| number = ML090090644
| number = ML090090644
| issue date = 01/09/2009
| issue date = 01/09/2009
| title = Waterford 3 - Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2009006) and Request for Information
| title = Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2009006) and Request for Information
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Walsh K
| addressee name = Walsh K
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000382/2009006]]
See also: [[see also::IR 05000382/2009006]]


=Text=
=Text=
{{#Wiki_filter:January 9, 2009  
{{#Wiki_filter:UNITED STATES
  Kevin Walsh, Vice President, Operations Entergy Operations, Inc.  
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093  
                                                    R E GI ON I V
SUBJECT: WATERFORD 3 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000382/2009006) AND REQUEST FOR INFORMATION  
                                        612 EAST LAMAR BLVD , SU I TE 400
Dear Mr. Walsh:  
                                          AR LI N GTON , TEXAS 76011-4125
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC), Region IV staff will conduct a triennial fire protection baseline inspection at your Waterford 3  
                                            January 9, 2009
facility in April 2009. The inspection team will be comprised of reactor inspectors from the NRC Region IV office. The team will conduct the inspection in accordance with the baseline Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."
Kevin Walsh, Vice President, Operations
The schedule for the inspection is as follows:  
Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3
17265 River Road
Killona, LA 70057-3093
SUBJECT:         WATERFORD 3 - NOTIFICATION OF AN NRC TRIENNIAL FIRE
                  PROTECTION BASELINE INSPECTION (NRC INSPECTION
                  REPORT 05000382/2009006) AND REQUEST FOR INFORMATION
Dear Mr. Walsh:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at your Waterford 3
facility in April 2009. The inspection team will be comprised of reactor inspectors from the NRC
Region IV office. The team will conduct the inspection in accordance with the baseline
Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."
The schedule for the inspection is as follows:
          *      Information gathering visit:      March 24 - 26, 2009
          *      Onsite inspection:                April 06 - 10, 2009
                                                    April 27 - May 1, 2009
Two individuals will participate in the information gathering visit, to select the fire areas for
evaluation, identify additional documents needed to support the inspection, obtain unescorted
access, meet with the key personnel who will support the inspection, and become familiar with
your fire protection program. The enclosure to this letter provides an initial list of the documents
the team will want to review. We request that your staff transmit copies of the documents listed
in the enclosure to the NRC Region IV office for team use in preparation for the inspection.
Please send this information so that it will arrive in our office in Arlington, Texas, by the dates
listed in the enclosure.
We request that during the onsite inspection weeks, you ensure that copies of analyses,
evaluations, or documentation regarding the implementation and maintenance of the fire
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest are those documents that establish that your fire
protection program satisfies the NRC regulatory requirements and conforms to applicable NRC
and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant
systems required to achieve and maintain safe shutdown conditions from inside and outside the
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant
fire protection systems, and (4) the fire protection program and its implementation should be
available to support the team at the site during the inspection.


* Information gathering visit:  March 24 - 26, 2009
Entergy Operations, Inc                        -2-
* Onsite inspection: April 06 - 10, 2009    April 27 - May 1, 2009
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection or the inspection team's information or logistical needs, please
contact the lead inspector, Greg Pick, at 817-860-8270.
                                              Sincerely,
                                                /RA/
                                              Neil OKeefe, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket: 50-382
License: NPF-38
Enclosure: Triennial Fire Protection
  Inspection Supporting Documentation


Two individuals will participate in the information gathering visit, to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, meet with the key personnel who will support the inspection, and become familiar with your fire protection program. The enclosure to this letter provides an initial list of the documents
Entergy Operations, Inc                  -3-
the team will want to review. We request that your staff transmit copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspectionPlease send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.  
Senior Vice President
We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire
Entergy Nuclear Operations
protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest are those documents that establish that your fire protection program satisfies the NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance.  Also, appropriate personnel knowledgeable of:  (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the
P.O. Box 31995
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant fire protection systems, and (4) the fire protection program and its implementation should be available to support the team at the site during the inspection.  
Jackson, MS 39286-1995
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Senior Vice President and
Entergy Operations, Inc - 2 -
  Chief Operating Officer
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Entergy Operations, Inc.
Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact the lead inspector, Greg Pick, at 817-860-8270.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Operations Support
Entergy Services, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Senior Manager, Nuclear Safety
  and Licensing
Entergy Services, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Site Vice President
Waterford Steam Electric Station, Unit 3
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Director
Nuclear Safety Assurance
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
Manager, Licensing
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-3093
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, LA 70825-1697


      Sincerely,
Entergy Operations, Inc                -4-
/RA/        Neil O'Keefe, Chief      Engineering Branch 2
Richard Penrod, Senior Environmental
      Division of Reactor Safety
  Scientist, State Liaison Officer
Docket:  50-382 License:  NPF-38
Office of Environmental Services
Northwestern State University
Enclosure:  Triennial Fire Protection    Inspection Supporting Documentation 
Russsell Hall, Room 201
Entergy Operations, Inc - 3 -
Natchitoches, LA 71497
  Senior Vice President  Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
Parish President Council
St. Charles Parish
P.O. Box 302
Hahnville, LA 70057
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601
Louisiana Department of Environmental
Quality Radiological Emergency Planning
and Response Division
P.O. Box 4312
Baton Rouge, LA 70821-4312
Louisiana Department of Environmental
  Quality
Office of Environmental Compliance
P.O. Box 4312
Baton Rouge, LA 70821-4312
Lisa R. Hammond, Chief
Technological Hazards Branch
National Preparedness Division
FEMA Region VI
800 N. Loop 288
Denton, TX 76209


Senior Vice President and    Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995
Entergy Operations, Inc                     -5-
Jackson, MS  39286-1995
Electronic distribution by RIV:
Vice President, Operations Support Entergy Services, Inc. P.O. Box 31995 Jackson, MS 39286-1995
Regional Administrator (Elmo.Collins@nrc.gov)
   
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc. P.O. Box 31995 Jackson, MS  39286-1995
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Ray.Azua@nrc.gov)
Resident Inspector (Dean.Overland@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)
WAT Site Secretary (Vacant)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following:
DRS STA (Dale.Powers@nrc.gov)
S. Williams, OEDO RIV Coordinator (Shawn.Williams@nrc.gov)
ROPreports
File located:
SUNSI Rev Compl.          Yes    No ADAMS    Yes    No    Reviewer Initials
  Publicly Avail            Yes    No Sensitive Yes    No    Sens. Type Initials
EB2                      C: EB 2
G.Pick                  N.OKeefe
/RA/                    RLatta for
01/ 7 /09                01/9 /09
OFFICIAL RECORD COPY                              T=Telephone      E=E-mail      F=Fax


Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. 17265 River Road
                                              ENCLOSURE
Killona, LA 70057-0751
                Triennial Fire Protection Inspection Documentation Requested
Director Nuclear Safety Assurance Entergy Operations, Inc.  
Please provide the following documentation items 1 - 4 prior to the onsite information-gathering
17265 River Road Killona, LA 70057-0751
visit, preferably no later than March 6, 2009. Where practical, please provide copies
General Manager, Plant Operations Waterford 3 SES
electronically.
Entergy Operations, Inc. 17265 River Road Killona, LA  70057-0751
1.      The current version of your fire protection program and fire hazards analysis.
Manager, Licensing Entergy Operations, Inc. 17265 River Road
2.      Post-fire safe shutdown analysis and the supporting calculations that demonstrate
Killona, LA  70057-3093
        acceptable plant response.
Chairman Louisiana Public Service Commission P.O. Box 91154
3.      Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,
Baton Rouge, LA  70825-1697
        pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters
 
        to/from the NRC regarding fire protection/fire safe shutdown, etc.).
Entergy Operations, Inc - 4 -  
4.      The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant
Richard Penrod, Senior Environmental    Scientist, State Liaison Officer Office of Environmental Services Northwestern State University 
        Examination for External Events report addressing fire events.
Russsell Hall, Room 201 Natchitoches, LA  71497
5.       Plant layout and equipment drawings for the selected fire areas (these areas will be
Parish President Council St. Charles Parish
        selected during the information gathering trip) that identify: (a) the physical plant
P.O. Box 302 Hahnville, LA  70057
        locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or
Director, Nuclear Safety & Licensing Entergy, Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601
        fire zone delineation; and (c) the locations of fire protection equipment, such as
        detection, suppression, and post-fire emergency lighting units; and (d) fire area
        boundaries.
Please provide the following documentation items 5 - 34 during the information-gathering visit or
by March 27, 2009, in order to support inspection preparation. Whenever practical, please
provide copies electronically. However, drawings should be provided as paper copies of
sufficient size that all details are legible.
6.       Fire protection program implementing procedures (e.g., administrative controls, operator
        response procedures for fires, fire fighting procedures, etc.).
7.      Operating procedures used for achieving and maintaining hot and cold shutdown
        conditions from the control room in the event of a fire outside the control room (III.G.2
        areas).
8.      Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)
        capability with or without control room evacuation.
9.      Pre-fire plans for the selected fire areas (areas to be selected by the team during the
        information-gathering trip).
10.      A list of equipment used to achieve and maintain hot standby and cold shutdowns in the
        event of a fire (safe shutdown equipment lists).
                                              -1-                                  Enclosure


Louisiana Department of Environmental  Quality Radiological Emergency Planning  and Response Division P.O. Box 4312
11. Piping and instrumentation (flow) diagrams showing the components used to achieve
Baton Rouge, LA 70821-4312
    and maintain hot standby and cold shutdown for normal and alternate shutdown. Please
Louisiana Department of Environmental    Quality  Office of Environmental Compliance
    provide one copy of the piping and instrumentation (flow) diagrams for these systems of
P.O. Box 4312 Baton Rouge, LA 70821-4312
    a size sufficient to read all details. These should include the systems used for RCS
Lisa R. Hammond, Chief Technological Hazards Branch
    makeup, RCS pressure control, decay heat removal, and reactivity control, including the
National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX  76209
    essential support systems.
 
12. A listing of design change packages which were determined to impact fire protection and
Entergy Operations, Inc - 5 -
    post-fire safe shutdowns, performed in the last 3 years.
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov)  DRS Director (Roy.Caniano@nrc.gov)  DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Ray.Azua@nrc.gov) Resident Inspector (Dean.Overland@nrc.gov)  Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) WAT Site Secretary (Vacant) Public Affairs Officer (Victor.Dricks@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov) 
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
Only inspection reports to the following: DRS STA (Dale.Powers@nrc.gov) S. Williams, OEDO RIV Coordinator (Shawn.Williams@nrc.gov)  ROPreports
14. A listing of open and closed corrective action documents initiated in the last 3 years,
    which relate to the fire protection program or equipment. Include corrective action
   
    document number, date, and subject.
   
15. A listing of the applicable codes and standards (with the versions) related to the design
   
    of plant fire protection features and evaluations of any code deviations.
File located:  SUNSI Rev Compl. Yes  No ADAMS  Yes  No Reviewer Initials 
16. Drawings of the portions of the emergency lighting system which support fire response.
Publicl y Avail Yes  No SensitiveYes NoSens. T ype Initials
17. Procedures used to remove smoke from safety-related areas and the engineering
EB2 C: EB 2    G.Pick N.O'Keefe    /RA/ RLatta for    01/ 7 /09 01/9 /09    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
    studies or calculations which support the design basis.
      
18. Drawings of communication systems credited in the license basis for firefighting and
  - 1 - Enclosure ENCLOSURE 
    plant operations during fires where control room is occupied and/or evacuated.
Triennial Fire Protection Inspection Documentation Requested
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
20. A listing of maintenance and surveillance testing procedures for alternative shutdown
Please provide the following documentation items 1 - 4 prior to the onsite information-gathering visit, preferably no later than March 6, 2009.  Where practical, please provide copies electronically. 
    capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance Rule performance criteria and a summary of the last 3 years performance
    history for fire protection program systems or functions monitored within the
    Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation,
    surveillance test requirements) covered by Technical Specifications, Technical
    Requirements Manual, Updated Final Safety Analysis Report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar
    reviews related to post-fire safe shutdown capability or the fire protection program
    completed since August 1, 2006.
24. A list of manual actions taken outside the control room which are credited to mitigate the
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
    group actions by the initiating fire area or zone and indicate where the action must take
     place.
                                          -2-                                 Enclosure


1. The current version of your fire protection program and fire hazards analysis.
25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response. 
    basis documents that describe the purpose/function/operating characteristics of the safe
3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports, pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).
    shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay
4. The Fire Probabilistic Risk Assessment or portions of the plant's Individual Plant Examination for External Events report addressing fire events.
    heat removal, and reactivity control, including the essential support systems).
5. Plant layout and equipment drawings for the selected fire areas (these areas will be selected during the information gathering trip) that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as
26. Two copies of one-line diagrams of the electrical distribution system. These should
detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries.
    depict how power gets from the switchyard to the engineered safety feature loads (480V
Please provide the following documentation items 5 - 34 during the information-gathering visit or by March 27, 2009, in order to support inspection preparation.  Whenever practical, please
    and 4160V). Also, include the vital DC distribution system one-line diagrams.
provide copies electronically.  However, drawings should be provided as paper copies of sufficient size that all details are legible. 
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
6. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.). 
    giving location and the key equipment being protected.
7. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas).  8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or
9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip). 
    maintain hot shutdown and b) reach and/or maintain cold shutdown.
10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the event of a fire (safe shutdown equipment lists). 
29. A list of high to low pressure interface valves.
  - 2 - Enclosure 11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please provide one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for RCS
30. A copy of procedures governing the training and operation of the fire brigade.
makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.
31. Organization charts of site personnel down to the level of fire protection staff personnel.
12. A listing of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed in the last 3 years.
32. A contact list of key site personnel who will be supporting this inspection, giving location
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
    of their office and phone number onsite.
14. A listing of open and closed corrective action documents initiated in the last 3 years, which relate to the fire protection program or equipment.  Include corrective action document number, date, and subject.
33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
    during the week of April 27, 2009. Please put us in contact with the appropriate
15. A listing of the applicable codes and standards (with the versions) related to the design of plant fire protection features and evaluations of any code deviations.
    personnel for planning drills during the onsite information gathering trip.
16. Drawings of the portions of the emergency lighting system which support fire response. 
34. The team would like to perform a walkthrough of the procedure for control room
    evacuation due to fire with qualified operators in the plant during the week of
17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations which support the design basis.
    April 6, 2009. Please put us in contact with the appropriate personnel for planning the
18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.
    walkthrough during the onsite information gathering trip.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
                                          -3-                                  Enclosure
20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance Rule performance criteria and a summary of the last 3 years' performance history for fire protection program systems or functions monitored within the Maintenance Rule program.
22. A copy of fire protection program requirements (e.g. limiting conditions for operation, surveillance test requirements) covered by Technical Specifications, Technical
Requirements Manual, Updated Final Safety Analysis Report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed since August 1, 2006.
24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should group actions by the initiating fire area or zone and indicate where the action must take place. 
  - 3 - Enclosure 25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems).  
26. Two copies of one-line diagrams of the electrical distribution system. These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V). Also, include the vital DC distribution system one-line diagrams.
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected.  
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.  
29. A list of high to low pressure interface valves.  
 
30. A copy of procedures governing the training and operation of the fire brigade.  
31. Organization charts of site personnel down to the level of fire protection staff personnel.  
32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.  
33. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of April 27, 2009. Please put us in contact with the appropriate  
personnel for planning drills during the onsite information gathering trip.  
34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of April 6, 2009. Please put us in contact with the appropriate personnel for planning the  
walkthrough during the onsite information gathering trip.
}}
}}

Latest revision as of 09:58, 14 November 2019

Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2009006) and Request for Information
ML090090644
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/09/2009
From: O'Keefe N
NRC/RGN-IV/DRS/EB-2
To: Walsh K
Entergy Operations
References
IR-09-006
Download: ML090090644 (8)


See also: IR 05000382/2009006

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

January 9, 2009

Kevin Walsh, Vice President, Operations

Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road

Killona, LA 70057-3093

SUBJECT: WATERFORD 3 - NOTIFICATION OF AN NRC TRIENNIAL FIRE

PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000382/2009006) AND REQUEST FOR INFORMATION

Dear Mr. Walsh:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Waterford 3

facility in April 2009. The inspection team will be comprised of reactor inspectors from the NRC

Region IV office. The team will conduct the inspection in accordance with the baseline

Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."

The schedule for the inspection is as follows:

  • Information gathering visit: March 24 - 26, 2009
  • Onsite inspection: April 06 - 10, 2009

April 27 - May 1, 2009

Two individuals will participate in the information gathering visit, to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, meet with the key personnel who will support the inspection, and become familiar with

your fire protection program. The enclosure to this letter provides an initial list of the documents

the team will want to review. We request that your staff transmit copies of the documents listed

in the enclosure to the NRC Region IV office for team use in preparation for the inspection.

Please send this information so that it will arrive in our office in Arlington, Texas, by the dates

listed in the enclosure.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies the NRC regulatory requirements and conforms to applicable NRC

and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

fire protection systems, and (4) the fire protection program and its implementation should be

available to support the team at the site during the inspection.

Entergy Operations, Inc -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact the lead inspector, Greg Pick, at 817-860-8270.

Sincerely,

/RA/

Neil OKeefe, Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

Entergy Operations, Inc -3-

Senior Vice President

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Operations Support

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Site Vice President

Waterford Steam Electric Station, Unit 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Director

Nuclear Safety Assurance

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Manager, Licensing

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

Chairman

Louisiana Public Service Commission

P.O. Box 91154

Baton Rouge, LA 70825-1697

Entergy Operations, Inc -4-

Richard Penrod, Senior Environmental

Scientist, State Liaison Officer

Office of Environmental Services

Northwestern State University

Russsell Hall, Room 201

Natchitoches, LA 71497

Parish President Council

St. Charles Parish

P.O. Box 302

Hahnville, LA 70057

Director, Nuclear Safety & Licensing

Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Louisiana Department of Environmental

Quality Radiological Emergency Planning

and Response Division

P.O. Box 4312

Baton Rouge, LA 70821-4312

Louisiana Department of Environmental

Quality

Office of Environmental Compliance

P.O. Box 4312

Baton Rouge, LA 70821-4312

Lisa R. Hammond, Chief

Technological Hazards Branch

National Preparedness Division

FEMA Region VI

800 N. Loop 288

Denton, TX 76209

Entergy Operations, Inc -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ray.Azua@nrc.gov)

Resident Inspector (Dean.Overland@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)

WAT Site Secretary (Vacant)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Only inspection reports to the following:

DRS STA (Dale.Powers@nrc.gov)

S. Williams, OEDO RIV Coordinator (Shawn.Williams@nrc.gov)

ROPreports

File located:

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials

EB2 C: EB 2

G.Pick N.OKeefe

/RA/ RLatta for

01/ 7 /09 01/9 /09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Requested

Please provide the following documentation items 1 - 4 prior to the onsite information-gathering

visit, preferably no later than March 6, 2009. Where practical, please provide copies

electronically.

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,

pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4. The Fire Probabilistic Risk Assessment or portions of the plants Individual Plant

Examination for External Events report addressing fire events.

5. Plant layout and equipment drawings for the selected fire areas (these areas will be

selected during the information gathering trip) that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or

fire zone delineation; and (c) the locations of fire protection equipment, such as

detection, suppression, and post-fire emergency lighting units; and (d) fire area

boundaries.

Please provide the following documentation items 5 - 34 during the information-gathering visit or

by March 27, 2009, in order to support inspection preparation. Whenever practical, please

provide copies electronically. However, drawings should be provided as paper copies of

sufficient size that all details are legible.

6. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

7. Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

-1- Enclosure

11. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for normal and alternate shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of

a size sufficient to read all details. These should include the systems used for RCS

makeup, RCS pressure control, decay heat removal, and reactivity control, including the

essential support systems.

12. A listing of design change packages which were determined to impact fire protection and

post-fire safe shutdowns, performed in the last 3 years.

13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.

14. A listing of open and closed corrective action documents initiated in the last 3 years,

which relate to the fire protection program or equipment. Include corrective action

document number, date, and subject.

15. A listing of the applicable codes and standards (with the versions) related to the design

of plant fire protection features and evaluations of any code deviations.

16. Drawings of the portions of the emergency lighting system which support fire response.

17. Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

21. Maintenance Rule performance criteria and a summary of the last 3 years performance

history for fire protection program systems or functions monitored within the

Maintenance Rule program.

22. A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, Updated Final Safety Analysis Report, or similar documents.

23. Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since August 1, 2006.

24. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

-2- Enclosure

25. Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system (RCS) makeup, RCS pressure control, decay

heat removal, and reactivity control, including the essential support systems).

26. Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to the engineered safety feature loads (480V

and 4160V). Also, include the vital DC distribution system one-line diagrams.

27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown and b) reach and/or maintain cold shutdown.

29. A list of high to low pressure interface valves.

30. A copy of procedures governing the training and operation of the fire brigade.

31. Organization charts of site personnel down to the level of fire protection staff personnel.

32. A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of April 27, 2009. Please put us in contact with the appropriate

personnel for planning drills during the onsite information gathering trip.

34. The team would like to perform a walkthrough of the procedure for control room

evacuation due to fire with qualified operators in the plant during the week of

April 6, 2009. Please put us in contact with the appropriate personnel for planning the

walkthrough during the onsite information gathering trip.

-3- Enclosure