Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr
ML17334B817
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/30/1998
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9807150254
Download: ML17334B817 (9)


Text

REGULATO CATEGORY 1 ~

INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSION NBR:9807150254 DOC.DATE: 98/06/30 NOTARIZED: NO DOCKET ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.MME .' AUTHOR AFFIL1ATION MINOR,J.W. Indiana Michigan Power Co; (formerly Indiana & Michigan Ele CENTER,J.F. Indiana Michigan Power Co. (formerly Indiana S Michigan Ele COOPER,D.E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1 1

'D RECIPIENT CODE/NAME STANG, J COPIES LTTR ENCL 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 E CENTER 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

P r

~ et

~ g h t~

~, ~ r l

'I

~ >

r 1 ~

l

American Electric Pov~

Cook Nudear Plant One Cook Place Bndgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 July 6, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit. 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1998 is submitted.

Sincer ly, D.E. Cooper Plant Manager fjc Attachment NRC Region Ill INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis J.R. Sampson B.L. Bartlett P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G: John D.P. Lynch R.G. Pickard

~ p,",08'7 G.T. Gaffney 9807f50254 980630 PDR ADOCK 050003%6 R PDR

0 0 4 r"

,Qd}

. I fV~

0

DOCKET NO. 50- 316 DATE July 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Jun-98
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 4344.0 179664.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 66.6
20. Unit Availability Factor 0.0 0.0 66.6
21. Unit Capacity Factor (MDC Net) 0.0 0.0 60.7
22. Unit Capacity Factor (DER Net) 0.0 0.0 59.1
23. Unit Forced Outage Rate 100.0 100.0 16.9
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE July 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

June 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 6/I/98 6/17/98 6/2/98 6/18/98 6/3/98 6/19/98 6/4/98 6/20/98 6/5/98 6/21/98 6/6/98 6/22/98 6/7/98 6/23/98 6/8/98 6/24/98 6/9/98 6/25/98 6/10/98 6/26/98 6/1 I/98 6/27/98 6/12/98 6/28/98 6/13/98 6/29/98 6/14/98 6/30/98 6/15/98 6/16/98

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE July 6, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - June 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of June was 0 MWh.

DETAILS'6/01/98 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 ~,

DATE July 6, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - June 1998 METHOD OF SHUTllNG LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON~ REACTOR3 REPORT NO. CODE'ODE TO PREVENT RECURRENCE 335 010798 F 720.0 NIA NIA NIA The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)