ML17240A409: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:August 28, 2017  
{{#Wiki_filter:UNITED STATES
  Mr. Michael R. Chisum, Vice President  
                            NUCLEAR REGULATORY COMMISSION
Entergy Operations, Inc.  
                                              REGION IV
                                          1600 E. LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
                                        August 28, 2017
Mr. Michael R. Chisum, Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT:        WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC
                DESIGN BASES ASSURANCE INSPECTION (TEAMS) (05000582/2017008)
                AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Chisum:
On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance
Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will perform this
inspection using NRC Inspection Procedure 71111, Attachment 21M, Design Bases Assurance
Inspection (Teams).
The inspection focuses on the maintenance of component design bases and modifications
made to structures, systems, and components. The samples reviewed during this inspection
will be identified during an information gathering visit and during the subsequent in-office
preparation week. In addition, a number of operating experience issues will also be selected for
review.
The inspection will include an information gathering site visit by the team leader, and two weeks
of onsite inspection by the team. The inspection will consist of three NRC inspectors, two
contractors, and one operations examiner. The current inspection schedule is as follows:
        Onsite Information Gathering Visit: October 11, 2017
        Preparation Week: October 16-20, 2017
        Onsite Weeks: October 23-27, 2017, and November 13-17, 2017
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the onsite weeks, several days and administration will be needed on the plant-
referenced simulator in order to facilitate the development of operator action-based scenarios.
Additional information and documentation needed to support the inspection will be identified
during the inspection, including interviews with engineering managers, engineers, and
probabilistic safety assessment staff.


17265 River Road
M. Chisum                                      2
Killona, LA  70057-0751
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into two groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than October 4, 2017, unless
otherwise stated. If possible, this information should be provided electronically to the lead
inspector. Since the inspection will be concentrated on high risk/low margin components and
modifications, calculations associated with your list of high risk components and modifications
should be available to review during the information gathering visit to assist in our selection of
components based on available design margin.
The second group of documents requested lists information necessary to aid the inspection
team in tracking issues identified as a result of the inspection. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. An additional request will be made by the team during the preparation week once
the specific components and modifications have been selected. Additional requests by
inspectors will also be made throughout the onsite weeks for specific documents needed to
complete the review. It is important that all of these documents are up-to-date and complete in
order to minimize the number of additional documents requested during the preparation and/or
onsite portions of the inspection. In order to facilitate the inspection, we request that a contact
individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Gerond George. We understand that our licensing
engineer contact for this inspection is Ms. M. Zamber. If there are any questions about the
inspection or the requested materials, please contact the lead inspector by telephone at
817-200-1562 or by e-mail at Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).


SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC
M. Chisum                                  3
DESIGN BASES ASSURANCE IN
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
SPECTION (TEAMS) (05000582/2017008)
Public Electronic Reading Room).
AND INITIAL REQUEST FOR INFORMATION
                                            Sincerely,
                                            /RA/
Dear Mr. Chisum:  
                                            Thomas R. Farnholtz, Chief
On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance Inspection at the Waterford Steam Electric Station, Unit 3.  A six-person team will perform this
                                            Engineering Branch 1
inspection using NRC Inspection Procedure 71111, Attachment 21M, "Design Bases Assurance Inspection (Teams)."
                                            Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
Enclosure:
Design Bases Assurance Inspection (Teams)
  Request for Information
Electronic Distribution for
  Waterford Steam Electric Station, Unit 3


The inspection focuses on the maintenance of component design bases and modifications made to structures, systems, and components.  The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office
preparation week.  In addition, a number of operating experience issues will also be selected for
review.  The inspection will include an information gathering site visit by the team leader, and two weeks of onsite inspection by the team.  The inspection will consist of three
NRC inspectors, two contractors, and one operations examiner.  The current inspection schedule is as follows:


  Onsite Information Gathering VisitOctober 11, 2017
  ML17240A409
Preparation Week: October 16-20, 2017  
SUNSI Review:        ADAMS:            Non-Publicly Available  Non-Sensitive Keyword:
Onsite Weeks: October 23-27, 2017, and November 13-17, 2017  
  By: GGeorge          Yes  No        Publicly Available      Sensitive    NRC-002
OFFICE        SRI:EB1      C:EB1
The purpose of the information gathering visit is to meet with members of your staff to identify
NAME          GGeorge      TFarnholtz
potential risk-significant components and operator actions. The lead inspector will also request a tour of the plant with members of your operations staff and probabilistic safety assessment staff. During the onsite weeks, several days and administration will be needed on the plant-
SIGNATURE      /RA/          /RA/
referenced simulator in order to facilitate the development of operator action-based scenarios. Additional information and documentation needed to support the inspection will be identified
  DATE          8/24/17      8/28/17
during the inspection, including interviews with engineering managers, engineers, and probabilistic safety assessment staff.
                                     
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
                                    Initial Request for Information
M. Chisum 2 Our experience with these inspections has shown that they are extremely resource intensive, both for the NRC inspectors and the licensee staff.
                          Design Bases Assurance Inspection (Teams)
In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed for the inspection. The request has been divided into two groups.  The first group lists information necessary for the information gathering visit and for general preparation.  This
                              Waterford Steam Electric Station, Unit 3
information should be available to the regional office no later than October 4, 2017, unless
Inspection Report:                        05000382/2017008
otherwise stated. If possible, this information should be provided electronically to the lead
Information Gathering Dates:             October 11, 2017
inspector. Since the inspection will be concentrated on high risk/low margin components and
Inspection Dates:                         October 23-27, 2017, and November 13-17, 2017
modifications, calculations associated with
Inspection Procedure:                    IP 71111, Attachment 21M, Design Bases Assurance
your list of high risk components and modifications should be available to review during the information gathering visit to assist in our selection of components based on available design margin.
                                          Inspection (Teams)
Lead Inspector:                          Gerond George, Senior Reactor Inspector
I.    Information requested prior to information gathering visit (by October 4, 2017).
      The following information (Section I of this enclosure) should be sent to the Region IV
      office in hard copy or electronic format (Certrec IMS preferred), to the attention of
      Gerond George by October 4, 2017, to facilitate the reduction in the items to be selected
      for a final list during the information gathering visit. The specific items selected from the
      lists shall be available and ready for review on the day indicated in this request. Please
      provide requested documentation electronically in pdf files, Excel, or other searchable
      formats, if possible. The information should contain descriptive names and be indexed
      and hyperlinked to facilitate ease of use. Information in lists should contain enough
      information to be easily understood by someone who has knowledge of pressurized
      water reactor technology. If requested documents are large and only hard copy formats
      are available, please inform the inspector and provide subject documentation during the
      first day of the onsite inspection.
      1. An Excel spreadsheet of equipment basic events (with definitions), including
            importance measures sorted by risk achievement worth and Fussell-Vesely from
            your internal events probabilistic risk assessment. Include basic events with risk
            achievement worth value of 1.3 or greater.
      2. A list of the top 50 cut-sets from your PRA.
      3. Copies of probabilistic risk assessment system notebooks and the latest
            probabilistic risk assessment summary document.
      4. An Excel spreadsheet of probabilistic risk assessment human action basic events or
            risk ranking of operator actions from your site-specific PSA sorted by risk
            achievement worth and Fussell-Vesely. Provide copies of your human reliability
            worksheets for these items.
      5. If you have an external events or fire PSA model, provide the information requested
            in items 1-4 for external events and fire.
                                                                                    Enclosure


6. A list of high large early release frequency impact events and associated
The second group of documents requested lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. An additional request will be made by the team during the preparation week once
    components.
the specific components and modifications have been selected. Additional requests by
7. Structures, systems, and components in the Maintenance Rule (a)(1) category.
inspectors will also be made throughout the onsite weeks for specific documents needed to complete the review. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection. In order to facilitate the inspection, we request that a contact
8. A list of high risk maintenance rule systems/components and functions; based on
individual be assigned to each inspector to ensure information requests, questions, and  
    engineering or expert panel judgment.
concerns are addressed in a timely manner. 
9. Site top 10 issues list, if available.
10. Any pre-existing list of components and associated calculations with low design
    margins.
11. A list of operating experience evaluations for the last 3 years.
12. A list of all time-critical operator actions in procedures.
13. A list of current operator work arounds/burdens.
14. Procedures used to accomplish operator actions associated with the basic events
    credited in your PRA.
15. Lists of permanent and temporary modifications performed in the past 5 years to
    structures, systems, and components sorted by component identified in Item 1.
16. List of root cause evaluations associated with component failures or design issues
    initiated/completed in the last 5 years.
17. A list of any common-cause failures of components in the last 3 years.
18. A copy of any internal/external self-assessments and associated corrective action
    documents generated in preparation for this inspection.
19. A copy of engineering/operations-related audits completed in the last 2 years.
20. Electronic copies of the Technical Specifications, Technical Specifications Bases,
    and the Final Safety Analysis Report, as updated.
21. A copy of the Individual Plant Examination of External Events, if available
    electronically.
22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency
    feedwater, safety-related electrical systems.
23. A list of licensee contacts for the inspection team with phone numbers.
24. A copy of the current management and engineering organizational charts.
                                          2


II.    Information requested to be provided for preparation week and throughout the
The lead inspector for this inspection is Gerond George.  We understand that our licensing engineer contact for this inspection is Ms. M. Zamber.
        inspection (by October 16, 2017, if possible)
  If there are any questions about the inspection or the requested materials, please contact the lead inspector by telephone at 
        1. Electronic copies of the design bases documents for selected components and
 
            modifications.
817-200-1562 or by e-mail at Gerond.George@nrc.gov. 
        2. Electronic copies of the system health notebooks for selected components and
 
            modifications.
        3. A list of the design calculations that provide the design margin information for
This letter does not contain new or amended information collection requirements subject  to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control
            selected components. (Calculations for selected components should be available
number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
            during the information gathering visit.)
respond to, a request for information or an information collection requirement unless the
        4. Calculations and drawings associated with selected components.
requesting document displays a currently valid Office of Management and Budget control
        5. Modification documentation associated with modifications selected from Item I.15,
 
            this includes:
number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
                    a. Post-modification testing, including performance characteristics affected,
made available electronically for
                        assumptions, and acceptance criteria associated with modifications
public inspection in the NRC Pub
                        selected.
lic Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). 
                    b. Updated maintenance and surveillance procedures associated with
M. Chisum 3 ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
                        modifications.
Sincerely,    /RA/    Thomas R. Farnholtz, Chief Engineering Branch 1
                    c. Updated operation procedures and training plans associated with the
Division of Reactor Safety
                        modifications.
        6. Copies of any corrective action documents generated as a result of the teams
Docket No. 50-382
            questions or queries during this inspection.
License No. NPF-38
        7. Copies of the list of questions submitted by the team members and the
Enclosure: 
            status/resolution of the information requested (provide daily during the inspection to
Design Bases Assurance Inspection (Teams)
            each team member).
  Request for Information
Inspector Contact Information:
 
Gerond A. George
Electronic Distribution for    Waterford Steam Electric Station, Unit 3
Senior Reactor Inspector
 
817-200-1562
Gerond.George@nrc.gov
 
Mailing Address:
 
U.S. NRC, Region IV
ML17240A409  SUNSI Review:  ADAMS:    Non-Publicly Available  Non-Sensitive Keyword:  By:  GGeorge  Yes     No  Publicly Available  Sensitive  NRC-002 OFFICE SRI:EB1 C:EB1    NAME GGeorge TFarnholtz    SIGNATURE /RA/ /RA/    DATE 8/24/17 8/28/17     
Attn: Gerond George
  Enclosure
1600 East Lamar Blvd.
Initial Request for Information
Arlington, TX 76011-4511
Design Bases Assurance Inspection (Teams) Waterford Steam Electric Station, Unit 3
                                                3
 
Inspection Report:  05000382/2017008
 
Information Gathering Dates:  October 11, 2017
 
Inspection Dates: October 23-27, 2017, and November 13-17, 2017
Inspection Procedure: IP 71111, Attachment 21M, "Design Bases Assurance Inspection (Teams)"
Lead Inspector:  Gerond George, Senior Reactor Inspector
 
I. Information requested prior to information gathering visit (by October 4, 2017).
 
The following information (Section I of this enclosure) should be sent to the Region IV office in hard copy or electronic format (Certrec IMS preferred), to the attention of
Gerond George
by October 4, 2017, to facilitate the reduction in the items to be selected
for a final list during the information gathering visit.  The specific items selected from the
lists shall be available and ready for review on the day indicated in this request.  Please provide requested documentation electronically in pdf files, Excel, or other searchable formats, if possible.  The information should contain descriptive names and be indexed and hyperlinked to facilitate ease of use.  Information in lists should contain enough
information to be easily understood by someone who has knowledge of pressurized
water reactor technology.  If requested documents are large and only hard copy formats
are available, please inform the inspector and provide subject documentation during the first day of the onsite inspection. 
1. An Excel spreadsheet of equipment basic events (with definitions), including
importance measures sorted by risk ac
hievement worth and Fussell-Vesely from your internal events probabilistic risk assessment.  Include basic events with risk achievement worth value of 1.3 or greater. 
2. A list of the top 50 cut-sets from your PRA. 
3. Copies of probabilistic risk assessment "system notebooks" and the latest probabilistic risk assessment summary document.
4. An Excel spreadsheet of probabilistic risk assessment human ac
tion basic events or risk ranking of operator actions from your site-specific PSA sorted by risk
achievement worth and Fussell-Vesely.  Provide copies of your human reliability worksheets for these items. 
5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.
 
  2  6. A list of high large early release frequency impact events and associated
components.
 
7. Structures, systems, and components in the Maintenance Rule (a)(1) category.
8. A list of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment.
 
9. Site top 10 issues list, if available.
10. Any pre-existing list of components and associated calculations with low design margins.  11. A list of operating experience evaluations for the last 3 years. 
12. A list of all time-critical operator actions in procedures.
13. A list of current "operator work arounds/burdens."
14. Procedures used to accomplish operator actions associated with the basic events credited in your PRA.
15. Lists of permanent and temporary modifications performed in the past 5 years to structures, systems, and components sorted by component identified in Item 1. 
16. List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years. 
17. A list of any common-cause failures of components in the last 3 years.
18. A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for this inspection.
19. A copy of engineering/operations-related audits completed in the last 2 years.
20. Electronic copies of the Technical Specifications, Technical Specifications Bases, and the Final Safety Analysis Report, as updated.
21. A copy of the Individual Plant Exami
nation of External Events, if available electronically.
22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency feedwater, safety-related electrical systems.
 
23. A list of licensee contacts for the inspection team with phone numbers.
24. A copy of the current management and engineering organizational charts. 
 
  3  II. Information requested to be provided for preparation week and throughout the  
inspection (by October 16, 2017, if possible)
  1. Electronic copies of the design bases documents for selected components and modifications.
2. Electronic copies of the system health notebooks for selected components and modifications.
 
3. A list of the design calculations that provide the design margin information for selected components. (Calculations for selected components should be available  
during the information gathering visit.)  
 
4. Calculations and drawings associated with selected components.  
5. Modification documentation associated with modifications selected from Item I.15, this includes:  
 
a. Post-modification testing, including performance characteristics affected, assumptions, and acceptance criteria associated with modifications  
selected.  
b. Updated maintenance and surveillance procedures associated with modifications.  
 
c. Updated operation procedures and training plans associated with the modifications.  
6. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection.  
7. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to  
each team member).  
 
Inspector Contact Information:  
Gerond A. George
Senior Reactor Inspector  
 
817-200-1562  
Gerond.George@nrc.gov  
Mailing Address:  
 
U.S. NRC, Region IV  
 
Attn: Gerond George
1600 East Lamar Blvd. Arlington, TX 76011-4511
}}
}}

Latest revision as of 20:26, 29 October 2019

Notification of NRC Design Bases Assurance Inspection (Teams) (05000582/2017008) and Initial Request for Information
ML17240A409
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/28/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Chisum M
Entergy Operations
References
IR 2017008
Download: ML17240A409 (7)


See also: IR 05000582/2017008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

August 28, 2017

Mr. Michael R. Chisum, Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF NRC

DESIGN BASES ASSURANCE INSPECTION (TEAMS) (05000582/2017008)

AND INITIAL REQUEST FOR INFORMATION

Dear Mr. Chisum:

On October 11, 2017, the NRC will begin a triennial baseline Design Bases Assurance

Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will perform this

inspection using NRC Inspection Procedure 71111, Attachment 21M, Design Bases Assurance

Inspection (Teams).

The inspection focuses on the maintenance of component design bases and modifications

made to structures, systems, and components. The samples reviewed during this inspection

will be identified during an information gathering visit and during the subsequent in-office

preparation week. In addition, a number of operating experience issues will also be selected for

review.

The inspection will include an information gathering site visit by the team leader, and two weeks

of onsite inspection by the team. The inspection will consist of three NRC inspectors, two

contractors, and one operations examiner. The current inspection schedule is as follows:

Onsite Information Gathering Visit: October 11, 2017

Preparation Week: October 16-20, 2017

Onsite Weeks: October 23-27, 2017, and November 13-17, 2017

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days and administration will be needed on the plant-

referenced simulator in order to facilitate the development of operator action-based scenarios.

Additional information and documentation needed to support the inspection will be identified

during the inspection, including interviews with engineering managers, engineers, and

probabilistic safety assessment staff.

M. Chisum 2

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into two groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than October 4, 2017, unless

otherwise stated. If possible, this information should be provided electronically to the lead

inspector. Since the inspection will be concentrated on high risk/low margin components and

modifications, calculations associated with your list of high risk components and modifications

should be available to review during the information gathering visit to assist in our selection of

components based on available design margin.

The second group of documents requested lists information necessary to aid the inspection

team in tracking issues identified as a result of the inspection. It is requested that this

information be provided to the lead inspector as the information is generated during the

inspection. An additional request will be made by the team during the preparation week once

the specific components and modifications have been selected. Additional requests by

inspectors will also be made throughout the onsite weeks for specific documents needed to

complete the review. It is important that all of these documents are up-to-date and complete in

order to minimize the number of additional documents requested during the preparation and/or

onsite portions of the inspection. In order to facilitate the inspection, we request that a contact

individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Gerond George. We understand that our licensing

engineer contact for this inspection is Ms. M. Zamber. If there are any questions about the

inspection or the requested materials, please contact the lead inspector by telephone at

817-200-1562 or by e-mail at Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

M. Chisum 3

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-382

License No. NPF-38

Enclosure:

Design Bases Assurance Inspection (Teams)

Request for Information

Electronic Distribution for

Waterford Steam Electric Station, Unit 3

ML17240A409

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: GGeorge Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:EB1 C:EB1

NAME GGeorge TFarnholtz

SIGNATURE /RA/ /RA/

DATE 8/24/17 8/28/17

Initial Request for Information

Design Bases Assurance Inspection (Teams)

Waterford Steam Electric Station, Unit 3

Inspection Report: 05000382/2017008

Information Gathering Dates: October 11, 2017

Inspection Dates: October 23-27, 2017, and November 13-17, 2017

Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance

Inspection (Teams)

Lead Inspector: Gerond George, Senior Reactor Inspector

I. Information requested prior to information gathering visit (by October 4, 2017).

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (Certrec IMS preferred), to the attention of

Gerond George by October 4, 2017, to facilitate the reduction in the items to be selected

for a final list during the information gathering visit. The specific items selected from the

lists shall be available and ready for review on the day indicated in this request. Please

provide requested documentation electronically in pdf files, Excel, or other searchable

formats, if possible. The information should contain descriptive names and be indexed

and hyperlinked to facilitate ease of use. Information in lists should contain enough

information to be easily understood by someone who has knowledge of pressurized

water reactor technology. If requested documents are large and only hard copy formats

are available, please inform the inspector and provide subject documentation during the

first day of the onsite inspection.

1. An Excel spreadsheet of equipment basic events (with definitions), including

importance measures sorted by risk achievement worth and Fussell-Vesely from

your internal events probabilistic risk assessment. Include basic events with risk

achievement worth value of 1.3 or greater.

2. A list of the top 50 cut-sets from your PRA.

3. Copies of probabilistic risk assessment system notebooks and the latest

probabilistic risk assessment summary document.

4. An Excel spreadsheet of probabilistic risk assessment human action basic events or

risk ranking of operator actions from your site-specific PSA sorted by risk

achievement worth and Fussell-Vesely. Provide copies of your human reliability

worksheets for these items.

5. If you have an external events or fire PSA model, provide the information requested

in items 1-4 for external events and fire.

Enclosure

6. A list of high large early release frequency impact events and associated

components.

7. Structures, systems, and components in the Maintenance Rule (a)(1) category.

8. A list of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

9. Site top 10 issues list, if available.

10. Any pre-existing list of components and associated calculations with low design

margins.

11. A list of operating experience evaluations for the last 3 years.

12. A list of all time-critical operator actions in procedures.

13. A list of current operator work arounds/burdens.

14. Procedures used to accomplish operator actions associated with the basic events

credited in your PRA.

15. Lists of permanent and temporary modifications performed in the past 5 years to

structures, systems, and components sorted by component identified in Item 1.

16. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

17. A list of any common-cause failures of components in the last 3 years.

18. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for this inspection.

19. A copy of engineering/operations-related audits completed in the last 2 years.

20. Electronic copies of the Technical Specifications, Technical Specifications Bases,

and the Final Safety Analysis Report, as updated.

21. A copy of the Individual Plant Examination of External Events, if available

electronically.

22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency

feedwater, safety-related electrical systems.

23. A list of licensee contacts for the inspection team with phone numbers.

24. A copy of the current management and engineering organizational charts.

2

II. Information requested to be provided for preparation week and throughout the

inspection (by October 16, 2017, if possible)

1. Electronic copies of the design bases documents for selected components and

modifications.

2. Electronic copies of the system health notebooks for selected components and

modifications.

3. A list of the design calculations that provide the design margin information for

selected components. (Calculations for selected components should be available

during the information gathering visit.)

4. Calculations and drawings associated with selected components.

5. Modification documentation associated with modifications selected from Item I.15,

this includes:

a. Post-modification testing, including performance characteristics affected,

assumptions, and acceptance criteria associated with modifications

selected.

b. Updated maintenance and surveillance procedures associated with

modifications.

c. Updated operation procedures and training plans associated with the

modifications.

6. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

7. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

817-200-1562

Gerond.George@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond George

1600 East Lamar Blvd.

Arlington, TX 76011-4511

3