CATEGORY 1 rS REGULATORY INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:9806190068 DOC.DATE: 98/05/31 NOTARIZED: NO DOCKET FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION MINOR,J.W. . Indiana Michigan Power Co; CENTER,J.F'; 'ndiana Michigan Power Co.

COOPER,D.E. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1998 for DC Cook Nuclear Plant, Unit 2.W/980609.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL " ID CODE/NAME LTTR ENCL PD3-3 PD 1 1,. S TANG, J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CENTER 1 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

American Electric Power Cook Nudear Plant One Cook Place Bndgman, Ml 49106 616 465 5901

(

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 June 9, 1998 Gentlemen, Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1998 is submitted.

Sincerely, D.E. Cooper Plant Manager

/jc Attachment NRC Region III INPO Records Center ANI Nuclear Engineering Department D.R. Hahn S. Hamming B. Lewis J.R. Sampson B.L. Bartlett P.A. Barrett S.J. Brewer D.W. Paul D.L. Noble W.H. Schalk D.G. Turner G..John D.P. Lynch R.G. Pickard G.T. Gaffney 9806i90068 'rr80531 PDR ADQCK 050003ih R PDR

N.R.C. OPERATING DATA REPORT DOCKET NO. 50 - 316 DATE June 9, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period May-98
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 3624.0 178944.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electricai Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 66.9
20. Unit Availability Factor 0.0 0.0 66.9
21. Unit Capacity Factor (MDC Net) 0.0 0.0 61.0
22. Unit Capacity Factor (DER Net) 0.0 0.0 59.4
23. Unit Forced Outage Rate 100.0 100.0 16.4
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE June 9, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

May 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 5/1/98 5/17/98 0 5/2/98 5/18/98 0 5/3/98 5/19/98 0 5/4/98 5/20/98 0 5/5/98 5/21/98 0 5/6/98 5/22/98 0 5/7/98 5/23/98 0 5/8/98 5/24/98 0 5/9/98 5/25/98 0 5/10/98 5/26/98 0 5/11/98 5/27/98 0 5/12/98 5/28/98 0 5/13/98 5/29/98 0 5/14/98 5/30/98 0, 5/15/98 5/31/98 0 5/16/98

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE June 9, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - May 1998 HIGHLIGHTS The unit entered this reporting period in Mode 6 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of May was 0 MWh.

DETAILS'5/01/98 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

All time entries are Eastern Standard Time (EST).

C DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE June 9, 1998 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1of3 e'NIT SHUTDOWNS AND POWER REDUCTIONS - Nlay 1998 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON~ REACTOR~ REPORT NO. CODE'ODE TO PREVENT RECURRENCE 335 010798 F 744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)