ML070720351: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Page 1 of 1 Perry Buckberg -2/26 Conference Call Record From: Perry Buckberg To: Doug Ellis Date: 2/28/2007 12:00 PM | {{#Wiki_filter:Page 1 of 1 Perry Buckberg - 2/26 Conference Call Record From: Perry Buckberg To: Doug Ellis Date: 2/28/2007 12:00 PM | ||
==Subject:== | ==Subject:== | ||
2/26 Conference Call Record CC: Bryan Ford; Robert Schaaf Doug, Please let me know if any changes are needed to the attached draft record of our recent conference call.file://C:\temp\GW | 2/26 Conference Call Record CC: Bryan Ford; Robert Schaaf Doug, Please let me know if any changes are needed to the attached draft record of our recent conference call. | ||
} 00002.HTM 3/12/2007 | file://C:\temp\GW }00002.HTM 3/12/2007 | ||
116\-temp\GWýb-0-668-Tff P Paqe 1 I | |||
6i~w 1OO~7TM P ~~66T~ | |||
Mail Envelope Properties (45E5B546.9D0 9: 8248) | |||
==Subject:== | ==Subject:== | ||
2/26 Conference Call Record Creation Date 2/28/2007 12:00:54 PM From: Perry Buckberg Created By: PB111 @nrc.gov Recipients Action Date & Time entergy.com Transferred 2/28/2007 12:01:05 PM bford CC (Bryan Ford) dellisI (Doug Ellis) nrc.gov TWGWPO02.HQGWDO01 Delivered 2/28/2007 12:00:59 PM RGS CC (Robert Schaaf) | |||
Priority: ReplyRequested: | Post Office Delivered Route entergy.com TWGWPO02.HQGWDO01 2/28/2007 12:00:59 P]M nrc.gov Files Size Date & Time MESSAGE 547 2/28/2007 12:00:52 PM TEXT.htm 407 MeetingSummary Feb 26 2007 PNPS.wpd 23970 2/28/2007 12:00:18 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed | ||
Return Notification: | |||
Concealed | |||
==Subject:== | ==Subject:== | ||
Security: | No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered | ||
Status Tracking: | |||
DRAFT LICENSEE: | DRAFT LICENSEE: Entergy Nuclear Operations, Inc. | ||
Entergy Nuclear Operations, Inc.FACILITY: | FACILITY: Pilgrim Nuclear Power Station | ||
Pilgrim Nuclear Power Station | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF CONFERENCE CALL ON FEBRUARY 26, 2007, WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc., (Entergy or the applicant) regarding the Pilgrim license renewal application (LRA) to discuss neutron fluence. The conference call was conducted on Monday February 26, 2007, between 3:00 p.m. and 4:00 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. | OF CONFERENCE CALL ON FEBRUARY 26, 2007, WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669) | ||
The following is a summary of the conference call.The NRC Pilgrim Project Manager provided a brief introduction and then discussions regarding neutron fluence began. The staff described to the applicant information that may soon be requested from the applicant in a Request for Additional Information (RAI). The RAI pertains to the applicant's neutron embrittlement time-limited aging analyses (TLAAs) and an Aging Management Plan.The applicant had an opportunity to comment on the meeting summary.Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293 | The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc., (Entergy or the applicant) regarding the Pilgrim license renewal application (LRA) to discuss neutron fluence. The conference call was conducted on Monday February 26, 2007, between 3:00 p.m. and 4:00 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call. | ||
The NRC Pilgrim Project Manager provided a brief introduction and then discussions regarding neutron fluence began. The staff described to the applicant information that may soon be requested from the applicant in a Request for Additional Information (RAI). The RAI pertains to the applicant's neutron embrittlement time-limited aging analyses (TLAAs) and an Aging Management Plan. | |||
The applicant had an opportunity to comment on the meeting summary. | |||
Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293 | |||
==Enclosure:== | ==Enclosure:== | ||
List of Participants cc w/encl: See next page DRAFT DR2-F-LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION February 26, 2007 PARTICIPANTS Perry Buckberg | List of Participants cc w/encl: See next page DRAFT | ||
DR2-F-LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION February 26, 2007 PARTICIPANTS AFFILIATION Perry Buckberg U.S. Nuclear Regulatory Commission (NRC) | |||
Louise Lund NRC Matthew Mitchell NRC Lambros Lois NRC Steve Bethay Entergy Nuclear Operations, Inc. (Entergy) | |||
Bryan Ford Entergy Ray Pace Entergy DRAFT}} |
Latest revision as of 09:33, 23 November 2019
ML070720351 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 02/28/2007 |
From: | Perry Buckberg NRC/NRR/ADRO/DLR |
To: | Ellis D Entergy Corp |
References | |
TAC 3698, TAC MC9669 | |
Download: ML070720351 (4) | |
Text
Page 1 of 1 Perry Buckberg - 2/26 Conference Call Record From: Perry Buckberg To: Doug Ellis Date: 2/28/2007 12:00 PM
Subject:
2/26 Conference Call Record CC: Bryan Ford; Robert Schaaf Doug, Please let me know if any changes are needed to the attached draft record of our recent conference call.
file://C:\temp\GW }00002.HTM 3/12/2007
116\-temp\GWýb-0-668-Tff P Paqe 1 I
6i~w 1OO~7TM P ~~66T~
Mail Envelope Properties (45E5B546.9D0 9: 8248)
Subject:
2/26 Conference Call Record Creation Date 2/28/2007 12:00:54 PM From: Perry Buckberg Created By: PB111 @nrc.gov Recipients Action Date & Time entergy.com Transferred 2/28/2007 12:01:05 PM bford CC (Bryan Ford) dellisI (Doug Ellis) nrc.gov TWGWPO02.HQGWDO01 Delivered 2/28/2007 12:00:59 PM RGS CC (Robert Schaaf)
Post Office Delivered Route entergy.com TWGWPO02.HQGWDO01 2/28/2007 12:00:59 P]M nrc.gov Files Size Date & Time MESSAGE 547 2/28/2007 12:00:52 PM TEXT.htm 407 MeetingSummary Feb 26 2007 PNPS.wpd 23970 2/28/2007 12:00:18 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered
DRAFT LICENSEE: Entergy Nuclear Operations, Inc.
FACILITY: Pilgrim Nuclear Power Station
SUBJECT:
SUMMARY
OF CONFERENCE CALL ON FEBRUARY 26, 2007, WITH ENTERGY NUCLEAR OPERATIONS, INC., REGARDING THE PILGRIM LICENSE RENEWAL APPLICATION (TAC NO. MC9669)
The U.S. Nuclear Regulatory Commission (NRC) staff conducted a conference call with Entergy Nuclear Operations, Inc., (Entergy or the applicant) regarding the Pilgrim license renewal application (LRA) to discuss neutron fluence. The conference call was conducted on Monday February 26, 2007, between 3:00 p.m. and 4:00 p.m. at 11555 Rockville Pike, Rockville, MD 20852. The list of participants is shown in the enclosure. The following is a summary of the conference call.
The NRC Pilgrim Project Manager provided a brief introduction and then discussions regarding neutron fluence began. The staff described to the applicant information that may soon be requested from the applicant in a Request for Additional Information (RAI). The RAI pertains to the applicant's neutron embrittlement time-limited aging analyses (TLAAs) and an Aging Management Plan.
The applicant had an opportunity to comment on the meeting summary.
Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
List of Participants cc w/encl: See next page DRAFT
DR2-F-LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION February 26, 2007 PARTICIPANTS AFFILIATION Perry Buckberg U.S. Nuclear Regulatory Commission (NRC)
Louise Lund NRC Matthew Mitchell NRC Lambros Lois NRC Steve Bethay Entergy Nuclear Operations, Inc. (Entergy)
Bryan Ford Entergy Ray Pace Entergy DRAFT