| issue date = 09/30/1994
| issue date = 09/30/1994
| title = Monthly Operating Rept for Sept 1994 for DC Cook Nuclear Plant,Unit 1.W/941017 Ltr
| title = Monthly Operating Rept for Sept 1994 for DC Cook Nuclear Plant,Unit 1.W/941017 Ltr
| author name = BLIND A A, BUBLICK D L, JANISSE J D
| author name = Blind A, Bublick D, Janisse J
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PR.IC3 R.I EY'..CELERATED RIDS PROCESSING)
{{#Wiki_filter:PR.IC3           R.I EY'.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS}ACCESSION NBR:9410260086 DOC.DATE: 94/09/30 NOTARIZED:
                                          .CELERATED RIDS PROCESSING)
NO DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS}
Indiana Michigan Power Co.(formerly Indiana&Michigan Ele BUBLICK,,D.L.
ACCESSION NBR:9410260086                 DOC.DATE:     94/09/30     NOTARIZED: NO           DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit                         1, Indiana   M 05000315 AUTH. NAME             AUTHOR AFFILIATION JANISSE,J.D.           Indiana Michigan Power Co. (formerly                   Indiana & Michigan Ele BUBLICK,,D.L.         Indiana Michigan Power Co. (formerly                   Indiana & Michigan Ele BLIND,A.A.             Indiana Michigan Power Co. (formerly                   Indiana & Michigan Ele RECIP.NAME             RECIPIENT AFFILIATION                                                         R
Indiana Michigan Power Co.(formerly Indiana&Michigan Ele BLIND,A.A.
Indiana Michigan Power Co.(formerly Indiana&Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R  


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Sept 1994 for DC Cook Nuclear Plant, Unit 1.W/941017 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DORS/OEAB RGN3 EXTERNAL: EG&G BRYCE,J.H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CENTER 01=/rRCB-NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D 0 C N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept               for Sept   1994   for DC Cook Nuclear Plant, Unit 1.W/941017             ltr.
PLEASE HELP US TO REDUCE iVKSTE!CONTACT THE DOCL'if ENT CONTROL DESK, ROOhf PI-37 (EXT.504-083)TO ELI hf!NATE YOUR NAif L PRO%i DISTRIBUTION LISTS I'OR DOC!.0 IEN'I'S YOI: DON" I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 616 465 5901 October 17, 1994 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: IE24D               COPIES RECEIVED:LTR             ENCL       SIZE:
Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of September 1994 is submitted.
TITLE: Monthly Operating Report (per Tech Specs)
Respectfully, A.A.Blind Plant Manager Attachment co NRC Region III D.R.Hahn R.C.Callen S.Hamming Z.G.Keppler INPO Records Center ANI Nuclear Engineering Department E.E.Fitzpatrick W.G.Smith, Jr.S.J.Brewer D.W.Paul S.H.Steinhart J.L.Leichner J.A.Isom D.G.Turner E.A.Smarrella J.C.Krieger D.F.Krause M.E.Russo 9410260086 940930 PDR ADOCK 05000315 R'DR N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE.04/Oct/94 COMPLETED BYJ D Janisse TELEPHONE 616-465-5901 OPERATING STATUS 1.Unit Name D.C.Cook Unit 1 2.Reporting Period September notes 3.Licensed Thermal Power (MWt)3250 4.Name Plate Rating (Gross MWe)1152 5.Design Electrical Rating (Net MWe)1020 6.Maximum Dependable Capacity (GROSS MWe)1056 7.Maximum Dependable Capacity (Net MWe)1000 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons 9.'0.ower evei o ic estricte.Reasons For Restrictions.
NOTES RECIPIENT                   COPIES              RECIPIENT            COPIES ID CODE/NAME               LTTR ENCL          ID  CODE/NAME          LTTR ENCL PD3-1 PD                         1        1      HICKMAN,J                  1    1 INTERNAL: AEOD/SPD/RRAB                     1      1      FILE  CENTER      01      1    1 NRR/DORS/OEAB                   1      1              =/rRCB-            1    1 RGN3                             1      1 EXTERNAL: EG&G BRYCE,J.H                   1       1       NOAC                      1     1 NRC PDR                          1       1 D
If Any: ny e e 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Therm.Energy Gen.(MWH)17.Gross Elect.Energy Gen.(MWH)18.Net Elect.Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled over Next Six None is o.r.to ate 720.0 6552.0 720.0 4048.5 0.0 0.0 715.9 4007.0 0.0 0.0 2116670 11431649 678490 3643810 652628 3501826 99.4 61.2 99.4 61.2 90.6 53.4 88.9 52.4 0.0 0.0 Months (Type.Date.and umm.173112.0 129702.9 463.0 127615.6 321.0 374957424 121666470 117023624 74.6 74.6 67.3 65.6 5.9 Duration):
0 C
25.ut own n o eport erio.stimate ate o artup: 26.nits in est atus rior to ommercia INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I peration: Forecast Achieved 0~I AVERAGE DAILY POWER LEVEL (MWe-Net)DOCKET NO.50-315 UNIT ONE DATE 10/Oct/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 MONTH.September DAY 94/09/01 94/09/02 94/09/03 94/09/04 94/09/05 94/09/06 94/09/07 94/09/08 94/09/09 94/09/10 94/09/11 94/09/12 94/09/13 94/09/14 94/09/15 94/09/16 AVERAGE DAILY POWER LEVEL 1021 1020 1014 1017 744 949 1015 1014 1000 598 450 431 175 614 997 1009 DAY 94/09/17 94/09/18 94/09/19 94/09/20 94/09/21 94/09/22 94/09/23 94/09/24 94/09/25 94/09/26 94/09/27 94/09/28 94/09/29 94/09/30 AVERAGE DAILY POWER LEVEL 1009 1013 10051006 1012 1010 971 1024 1018 1017 1015 1014 1005 1006 DOCKET N UNIT NAME: COMPLETED BY: TELEPHONE:
N NOTE TO ALL"RIDS" RECIPIENTS:
DATE: PAGE 50-315 D.C.Cook Unit 1 D.L.Bublick (616)465-5901 October 7,1994 Page.1 of 2 MONTHLY OPERATING ACTIVITIES
PLEASE HELP US TO REDUCE iVKSTE! CONTACT THE DOCL'ifENT CONTROL DESK, ROOhf PI-37 (EXT. 504- 083 ) TO ELI hf!NATE YOUR NAifL PRO%i DISTRIBUTION LISTS I'OR DOC!. 0 IEN'I'S YOI: DON"I'L'ED!
-SEPTEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 1004 RTP.The unit exited this reporting period in Mode 1 at 100>RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross Electrical generation for'the month of September was 678490 MWH.DETAILS 9-5-94 0845 Commenced Reactor power reduction due to problems with 1-WMO-13 (f13 Circ.Water Pump Discharge).
TOTAL NUMBER OF COPIES REQUIRED: LTTR                      10  ENCL      10
Valve actuator appeared to be working itself loose.9-6-94 9-9-94 9-10-94 9-11-94 9-12-94 1000 1350 1400 1942 1450 1730 0825 2031 Reactor power at 494 RTP.Commenced reactor power increase to 1004 RTP.Reactor power stabilized at 1004 RTP.Commenced Reactor power reduction for Biocide application in the Circ.Water System.Started Circ.Water System Biocide application.
 
Reactor power stabilized at 50%RTP.Circ.Water System Biocide application complete.Commenced Reactor power reduction to allow oil addition to gl3 RCP, repair of West MFP Suction Strainer and repairs to the Main Turbine Trip Solenoid.9-13-94 0335 0742 0938 1435 Reactor power stabilized at 30>RTP.Commenced Reactor power reduction.
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 616 465 5901 October 17, 1994 U.S. Nuclear Regulatory Commission ATTN:       Document    Control Desk Washington, D.C.          20555 Gentlemen:
Reactor power stabilized at 15~RTP.Commenced Reactor power increase.
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit      1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of September 1994 is submitted.
DOCKET N UNIT NAME: COMPLETED BY: TELEPHONE:
Respectfully, A.A. Blind Plant Manager Attachment co      NRC    Region D.R. Hahn III R.C. Callen S.       Hamming Z.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E.     Fitzpatrick W.G.     Smith, Jr.
DATE PAGE: 50-315 D.C.Cook Unit 1 D.L.Bublick (616)465-5901 October 7,1994 Page 2 of 2 MONTHLY OPERATING ACTIVITIES
S.J. Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo PDR R    'DR 9410260086 940930 ADOCK 05000315
-SEPTEMBER 1994 1710 1945 0505 Reactor power stabilized at 304 RTP.Commenced Reactor power increase.Reactor power stabilized at 1004 RTP.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS Report Month: SEPTEMBER 1994 UNIT NAME DATE: COMPLETED BY: TELEPHONE:
N.R.C. OPERATING DATA   REPORT DOCKET NO.         50-315 DATE .04/Oct/94 COMPLETED BYJ D Janisse TELEPHONE 616-465-5901 OPERATING STATUS
PAGE: D.C.COOK UNIT, 1 Oct 7, 1994 D.L.Bublick (616)465-5901 Page 1 of 1 DURATION NO.DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON~REACTOR~LICENSEE EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REPORT NO CODE CODE~TO PREVENT RECURRENCE 311 940905 S 3.8 N/A N/A N/A After decreasing and stabilizing Reactor Power at 49%RTP on 940905, maintenance activities commenced on 1-WMO-13 (813 Circ.~Water Pump Discharge) valve actuator.The reactor was returned to 100%RTP on 940906 at 1400.312 940910 S 313 940913 S 17.6 N/A N/A N/A N/A N/A N/A N/A After increasing and stabilizing reactor power at 100%RTP on 940906, reactor power was reduced to 50%RTP on 940910 to support.Zebra Mussel cleanup in the Circ.Water System.The Reactor was returned to 100%RTP on 940915 at 0505.After decreasing and stabilizing Reactor Power at 15%RTP on 940913, oil addition commenced to f13 RCP.The reactor was returned to 100%RTP on 940915 a 0505.1 F: Forced S: Scheduled 2 Reason: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 Method: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 1061)5 Exhibit I Same Source r i~r A}}
: 1. Unit Name                   D. C. Cook   Unit     1
: 2. Reporting Period                         September notes
: 3. Licensed Thermal Power (MWt)                     3250
: 4. Name Plate Rating (Gross MWe)                     1152
: 5. Design Electrical Rating (Net       MWe)         1020
: 6. Maximum Dependable     Capacity (GROSS MWe) 1056
: 7. Maximum Dependable     Capacity (Net MWe)         1000
: 8. If Changes Occur in Capacity Ratings       ( Items no. 3 through 7) Since Last Report Give Reasons
: 9. ower    evei o     ic estricte .          ny      e    e
'0. Reasons   For Restrictions. If Any:
is      o. r. to ate      umm.
: 11. Hours   in Reporting Period                   720.0          6552.0  173112.0
: 12. No. of Hrs. Reactor Was Critical             720.0        4048.5  129702.9
: 13. Reactor Reserve Shutdown Hours                   0.0            0.0    463.0
: 14. Hours Generator on Line                       715.9        4007.0  127615.6
: 15. Unit Reserve Shutdown Hours                       0.0            0.0    321.0
: 16. Gross Therm. Energy Gen. (MWH)           2116670          11431649  374957424
: 17. Gross Elect. Energy Gen. (MWH)               678490        3643810  121666470
: 18. Net Elect. Energy Gen. (MWH)                 652628        3501826  117023624
: 19. Unit Service Factor                           99.4            61.2      74.6
: 20. Unit  Availability Factor                       99.4            61.2      74.6
: 21. Unit Capacity Factor (MDC Net)                 90.6            53.4      67.3
: 22. Unit  Capacity Factor (DER Net)                 88.9            52.4      65.6
: 23. Unit Forced Outage Rate                         0.0            0.0        5.9
: 24. Shutdowns Scheduled over Next Six Months (Type. Date.and Duration):
None
: 25.       ut    own    n  o  eport  erio  . stimate      ate  o artup:
: 26. nits in est      atus  rior to    ommercia        peration  :
Forecast    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
 
0 ~ I AVERAGE DAILY POWER LEVEL    (MWe-Net)
DOCKET NO.         50-315 UNIT                  ONE DATE          10/Oct/94 COMPLETED BY J D Janisse TELEPHONE  616-465-5901 MONTH      . September AVERAGE DAILY                          AVERAGE DAILY DAY      POWER LEVEL              DAY          POWER LEVEL 94/09/01        1021              94/09/17            1009 94/09/02        1020              94/09/18            1013 94/09/03        1014              94/09/19            1005 94/09/04        1017              94/09/20 1006 94/09/05        744              94/09/21            1012 94/09/06        949              94/09/22            1010 94/09/07        1015              94/09/23              971 94/09/08        1014              94/09/24            1024 94/09/09        1000              94/09/25            1018 94/09/10        598              94/09/26            1017 94/09/11        450              94/09/27            1015 94/09/12        431              94/09/28            1014 94/09/13        175              94/09/29            1005 94/09/14        614              94/09/30            1006 94/09/15        997 94/09/16        1009
 
DOCKET N        50-315 UNIT NAME:      D.C. Cook  Unit 1 COMPLETED BY:    D. L. Bublick TELEPHONE:      (616) 465-5901 DATE:            October 7,1994 PAGE            Page.1 of 2 MONTHLY OPERATING  ACTIVITIES  SEPTEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 1004 RTP.
The unit exited this reporting period in Mode 1 at 100> RTP.
There were no challenges  to the pressurizer safety valves or power operated relief  valves.
Gross Electrical generation for 'the month of September was 678490 MWH.
DETAILS 9-5-94       0845      Commenced Reactor power reduction due to problems with 1-WMO-13 (f13 Circ. Water Pump Discharge).
Valve actuator appeared to be working    itself loose.
1000      Reactor power at 494 RTP.
1350      Commenced reactor power increase to 1004 RTP.
9-6-94        1400      Reactor power stabilized at 1004 RTP.
9-9-94        1942      Commenced Reactor power reduction for Biocide application in the Circ. Water System.
9-10-94      1450      Started Circ. Water System Biocide application.
1730      Reactor power stabilized at 50% RTP.
9-11-94      0825      Circ. Water System Biocide application complete.
9-12-94      2031      Commenced Reactor power reduction to allow oil addition to gl3 RCP, repair of West MFP Suction Strainer and repairs to the Main Turbine Trip Solenoid.
9-13-94       0335      Reactor power stabilized at 30> RTP.
0742      Commenced Reactor power reduction.
0938      Reactor power stabilized at 15~ RTP.
1435      Commenced  Reactor power increase.
 
DOCKET N        50-315 UNIT NAME:      D.C. Cook  Unit 1 COMPLETED BY:  D. L. Bublick TELEPHONE:      (616) 465-5901 DATE            October 7,1994 PAGE:          Page  2  of 2 MONTHLY OPERATING ACTIVITIES  SEPTEMBER 1994 1710    Reactor power stabilized at 304 RTP.
1945    Commenced Reactor power increase.
0505    Reactor power stabilized at 1004 RTP.
 
UNIT SHUTDOWNS AND  POWER REDUCTIONS                                  UNIT NAME      D. C. COOK UNIT, 1 DATE:          Oct 7, 1994 Report Month:  SEPTEMBER 1994                              COMPLETED BY:  D. L. Bublick TELEPHONE:      (616) 465-5901 PAGE:            Page 1  of  1 METHOD OF SHUTTING    LICENSEE DURATION            DOWN        EVENT        SYSTEM  COMPONENT    CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE      HOURS      REASON~  REACTOR~    REPORT NO    CODE    CODE        ~ TO PREVENT RECURRENCE 311  940905  S        3.8                              N/A          N/A      N/A          After decreasing  and  stabilizing Reactor Power at   49% RTP   on 940905, maintenance    activities commenced on 1-WMO-13 (813      Circ.~
Water Pump Discharge) valve actuator. The reactor was returned to 100% RTP on 940906 at 1400.
312  940910  S      17.6                              N/A        N/A      N/A          After increasing and stabilizing reactor power at 100% RTP on 940906, reactor power was reduced to 50% RTP on 940910 to support.
Zebra Mussel cleanup in the Circ.
Water System. The Reactor was returned to 100% RTP on 940915 at 0505.
313  940913  S      N/A                                N/A        N/A      N/A          After decreasing and stabilizing Reactor Power at 15% RTP on 940913, oil addition commenced to f13 RCP. The reactor was returned to 100% RTP on 940915 a 0505.
1                2                                    3                    4                              5 F: Forced        Reason:                               Method:             Exhibit G - Instructions      Exhibit I      Same S: Scheduled    A: Equipment Failure (Explain)       1: Manual            for preparation of data                      Source B: Maintenance or Test                2: Manual Scram      entry sheets for Licensee C:  Refueling                        3: Automatic Scram  Event Report (LER)  File D:  Regulatory Restriction            4: Other (Explain)  (NUREG 1061)
E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
 
r   i~ r A}}

Latest revision as of 13:42, 22 October 2019

Monthly Operating Rept for Sept 1994 for DC Cook Nuclear Plant,Unit 1.W/941017 Ltr
ML17332A350
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/30/1994
From: Blind A, Bublick D, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9410260086
Download: ML17332A350 (9)


Text

PR.IC3 R.I EY'.

.CELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS}

ACCESSION NBR:9410260086 DOC.DATE: 94/09/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFILIATION JANISSE,J.D. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele BUBLICK,,D.L. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele BLIND,A.A. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Sept 1994 for DC Cook Nuclear Plant, Unit 1.W/941017 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 PD 1 1 HICKMAN,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 NRR/DORS/OEAB 1 1 =/rRCB- 1 1 RGN3 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 C

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE! CONTACT THE DOCL'ifENT CONTROL DESK, ROOhf PI-37 (EXT. 504- 083 ) TO ELI hf!NATE YOUR NAifL PRO%i DISTRIBUTION LISTS I'OR DOC!. 0 IEN'I'S YOI: DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 616 465 5901 October 17, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of September 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment co NRC Region D.R. Hahn III R.C. Callen S. Hamming Z.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J. Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo PDR R 'DR 9410260086 940930 ADOCK 05000315

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE .04/Oct/94 COMPLETED BYJ D Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period September notes
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings ( Items no. 3 through 7) Since Last Report Give Reasons
9. ower evei o ic estricte . ny e e

'0. Reasons For Restrictions. If Any:

is o. r. to ate umm.

11. Hours in Reporting Period 720.0 6552.0 173112.0
12. No. of Hrs. Reactor Was Critical 720.0 4048.5 129702.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 715.9 4007.0 127615.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2116670 11431649 374957424
17. Gross Elect. Energy Gen. (MWH) 678490 3643810 121666470
18. Net Elect. Energy Gen. (MWH) 652628 3501826 117023624
19. Unit Service Factor 99.4 61.2 74.6
20. Unit Availability Factor 99.4 61.2 74.6
21. Unit Capacity Factor (MDC Net) 90.6 53.4 67.3
22. Unit Capacity Factor (DER Net) 88.9 52.4 65.6
23. Unit Forced Outage Rate 0.0 0.0 5.9
24. Shutdowns Scheduled over Next Six Months (Type. Date.and Duration):

None

25. ut own n o eport erio . stimate ate o artup:
26. nits in est atus rior to ommercia peration  :

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

0 ~ I AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 10/Oct/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 MONTH . September AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 94/09/01 1021 94/09/17 1009 94/09/02 1020 94/09/18 1013 94/09/03 1014 94/09/19 1005 94/09/04 1017 94/09/20 1006 94/09/05 744 94/09/21 1012 94/09/06 949 94/09/22 1010 94/09/07 1015 94/09/23 971 94/09/08 1014 94/09/24 1024 94/09/09 1000 94/09/25 1018 94/09/10 598 94/09/26 1017 94/09/11 450 94/09/27 1015 94/09/12 431 94/09/28 1014 94/09/13 175 94/09/29 1005 94/09/14 614 94/09/30 1006 94/09/15 997 94/09/16 1009

DOCKET N 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: D. L. Bublick TELEPHONE: (616) 465-5901 DATE: October 7,1994 PAGE Page.1 of 2 MONTHLY OPERATING ACTIVITIES SEPTEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 1004 RTP.

The unit exited this reporting period in Mode 1 at 100> RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for 'the month of September was 678490 MWH.

DETAILS 9-5-94 0845 Commenced Reactor power reduction due to problems with 1-WMO-13 (f13 Circ. Water Pump Discharge).

Valve actuator appeared to be working itself loose.

1000 Reactor power at 494 RTP.

1350 Commenced reactor power increase to 1004 RTP.

9-6-94 1400 Reactor power stabilized at 1004 RTP.

9-9-94 1942 Commenced Reactor power reduction for Biocide application in the Circ. Water System.

9-10-94 1450 Started Circ. Water System Biocide application.

1730 Reactor power stabilized at 50% RTP.

9-11-94 0825 Circ. Water System Biocide application complete.

9-12-94 2031 Commenced Reactor power reduction to allow oil addition to gl3 RCP, repair of West MFP Suction Strainer and repairs to the Main Turbine Trip Solenoid.

9-13-94 0335 Reactor power stabilized at 30> RTP.

0742 Commenced Reactor power reduction.

0938 Reactor power stabilized at 15~ RTP.

1435 Commenced Reactor power increase.

DOCKET N 50-315 UNIT NAME: D.C. Cook Unit 1 COMPLETED BY: D. L. Bublick TELEPHONE: (616) 465-5901 DATE October 7,1994 PAGE: Page 2 of 2 MONTHLY OPERATING ACTIVITIES SEPTEMBER 1994 1710 Reactor power stabilized at 304 RTP.

1945 Commenced Reactor power increase.

0505 Reactor power stabilized at 1004 RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME D. C. COOK UNIT, 1 DATE: Oct 7, 1994 Report Month: SEPTEMBER 1994 COMPLETED BY: D. L. Bublick TELEPHONE: (616) 465-5901 PAGE: Page 1 of 1 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON~ REACTOR~ REPORT NO CODE CODE ~ TO PREVENT RECURRENCE 311 940905 S 3.8 N/A N/A N/A After decreasing and stabilizing Reactor Power at 49% RTP on 940905, maintenance activities commenced on 1-WMO-13 (813 Circ.~

Water Pump Discharge) valve actuator. The reactor was returned to 100% RTP on 940906 at 1400.

312 940910 S 17.6 N/A N/A N/A After increasing and stabilizing reactor power at 100% RTP on 940906, reactor power was reduced to 50% RTP on 940910 to support.

Zebra Mussel cleanup in the Circ.

Water System. The Reactor was returned to 100% RTP on 940915 at 0505.

313 940913 S N/A N/A N/A N/A After decreasing and stabilizing Reactor Power at 15% RTP on 940913, oil addition commenced to f13 RCP. The reactor was returned to 100% RTP on 940915 a 0505.

1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions Exhibit I Same S: Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 1061)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

r i~ r A