseph Zabel
Advanced Technologies & Labs International
References
TAC MC9669
Download: ML062130142 (3)


Text

Page 1 I Davis - Re:

James Davis - Comments on Re: Comments on Pilgrim AMP document Pilgrim AMP document Page 1!1 From: James Davis To: Joe Zabel Date: 07/07/2006 11:03:18 AM

Subject:

Re: Comments on Pilgrim AMP document

>>> "Zabel, Joe" <JZabel@atlintl.com> 07/07/2006 10:48 AM >>>

Hi Jim:

In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion (...):

From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays) piping as a result of internal corrosion. The original piping material was rubber-lined carbon steel wrapped with reinforced fiberglass wrapping and coal tar saturated felt and heavy Kraft paper. The leaks were determined to be the result of the degraded rubber lining being in contact with sea water. These pipes have since been replaced with the same external coating as the original pipe. The pipe replacement occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion. These spools were replaced with carbon steel coated internally and externally with an epoxy coating. The piping that was removed was examined after its wrapping was removed and its external surface was found to be in good condition. Since that time, the entire length of both SSW buried discharge loops have been lined internally with cured-in-place pipe linings-"B" Loop in 2001 and "A"Loop in 2003.

Please look this over and send me the missing words to complete your comment.

Thanks, Joe Joe Zabel

.............. Page 2 II AMP document

]

Comments on James Davis - Re: Comments,

- Pilgrim AMP on Pilgrim document geý2 Senior Writer/Outreach Manager Advanced Technologies & Laboratories International, Inc.

20010 Century Boulevard, Suite 500 Germantown, MD 20874 Tel: (301) 515-6783 Fax: (301) 972-6904 CC: Mark Orr

c:temp\GW}OOOO1TMP ..........

. ..........

...... . . . .. . .. . . ...... ... .. ............. . ..... .. . .P agea e 1 Mail Envelope Properties (44AE77B6.D08: 22: 35346)

Subject:

Re: Comments on Pilgrim AMP document Creation Date 07/07/2006 11:03:18 AM From: James Davis Created By: JAD@nrc.gov Recipients Action Date & Time atlintl.com Transferred 07/07/2006 11:04:09 AM JZabel (Joe Zabel)

MPOrr CC (Mark Orr)

Post Office Delivered Route atlintl.com Files Size Date & Time MESSAGE 3853 07/07/2006 11:03:18 AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened