ML23107A250

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection
ML23107A250
Person / Time
Site: Beaver Valley
Issue date: 04/18/2023
From: Diane Jackson
NRC/RGN-I/DORS/OB
To: Blair B
Energy Harbor Nuclear Corp
References
Download: ML23107A250 (1)


Text

B. Berryman UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD, STE 102 KING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 18, 2023 Barry Blair Site Vice President Energy Harbor Nuclear Corp.

Beaver Valley Power Station P.O. Box 4 - Route 168 Shippingport, PA 15077-0004

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT 2 - REQUALIFICATION PROGRAM INSPECTION

Dear Barry Blair:

In a telephone conversation on April 10, 2023, Todd Fish, Senior Operations Engineer, and David Wertz, Licensed Operator Requalification Supervisor, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Unit 2 facility. The inspection is planned for the week of July 24, 2023, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; (2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by the week of July 17, 2023. David Wertz has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions

B. Blair 2 for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Todd Fish at (610) 337-5369.

Sincerely, Digitally signed by Donald Donald E. E. Jackson Date: 2023.04.18 Jackson 09:15:27 -04'00' Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety Docket No. 05000412 License No. NPF-73 cc: Distribution via ListServ

ML23107A250 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DORS/OB RI/DORS/OB NAME TFish/TF DEJackson/DEJ DATE 4/10/2023 4/17/2023