February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION - REPORT 05000395/2023006
Dear Eric Carr:
The NRC has completed its end-of-cycle performance assessment of Virgil C. Summer Nuclear Station (VC Summer), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at VC Summer during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on one inspection finding having low to moderate safety significance (White) in the Mitigating Systems Cornerstone originating in the fourth quarter of 2023, and all PIs within the expected range (Green). Since the end of the previous assessment period (December 31, 2022), VC Summer transitioned from the Regulatory Response column (Column 2) to the Licensee Response column (Column 1) on June 8, 2023 following successful completion of two supplemental inspections (95001) associated with two White findings.
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct supplemental inspections in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The 95001 is performed to ensure that the root and contributing causes of issues are understood, the extent of condition and extent of cause are identified, that completed corrective actions to address and preclude repetition of performance issues are prompt and effective, and that pending corrective action plans direct prompt and effective actions to address and preclude repetition of performance issues. On January 25, 2024, the NRC was notified of your readiness for the supplemental inspection to review the actions taken to address the performance issues associated with the Mitigating Systems Cornerstone finding. Therefore, the NRC has scheduled this supplemental inspection for the week of March 18, 2024.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact David Dumbacher at 404-997-4628 with any questions you have regarding this letter.
Sincerely, Mark Franke, Director Division of Reactor Projects Docket No. 05000395 License No. NPF-12 Enclosure:
Summer Activity/Inspection Plan (3/1/2024 - 12/31/2025)
cc:
w/ encl: Distribution via LISTSERV Signed by Franke, Mark on 02/28/24
Site Inspection Activity Plan Prepared on 2/21/2024 1:53:16 PM 1 of 2 Summer 03/01/2024 - 12/31/2025 EMERGENCY PREPAREDNESS PROGRAM INSPECTION
1 3/4/2024 3/8/2024 IP 71114.02 000717 Alert and Notification System Testing
3/4/2024 3/8/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
3/4/2024 3/8/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
3/4/2024 3/8/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness
3/4/2024 3/8/2024 IP 71151 001397 Performance Indicator Verification VC SUMMER EDG 95001
1 3/17/2024 3/23/2024 IP 95001 000938 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)
1 3/25/2024 3/29/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
4/8/2024 4/12/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection SECURITY BASELINE INSPECTION
1 7/29/2024 8/1/2024 IP 71130.02 000734 Access Control
7/29/2024 8/1/2024 IP 71130.09 001656 Security Plan Changes
7/29/2024 8/1/2024 IP 71151 001338 Performance Indicator Verification RP PUBLIC RAD SAFETY BASELINE INSPECTION
1 8/12/2024 8/16/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
8/12/2024 8/16/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program
8/12/2024 8/16/2024 IP 71151 000746 Performance Indicator Verification CYBER SECURITY INSPECTION
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1 9/23/2024 9/27/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
9/23/2024 9/27/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
9/23/2024 9/27/2024 IP 71124.04 000728 Occupational Dose Assessment
9/23/2024 9/27/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation
9/23/2024 9/27/2024 IP 71151 000746 Performance Indicator Verification
10/7/2024 10/11/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/7/2024 10/11/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
10/7/2024 10/11/2024 IP 71124.04 000728 Occupational Dose Assessment
10/7/2024 10/11/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation
10/7/2024 10/11/2024 IP 71151 000746 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION +SG
1 8/19/2024 8/23/2024 IP 71130.10 000741 Cybersecurity Unit Start End Activity CAC Title Staff Count
Site Inspection Activity Plan Prepared on 2/21/2024 1:53:16 PM 2 of 2
9/30/2024 10/11/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1 5/12/2025 5/16/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
5/12/2025 5/16/2025 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event
5/12/2025 5/16/2025 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (AGE-RELATED)
1 6/9/2025 6/13/2025 IP 71111.21N.04 001832 Age-Related Degradation
6/23/2025 6/27/2025 IP 71111.21N.04 001832 Age-Related Degradation SECURITY BASELINE INSPECTION
1 7/14/2025 7/17/2025 IP 71130.02 000734 Access Control
7/14/2025 7/17/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
7/14/2025 7/17/2025 IP 71130.07 000739 Security Training
7/14/2025 7/17/2025 IP 71130.09 001656 Security Plan Changes
7/14/2025 7/17/2025 IP 71151 001338 Performance Indicator Verification SUMMER REQUAL
1 8/10/2025 8/16/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance PROBLEM IDENTIFICATION AND RESOLUTION
1 10/6/2025 10/10/2025 IP 71152B 000747 Problem Identification and Resolution
10/20/2025 10/24/2025 IP 71152B 000747 Problem Identification and Resolution SUMMER INITIAL LICENSE EXAM
1 9/28/2025 10/4/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
10/12/2025 10/25/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION
1 10/20/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/20/2025 10/24/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification OPERATION OF AN ISFSI