Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With
ML17335A484
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1998
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9901210149
Download: ML17335A484 (7)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9901210149 DOC.DATE: 98/12/31 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME.

AUTHOR AFFILIATION MINOR,J.W.

American Electric Power Co., Inc.

CENTER,J.F.

American Electric Power Co., Inc.

COOPER,D.E.

American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1998 for DC Cook Nuclear Plant, Unit 1.With 990108 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME STANG,J COPIES LTTR ENCL 1

1 INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 1

1 1

1 1

1 RGN3 NOAC CE R

01 1

1 1

1 1

1 tlEK~RKKW NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

+ ~,

~ ~

~

~

American Electric Po~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 January 8, 1999 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1

Technical Specification 6.9.1.8, the attached Monthly Operating Report for the month of December 1998 is submitted.

Since ly, D.E. Cooper Plant Manager

/jc Attachment 990i2i0i49 PDR ADQCK R

NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis R.P. Powers J.R., Sampson B.L. Bartlett P.A. Barrett J.B. Kingseed D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G. John D.P. Lynch R.G. Pickard G.T. Gaffney 98i23i 050003i5 PDR Zy<

l

~ ~

~

~

DOCKET NO.

DATE COMPLETED BY TELEPHONE 50 - 315 January 8, 1999 JW Minor 616-465-5901 D. C OPERATING STATUS

1. Unit Name
2. Reporting Period
3. Licensed Thermal Power (MWt)
4. Name Plate Rating (Gross MWe)
5. Design Electrical Rating (Net MWe)
6. Maximum Dependable Capacity (GROSS MWe)
7. Maximum Dependable Capacity (Net MWe)

Cook Unit1 Dec-98 3250 1152 1020 1056 1000 Notes:

8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, IfAny (Net Mwe):
10. Reasons For Restrictions, IfAny:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 8760.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 210384.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 71.4 71.4 65.1 63.5 12.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. IfShut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE 50- 315 D.C. Cook Unit 1 January 8, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

December 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 12/1/98 12/2/98 12/3/98 12/4/98 12/5/98 12/6/98 12/7/98 12/8/98 12/9/98 12/10/98 12/11/98 12/12/98 12/13/98 12/14/98 12/15/98 12/16/98 12/17/98 12/18/98 12/19/98 12/20/98 12/21/98 12/22/98 12/23/98 12/24/98 12/25/98 12/26/98 12/27/98 12/28/98 12/29/98 12/30/98 12/31/98

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 January 8, 1999 JF Center 616-697-5098 1 of1 MONTHLYOPERATING ACTIVITIES-December 1998 HIGHLIGHTS Th'e unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of December was 0 MWh.

DETAILS

'2/01/98 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

'IItimes are in Eastern Standard Time (EST).

DOCKET NO.

UNITNAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1 January 8, 1999 JF Center 616-697-5098 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS December 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.

DATE TYPE" HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F

744.0 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source