IR 05000334/2012006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/04/2012
| issue date = 09/04/2012
| title = Mid-Cycle Performance Review and Inspection Plan 2012 - Beaver Valley Power Station (Report 05000334/2012006 and 05000412/2012006)
| title = Mid-Cycle Performance Review and Inspection Plan 2012 - Beaver Valley Power Station (Report 05000334/2012006 and 05000412/2012006)
| author name = Hunegs G K
| author name = Hunegs G
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Harden P A
| addressee name = Harden P
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000412
| docket = 05000334, 05000412
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION    REGION I  2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012  
{{#Wiki_filter:UNITED STATES September 4, 2012


Mr. Paul Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077-0004
==SUBJECT:==
 
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/2012006 AND 05000412/2012006)
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/2012006 AND 05000412/2012006)


==Dear Mr. Harden:==
==Dear Mr. Harden:==
On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Beaver Valley Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the IMC 0305, "Reactor Oversight Process."
On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Beaver Valley Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the IMC 0305, Reactor Oversight Process.


The NRC determined the performance at Beaver Valley Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC
The NRC determined the performance at Beaver Valley Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.


Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agency's actions related to Fukushima, the NRC will perform TI-187, "Inspection of Near Term Task Force Recommendation 2.3 Flooding Walkdowns" and TI-188, "Inspection of Near Term Task Force Recommendation 2.3 Seismic Walkdowns." The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to di scuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near Term Task Force Recommendation 2.3 Seismic Walkdowns. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.


In accordance with 10 CFR 2.390 of the NRC
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room.
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room.


Please contact me at 610-337-5046 with any questions you have regarding this letter.
Please contact me at 610-337-5046 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Gordon K. Hunegs, Chief Projects Branch 6  
/RA/
 
Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 Enclosure: Beaver Valley Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ
Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73  
 
Enclosure: Beaver Valley Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ  


ML12240A242 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ADugandzic/ AD GHunegs/ GKH DATE 08/23 /12 08/ 27/12  
ML12240A242 Non-Sensitive Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ADugandzic/ AD GHunegs/ GKH DATE 08/23 /12 08/ 27/12


Page 1 of 2 08/27/2012 08:57:37 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 07/01/2012
Page 1 of 2     Beaver Valley 08/27/2012 08:57:37   Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 9/24EXM - BEAVER VALLEY U2 INITIAL OL EXAM     4 2 08/27/2012 08/31/2012 U01850 FY12-BV2 INITIAL OPERATOR LICENSING EXAM 2 09/24/2012 10/05/2012 U01850 FY12-BV2 INITIAL OPERATOR LICENSING EXAM 7111111B - BV1 ON-SITE REQUAL INSP W/ P/F RESULTS     2 1, 2 07/29/2012 08/02/2012 IP 7111111B Licensed Operator Requalification Program TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION     6 1, 2 07/23/2012 07/27/2012 IP 7111105T Fire Protection [Triennial]
-12/31/2013 9/24EXM-BEAVER VALLEY U2 INITIAL OL EXAM 4 2 FY12-BV2 INITIAL OPERATOR LICENSING EXAM U01850 08/27/2012 08/31/2012 2 FY12-BV2 INITIAL OPERATOR LICENSING EXAM U01850 09/24/2012 10/05/2012 7111111B-BV1 ON-SITE REQUAL INSP W/ P/F RESULTS 2 1, 2 IP Licensed Operator Requalification Program 7111111B 07/29/2012 08/02/2012 TRI FI-TRIENNIAL FIRE PROTECTION INSPECTION 6 1, 2 IP Fire Protection [Triennial]
1, 2 07/23/2012 07/27/2012 IP 7111105T-B.5.b B.5.b Mitigating Strategies 1, 2 08/06/2012 08/10/2012 IP 7111105T Fire Protection [Triennial]
7111105T 07/23/2012 07/27/2012 1, 2 IP B.5.b Mitigating Strategies 7111105T-B.5.b 07/23/2012 07/27/2012 1, 2 IP Fire Protection [Triennial]
71124.08 - RADWASTE        1 1, 2 08/13/2012 08/17/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TI-177 - MANAGING GAS ACCUMULATION IN ECCS     3 1, 2 09/10/2012 09/14/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124 - OCC RADIATION SAFETY       1 1, 2 09/24/2012 09/28/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/24/2012 09/28/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/24/2012 09/28/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/24/2012 09/28/2012 IP 71124.04 Occupational Dose Assessment 7111108P - U2 INSERVICE INSPECTION       1 2 10/01/2012 10/05/2012 IP 7111108P Inservice Inspection Activities - PWR 2 10/15/2012 10/19/2012 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP INSTRUMENTATION       1 1, 2 12/03/2012 12/07/2012 IP 71124.05 Radiation Monitoring Instrumentation MODS - PERMANENT PLANT MODIFICATIONS     6 1, 2 01/28/2013 02/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 02/11/2013 02/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EP PROGR - EP PROGRAM INSPECTION       1 1, 2 03/25/2013 03/29/2013 IP 7111402 Alert and Notification System Testing 1, 2 03/25/2013 03/29/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/25/2013 03/29/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/25/2013 03/29/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - OCC RADIATION SAFETY       1 1, 2 04/01/2013 04/05/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/01/2013 04/05/2013 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
7111105T 08/06/2012 08/10/2012 71124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/13/2012 08/17/2012 TI-177-MANAGING GAS ACCUMULATION IN ECCS 3 1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 09/10/2012 09/14/2012 71124-OCC RADIATION SAFETY 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2012 09/28/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/24/2012 09/28/2012 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2012 09/28/2012 1, 2 IP Occupational Dose Assessment 71124.04 09/24/2012 09/28/2012 7111108P-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 10/01/2012 10/05/2012 2 IP Inservice Inspection Activities - PWR 7111108P 10/15/2012 10/19/2012 71124-HP INSTRUMENTATION 1 1, 2 IP Radiation Monitoring Instrumentation 71124.05 12/03/2012 12/07/2012 MODS-PERMANENT PLANT MODIFICATIONS 6 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/28/2013 02/01/2013 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 02/11/2013 02/15/2013 EP PROGR-EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 03/25/2013 03/29/2013 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/25/2013 03/29/2013 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 03/25/2013 03/29/2013 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/25/2013 03/29/2013 71124-OCC RADIATION SAFETY 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2013 04/05/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/01/2013 04/05/2013 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2 08/27/2012 08:57:37 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 07/01/2012
Page 2 of 2     Beaver Valley 08/27/2012 08:57:37   Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site 71124 - OCC RADIATION SAFETY   1 1, 2 04/01/2013 04/05/2013 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK   1 1, 2 05/13/2013 05/17/2013 IP 7111107T Heat Sink Performance 71124 - RADIO EFFLUENTS     1 1, 2 06/10/2013 06/14/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - REMP     1 1, 2 06/24/2013 06/28/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111111B - BV2 REQUAL INSPECTION WITH P/F RESULTS   2 2 10/14/2013 10/18/2013 IP 7111111B Licensed Operator Requalification Program 7111108P - U1 INSERVICE INSPECTION   1 1 10/07/2013 10/18/2013 IP 7111108P Inservice Inspection Activities - PWR PI&R - PI&R     4 1, 2 11/18/2013 11/22/2013 IP 71152B Problem Identification and Resolution 1, 2 12/02/2013 12/06/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
-12/31/2013 71124-OCC RADIATION SAFETY 1 1, 2 IP Occupational Dose Assessment 71124.04 04/01/2013 04/05/2013 7111107T-TRIENNIAL HEAT SINK 1 1, 2 IP Heat Sink Performance 7111107T 05/13/2013 05/17/2013 71124-RADIO EFFLUENTS 1 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/10/2013 06/14/2013 71124-REMP 1 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/24/2013 06/28/2013 7111111B-BV2 REQUAL INSPECTION WITH P/F RESULTS 2 2 IP Licensed Operator Requalification Program 7111111B 10/14/2013 10/18/2013 7111108P-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR 7111108P 10/07/2013 10/18/2013 PI&R-PI&R 4 1, 2 IP Problem Identification and Resolution 71152B 11/18/2013 11/22/2013 1, 2 IP Problem Identification and Resolution 71152B 12/02/2013 12/06/2013 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 00:18, 12 November 2019

Mid-Cycle Performance Review and Inspection Plan 2012 - Beaver Valley Power Station (Report 05000334/2012006 and 05000412/2012006)
ML12240A242
Person / Time
Site: Beaver Valley
Issue date: 09/04/2012
From: Hunegs G
NRC/RGN-I/DRP/PB6
To: Harden P
FirstEnergy Nuclear Operating Co
HUNEGS, GK
References
IR-12-006
Download: ML12240A242 (5)


Text

UNITED STATES September 4, 2012

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/2012006 AND 05000412/2012006)

Dear Mr. Harden:

On August 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Beaver Valley Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011 through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into the IMC 0305, Reactor Oversight Process.

The NRC determined the performance at Beaver Valley Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188, Inspection of Near Term Task Force Recommendation 2.3 Seismic Walkdowns. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room.

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73 Enclosure: Beaver Valley Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML12240A242 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ADugandzic/ AD GHunegs/ GKH DATE 08/23 /12 08/ 27/12

Page 1 of 2 Beaver Valley 08/27/2012 08:57:37 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 9/24EXM - BEAVER VALLEY U2 INITIAL OL EXAM 4 2 08/27/2012 08/31/2012 U01850 FY12-BV2 INITIAL OPERATOR LICENSING EXAM 2 09/24/2012 10/05/2012 U01850 FY12-BV2 INITIAL OPERATOR LICENSING EXAM 7111111B - BV1 ON-SITE REQUAL INSP W/ P/F RESULTS 2 1, 2 07/29/2012 08/02/2012 IP 7111111B Licensed Operator Requalification Program TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 6 1, 2 07/23/2012 07/27/2012 IP 7111105T Fire Protection [Triennial]

1, 2 07/23/2012 07/27/2012 IP 7111105T-B.5.b B.5.b Mitigating Strategies 1, 2 08/06/2012 08/10/2012 IP 7111105T Fire Protection [Triennial]

71124.08 - RADWASTE 1 1, 2 08/13/2012 08/17/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TI-177 - MANAGING GAS ACCUMULATION IN ECCS 3 1, 2 09/10/2012 09/14/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124 - OCC RADIATION SAFETY 1 1, 2 09/24/2012 09/28/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/24/2012 09/28/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/24/2012 09/28/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/24/2012 09/28/2012 IP 71124.04 Occupational Dose Assessment 7111108P - U2 INSERVICE INSPECTION 1 2 10/01/2012 10/05/2012 IP 7111108P Inservice Inspection Activities - PWR 2 10/15/2012 10/19/2012 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP INSTRUMENTATION 1 1, 2 12/03/2012 12/07/2012 IP 71124.05 Radiation Monitoring Instrumentation MODS - PERMANENT PLANT MODIFICATIONS 6 1, 2 01/28/2013 02/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 02/11/2013 02/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EP PROGR - EP PROGRAM INSPECTION 1 1, 2 03/25/2013 03/29/2013 IP 7111402 Alert and Notification System Testing 1, 2 03/25/2013 03/29/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/25/2013 03/29/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/25/2013 03/29/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - OCC RADIATION SAFETY 1 1, 2 04/01/2013 04/05/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/01/2013 04/05/2013 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Beaver Valley 08/27/2012 08:57:37 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - OCC RADIATION SAFETY 1 1, 2 04/01/2013 04/05/2013 IP 71124.04 Occupational Dose Assessment 7111107T - TRIENNIAL HEAT SINK 1 1, 2 05/13/2013 05/17/2013 IP 7111107T Heat Sink Performance 71124 - RADIO EFFLUENTS 1 1, 2 06/10/2013 06/14/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - REMP 1 1, 2 06/24/2013 06/28/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111111B - BV2 REQUAL INSPECTION WITH P/F RESULTS 2 2 10/14/2013 10/18/2013 IP 7111111B Licensed Operator Requalification Program 7111108P - U1 INSERVICE INSPECTION 1 1 10/07/2013 10/18/2013 IP 7111108P Inservice Inspection Activities - PWR PI&R - PI&R 4 1, 2 11/18/2013 11/22/2013 IP 71152B Problem Identification and Resolution 1, 2 12/02/2013 12/06/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.