UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 July 23, 2008 Mr. Jeffrey Vice President South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065 SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000395/2008008

Dear Mr. Archie:

On June 27, 2008, the United States Nuclear Regulatory Commission (NRC) completed a team inspection at your Virgil C. Summer Nuclear Station. The enclosed report documents the inspection results, which were discussed with you and other members of your staff on June 27, 2008.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of the inspection, one NRC-identified finding of very low safety significance was identified. However, because this violation was of very low safety significance and because it was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRCs Enforcement Policy.

Enclosures Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. SCE&G 2 If you contest any NCV in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Virgil C. Summer Nuclear Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Mark A. Bates, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.: 50-395 License No.: NPF-12 Nonpublic Enclosure: Inspection Report 05000395/2008008 w/Attachment: Supplemental Information cc w/encl: (See next page) Enclosure: PUBLICLY AVAILABLE X NON-PUBLICLY AVAILABLE X SENSITIVE NON-SENSITIVE ADAMS: ACCESSION NUMBER:

OFFICE RII:DRP RII:DRS HQ: NRR RII: DRP HQ: NRR SIGNATURE /RA By E-mail/ /RA by E-mail /RA By MBates/ /RA By MBates/ /RA By E-mail/

NAME JPolickoski RLewis JGreene JDodson DNelson DATE 7/ 23/2008 7/22/2008 7/23/2008 7/23/2008 7/23/2008 7/ /2008 7/ /2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SCE&G 3 cc w/encl:

R. J. White Nuclear Coordinator S.C. Public Service Authority Mail Code 802 Electronic Mail Distribution Kathryn M. Sutton, Esq.

Morgan, Lewis & Bockius LLP Electronic Mail Distribution Susan Jenkins Director Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Electronic Mail Distribution Robert M. Fowlkes General Manager Engineering Services South Carolina Electric & Gas Company Electronic Mail Distribution Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company Electronic Mail Distribution David A. Lavigne General Manager Organization Development South Carolina Electric & Gas Company Electronic Mail Distribution SCE&G 4 Letter to Jeffrey from Mark A. Bates dated July 23, 2008 SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000395/2008008 Distribution w/encl:

L. Reyes, RA V. McCree, DRA L. Wert, DRP J. Moorman, DRP (Acting)

K. Kennedy, DRS R. Croteau, DRS H. Christensen, DRS M. Bates, DRP J. Dodson, DRP J. Zeiler, DRP J. Polickoski, DRP R. Lewis, DRS E. Bowman, NRR R. Martin, NRR (PM: HAT, SUM)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS Region II Docket Room (with concurrences)

Distribution w/o encl:

PUBLIC