IR 05000395/2008001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080630301
| number = ML080630301
| issue date = 03/03/2008
| issue date = 03/03/2008
| title = Virgil C. Summer, Annual Assessment Letter (IR 05000395-08-001)
| title = Annual Assessment Letter (IR 05000395-08-001)
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
| addressee name = Archie J B
| addressee name = Archie J
| addressee affiliation = South Carolina Electric & Gas Co
| addressee affiliation = South Carolina Electric & Gas Co
| docket = 05000395
| docket = 05000395
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION


Mr. Jeffrey Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
==REGION II==
rch 3, 2008


SUBJECT: ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION (NRC INSPECTION REPORT 05000395/2008001)
==SUBJECT:==
ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION (NRC INSPECTION REPORT 05000395/2008001)


==Dear Mr. Archie:==
==Dear Mr. Archie:==
Line 29: Line 31:
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.


Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC
Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, "Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies;" and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds."


The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
Line 36: Line 37:
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.


SCE&G 2In accordance with 10 CFR 2.390 of the NRC
SCE&G   2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.


Sincerely,/RA/ Eugene Guthrie, Chief Reactor Projects Branch 5  
Sincerely,
/RA/
Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Enclosure: Summer Inspection/Activity Plan (03/01/08 - 06/30/09)
cc w/encl.: (See page 3)


Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12
_________________________
OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/
NAME JDodson DArnertt LGarner EGuthrie DATE  2/28/08 2/27/08 3/3/08 3/3/08 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO


===Enclosure:===
SCE&G   3 cc w/encl.:
Summer Inspection/Activity Plan (03/01/08 - 06/30/09)
 
cc w/encl.: (See page 3)
 
_________________________ OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/ NAME JDodson DArnertt LGarner EGuthrie DATE 2/28/08 2/27/08 3/3/08 3/3/08 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO SCE&G 3 cc w/encl.:
Kathryn M. Sutton, Esq.
Kathryn M. Sutton, Esq.


Morgan, Lewis & Bockius LLP Electronic Mail Distribution  
Morgan, Lewis & Bockius LLP Electronic Mail Distribution Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.
 
Henry J. Porter Assistant Director  
 
Division of Radioactive Waste Mgmt.
 
S.C. Department of Health and Environmental Control Electronic Mail Distribution
 
Bruce L. Thompson
 
Manager Nuclear Licensing (Mail Code 830) South Carolina Electric & Gas Company Electronic Mail Distribution
 
Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Electronic Mail Distribution


SCE&G 4Letter to Jeffrey from Eugene F. Guthrie dated March 3, 2008
S.C. Department of Health and Environmental Control Electronic Mail Distribution Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Electronic Mail Distribution Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Electronic Mail Distribution


SUBJECT: ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION NRC INSPECTION REPORT 05000395/2008001 Distribution w/encl.:
SCE&G    4 Letter to Jeffrey from Eugene F. Guthrie dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION NRC INSPECTION REPORT 05000395/2008001 Distribution w/encl.:
C. Evans, RII EICS (Part 72 Only)  
C. Evans, RII EICS (Part 72 Only)
L. Slack, RII EICS OE Mail (email address if applicable)
R. Martin, NRR RIDSNRRDIRS PUBLIC


L. Slack, RII EICS OE Mail (email address if applicable) R. Martin, NRR RIDSNRRDIRS
Page 1 of 2      Summer 03/03/2008 08:12:34    Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type PI&R - PROBLEM IDENTIFICATION AND RESOLUTION    5 1 IP 71152B Identification and Resolution of Problems    03/10/2008 03/14/2008 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems    03/24/2008 03/28/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT    1 1 IP 7112101 Access Control to Radiologically Significant Areas    03/24/2008 03/26/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1    3 1 IP 7112101 Access Control to Radiologically Significant Areas    04/28/2008 05/02/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    04/28/2008 05/02/2008 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation    04/28/2008 05/02/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness    04/28/2008 05/02/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent    04/28/2008 05/02/2008 Baseline Inspections EB3-ISI - SUMMER - ISI      1 1 IP 7111108P Inservice Inspection Activities - PWR    05/05/2008 05/09/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2    3 1 IP 7112101 Access Control to Radiologically Significant Areas    05/05/2008 05/09/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls    05/05/2008 05/09/2008 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation    05/05/2008 05/09/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness    05/05/2008 05/09/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent    05/05/2008 05/09/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3      4 1 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/23/2008 06/27/2008 Generic Safety Inspection EB3TI172 - TI-172      1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds    07/07/2008 07/11/2008 Generic Safety Inspection EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION    10 1 IP 7111121 Component Design Bases Inspection    07/28/2008 08/01/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection    08/11/2008 08/15/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection    08/25/2008 08/29/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection    09/08/2008 09/12/2008 Baseline Inspections OL RQ - REQUAL INSPECTION      2 1 IP 7111111B Licensed Operator Requalification Program    08/11/2008 08/15/2008 Baseline Inspections PSB1-EP - EP INSP      1 1 IP 7111402 Alert and Notification System Testing    09/22/2008 09/26/2008 EP Baseline Inspection 1 IP 7111403 Emergency Response Organization Augmentation Testing    09/22/2008 09/26/2008 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes    09/22/2008 09/26/2008 EP Baseline Inspection 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies  09/22/2008 09/26/2008 EP Baseline Inspection This report does not include INPO and OUTAGE activities.


PUBLIC
This report shows only on-site and announced inspection procedures.


SummerInspection / Activity Plan03/01/2008
Page 2 of 2      Summer 03/03/2008 08:12:34    Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit      No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type PSB1-EP - EP INSP      1 1 IP 71151-EP01 Drill/Exercise Performance    09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation    09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System    09/22/2008 09/26/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP    3 1  V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES  01/05/2009 01/09/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1    3 1  V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES  02/02/2009 02/06/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2    3 1  V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES  02/09/2009 02/13/2009 Not Applicable PSB1EP - EP EXERCISE    3 1 IP 7111401 Exercise Evaluation    03/30/2009 04/03/2009 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes  03/30/2009 04/03/2009 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance    03/30/2009 04/03/2009 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation    03/30/2009 04/03/2009 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System   03/30/2009 04/03/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
-06/30/2009InspectionTypeInspection ActivityPlanned DatesStart EndNo. of Staffon SiteTitleUnitNumberPage 1 of 203/03/200808:12:34Report 22 5PI&R-PROBLEM IDENTIFICATION AND RESOLUTIONBaseline InspectionsIdentification and Resolution of Problems03/10/200803/14/20081 71152BIPBaseline InspectionsIdentification and Resolution of Problems03/24/200803/28/20081 71152BIP 1PSB1-RP-RADIATION PROTECTION PREINSPECTION VISITBaseline InspectionsAccess Control to Radiologically Significant Areas03/24/200803/26/20081 7112101IP 3PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK1Baseline InspectionsAccess Control to Radiologically Significant Areas04/28/200805/02/20081 7112101IPBaseline InspectionsALARA Planning and Controls04/28/200805/02/20081 7112102IPBaseline InspectionsRadioactive Material Processing and Transportation04/28/200805/02/20081 7112202IPBaseline InspectionsOccupational Exposure Control Effectiveness04/28/200805/02/20081 71151-OR01IPBaseline InspectionsRETS/ODCM Radiological Effluent04/28/200805/02/20081 71151-PR01IP 1EB3-ISI-SUMMER - ISIBaseline InspectionsInservice Inspection Activities - PWR05/05/200805/09/20081 7111108PIP 3PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK2Baseline InspectionsAccess Control to Radiologically Significant Areas05/05/200805/09/20081 7112101IPBaseline InspectionsALARA Planning and Controls05/05/200805/09/20081 7112102IPBaseline InspectionsRadioactive Material Processing and Transportation05/05/200805/09/20081 7112202IPBaseline InspectionsOccupational Exposure Control Effectiveness05/05/200805/09/20081 71151-OR01IPBaseline InspectionsRETS/ODCM Radiological Effluent05/05/200805/09/20081 71151-PR01IP 4TI-171-B.5.B PHASE 2&3Generic Safety InspectionVerification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies06/23/200806/27/20081 2515/171IP 1EB3TI172-TI-172Generic Safety InspectionReactor Coolant System Dissimiliar Metal Butt Welds07/07/200807/11/20081 2515/172IP10EB1-CDBI-COMPONENT DESIGN BASIS INSPECTIONBaseline InspectionsComponent Design Bases Inspection07/28/200808/01/20081 7111121IPBaseline InspectionsComponent Design Bases Inspection08/11/200808/15/20081 7111121IPBaseline InspectionsComponent Design Bases Inspection08/25/200808/29/20081 7111121IPBaseline InspectionsComponent Design Bases Inspection09/08/200809/12/20081 7111121IP 2OL RQ-REQUAL INSPECTIONBaseline InspectionsLicensed Operator Requalification Program08/11/200808/15/20081 7111111BIP 1PSB1-EP-EP INSPEP Baseline InspectionAlert and Notification System Testing09/22/200809/26/20081 7111402IPEP Baseline InspectionEmergency Response Organization Augmentation Testing09/22/200809/26/20081 7111403IPEP Baseline InspectionEmergency Action Level and Emergency Plan Changes09/22/200809/26/20081 7111404IPEP Baseline InspectionCorrection of Emergency Preparedness Weaknesses and Deficiencies09/22/200809/26/20081 7111405IPThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


SummerInspection / Activity Plan03/01/2008
This report shows only on-site and announced inspection procedures.
-06/30/2009InspectionTypeInspection ActivityPlanned DatesStart EndNo. of Staffon SiteTitleUnitNumberPage 2 of 203/03/200808:12:34Report 22 1PSB1-EP-EP INSPBaseline InspectionsDrill/Exercise Performance09/22/200809/26/20081 71151-EP01IPBaseline InspectionsERO Drill Participation09/22/200809/26/20081 71151-EP02IPBaseline InspectionsAlert & Notification System09/22/200809/26/20081 71151-EP03IP 3OL EXAM-INITIAL EXAM PREPNot ApplicableSUMMER/JANUARY 2009 EXAM AT POWER FACILITIES01/05/200901/09/20091 V23297 3OL EXAM-INITIAL EXAM - WEEK 1Not ApplicableSUMMER/JANUARY 2009 EXAM AT POWER FACILITIES02/02/200902/06/20091 V23297 3OL EXAM-INITIAL EXAM - WEEK 2Not ApplicableSUMMER/JANUARY 2009 EXAM AT POWER FACILITIES02/09/200902/13/20091 V23297 3PSB1EP-EP EXERCISEEP Baseline InspectionExercise Evaluation03/30/200904/03/20091 7111401IPEP Baseline InspectionEmergency Action Level and Emergency Plan Changes03/30/200904/03/20091 7111404IPBaseline InspectionsDrill/Exercise Performance03/30/200904/03/20091 71151-EP01IPBaseline InspectionsERO Drill Participation03/30/200904/03/20091 71151-EP02IPBaseline InspectionsAlert & Notification System03/30/200904/03/20091 71151-EP03IPThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 20:02, 14 November 2019

Annual Assessment Letter (IR 05000395-08-001)
ML080630301
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/03/2008
From: Eugene Guthrie
NRC/RGN-II/DRP/RPB5
To: Archie J
South Carolina Electric & Gas Co
References
IR-08-001
Download: ML080630301 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION (NRC INSPECTION REPORT 05000395/2008001)

Dear Mr. Archie:

On February 6, 2008, the NRC staff completed its performance review of the Virgil C. Summer Nuclear Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

SCE&G 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Enclosure: Summer Inspection/Activity Plan (03/01/08 - 06/30/09)

cc w/encl.: (See page 3)

_________________________

OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/

NAME JDodson DArnertt LGarner EGuthrie DATE 2/28/08 2/27/08 3/3/08 3/3/08 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

SCE&G 3 cc w/encl.:

Kathryn M. Sutton, Esq.

Morgan, Lewis & Bockius LLP Electronic Mail Distribution Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Electronic Mail Distribution Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company Electronic Mail Distribution

SCE&G 4 Letter to Jeffrey from Eugene F. Guthrie dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION NRC INSPECTION REPORT 05000395/2008001 Distribution w/encl.:

C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

R. Martin, NRR RIDSNRRDIRS PUBLIC

Page 1 of 2 Summer 03/03/2008 08:12:34 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 IP 71152B Identification and Resolution of Problems 03/10/2008 03/14/2008 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 03/24/2008 03/28/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/24/2008 03/26/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 3 1 IP 7112101 Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/28/2008 05/02/2008 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/28/2008 05/02/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 04/28/2008 05/02/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 04/28/2008 05/02/2008 Baseline Inspections EB3-ISI - SUMMER - ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 05/05/2008 05/09/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 3 1 IP 7112101 Access Control to Radiologically Significant Areas 05/05/2008 05/09/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 05/05/2008 05/09/2008 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 05/05/2008 05/09/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 05/05/2008 05/09/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 05/05/2008 05/09/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 4 1 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/23/2008 06/27/2008 Generic Safety Inspection EB3TI172 - TI-172 1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 07/07/2008 07/11/2008 Generic Safety Inspection EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 10 1 IP 7111121 Component Design Bases Inspection 07/28/2008 08/01/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 08/11/2008 08/15/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 08/25/2008 08/29/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 09/08/2008 09/12/2008 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 08/11/2008 08/15/2008 Baseline Inspections PSB1-EP - EP INSP 1 1 IP 7111402 Alert and Notification System Testing 09/22/2008 09/26/2008 EP Baseline Inspection 1 IP 7111403 Emergency Response Organization Augmentation Testing 09/22/2008 09/26/2008 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/22/2008 09/26/2008 EP Baseline Inspection 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/22/2008 09/26/2008 EP Baseline Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Summer 03/03/2008 08:12:34 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-EP - EP INSP 1 1 IP 71151-EP01 Drill/Exercise Performance 09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 09/22/2008 09/26/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 09/22/2008 09/26/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23297 SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009 Not Applicable PSB1EP - EP EXERCISE 3 1 IP 7111401 Exercise Evaluation 03/30/2009 04/03/2009 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/30/2009 04/03/2009 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance 03/30/2009 04/03/2009 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 03/30/2009 04/03/2009 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 03/30/2009 04/03/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.